Search Jobs
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work (SOW)
Proper Dressing of Electrical & ELV Cables – Building Common AreasProper dressing, alignment, segregation, tagging, and securing of all electrical and ELV cables above the false ceiling in all building common areas (lobbies, corridors, lift lobbies, basements, staircases, and service areas).
The contra...
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Replacement of Aircraft Warning Light
Dismantling of existing faulty Aircraft Warning Light.
Supply and installation of new Warning Light.
Cable checking, re-routing, and reconditioning as required.
Replacement of damaged cables, glands, lugs, and conduits (if required).
Proper termination, earthing,...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Booster Pump (1 Set – 1 Duty + 1 Standby) - 1 no
Brand: Grundfos
Model: CM15-2
Configuration: 1 Duty + 1 Standby
Power: 3 HP / 2.3 kW
Phase: 3 Phase
Frequency: 50 Hz
Rated Flow: 17 m³/hr
Max Head: 29.67 meters
Suction & Discharge: 2” x 2”
Pressure Switch: Telemecanique
Manifold: Stainl...
Gypsum Ceiling Damage (JB004-26-00876)
Break Down
Residential
La Fontana Apartments, Arjaan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Gypsum Ceiling DamageRoot cause
Water leakage from AC drain lines and condensation. Gypsum ceiling not suitable for repeated removal during maintenance. Limited access panels, resulting in recurring damage.Correction of AC drain water leakage also to prevent any damage. remove the
existing gypsum ceiling ...
Mechanical Electrical Plumbing (MEP) Break Down (JB1099-26-01059)
Break Down
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,We are inviting you to visit the site and check the requirement of Transfer pump Delivery line replacement works as per given scope of works.For site visit and more clarification, please coordinate with Mr Aathif (FM Engineer) : +971 56 992 0136Thank you.
sewage pump Rectification (JB004-26-00875)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
STATEMENT OF PROBLEM:
16 kW sewage pump No. 2 found not operating normally.
Electrical testing showed pump winding not showing continuity.
Lack of continuity indicated a winding fault.
Further inspection revealed the pump contactor was stuck.
Stuck contactor caused phase failure.
Phas...
Water leakage from ceiling. CHW pipeline insulation damaged (JB004-26-00874)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water leakage from common area ceiling. CHW pipeline insulation damaged.Rectification and replacement of damaged CHW pipeline insulation. Cutting of ceiling sections where access is not available for insulation works.
Removal of ceiling portions damaged due to water leakage from the CHW pipelines.
Re-fixin...
CPVC flange T and Elbow failure (JB004-26-00873)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
CPVC flange T and Elbow failure Water leakage observed during routine inspection
Leakage identified at the CPVC flange connection
Crack detected in the CPVC T-joint
CPVC elbow found damaged and unsuitable for continued useReplace damaged CPVC components:
CPVC flange with gasket (4 bolts) – 75 mm ×...
domestic water GRP tanks Damage (JB004-26-00872)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
domestic water GRP tanks Damage Tank No. 1:
Dimensions: 5.0 m × 5.0 m × 3.5 m Condition: Very poor condition
o Cracks observed on external GRP panels
o Internal panels and joints are severely damaged.Tank No. 2:
Dimensions: 6.0 m × 5.0 m × 3.5 m Condition: Poor condition
o Internal supporting joints found broke...
Supply of Coupling joint (JB1099-26-01057)
Product
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Please share the proposal for the Supply of Coupling joint as per given images and specifications.SHURJOINT 10" 273.0 MMQUANTITY - 2 NosThank you.
replacing the Pressure Reducing Valve (JB004-26-00870)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
replacing the Pressure Reducing Valve PRVs (2½” size) QTY 32 • Replacement of faulty PRVs and butterfly valves is recommended to prevent further damage. Note: Please do the site visit before submitting the quotation.
replacement of the PRV and gate valve (JB004-26-00869)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of the PRV and gate valve is advised to restore consistent water pressure QTY 022” PRV and gate valve assembly.PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM
Installation A. Supply & installation of Butterfly valve with necessary
flanges & fittings accessories.B. Carryout installation of PRV with...
Supply of Electrical Consumables (JB1099-26-01056)
Product
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Could you please share the proposal for supply of electrical consumables as per attached below BOQ.
Chillers, HVAC, FAHU, FCU Break Down (JB1099-26-01055)
Break Down
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and check the requirement of AHU Coil replacement at reception area. Here with given below scope of works to proceed for the proposal.For site visit and more clarifications, Please coordinate with Mr Aathif (FM Engineer) : +971 56 992...
Painting, Wood, Glass etc. Break Down (JB1099-26-01054)
Break Down
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Kindly visit the site and check the requirement of Damage of SS pillar cladding. Herewith given the specification of steel plate for your reference and proposal.Size - 150cm x 272cmMaterial Grade - Stainless Steel 316L Thickness - 1mmFor site visit and more clarification , please coordinate with Mr Aathif (F...
cracked balcony façade glass (JB004-26-00868)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
cracked balcony façade glass it is recommended to replace the cracked balcony façade glass
panel
Mechanical Electrical Plumbing (MEP) Break Down (JB1099-26-01053)
Break Down
Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and share the proposal for the MEP Leakage works at chilled water supply line.Herewith attached scope of works for your kind reference and best proposal.For site visit & More clarifications, please coordinate with Mr Aathuf (FM En...
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of FHRC Doors Damage and Corridor CHW Insulation — Tamweel TowerScope of Work;Carry out detailed site survey of all floors to identify FHRC doors damaged due to humidity and condensation.Inspect corridor CHW pipelines and existing insulation to identify sweating, insulation failure, and moisture ingress points.R...
Specialised Systems Break Down (JB1099-26-01052)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Service Provider,
Greetings from Strata Global!
Kindly
arrange a site visit and send us your best proposal in Marina Arcade,
located in Dubai Marina, Dubai.
Job
Title:
Supply and Installation of Bicycle Parking Stand
Qty – 3 nos
For
more details and site visit, please contact ...
balcony glass fencing completely broken (JB004-26-00857)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony glass fencing completely brokenThe broken balcony glass needs to be replaced immediately to ensure safety and restore the fencing.The size of the broken glass is approximately 1300 mm x 1000 mm.
Domestic Water GRP Tanks damaged from inside (JB004-26-00855)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the routine water tank cleaning, found the inside damages of GRP Tanks two GRP tanksTank size location 1: Tank No.1 is 5 mtr x 5 mtr x 3.5 mtr Tank No.2 is 6 mtr x 5 mtr x 3.5 mtr Tank Size Location 2:Tank No.1 is 5 mtr x 4 mtr x 4 mtr floor Tank No.2 is 5 mtr x 4 mtr x 4 mtrNeed to the empty t...
Generator Break Down (JB1099-26-01051)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Service Provider,
Greetings from Strata Global!
Kindly
arrange a site visit and send us your best proposal in Marina Arcade,
located in Dubai Marina, Dubai.
Job
Title:
Painting 1000kva Pekins Engine Diesel Generator
Engine Model: 4012-46TAG2A, Engine
Serial No: DGBM6302-U19938W
Scope
of ...
balcony side glass broken (JB004-26-00853)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony side glass brokenReplace the damaged balcony glass with a new panel and carry out the necessary corrective work,
including cleaning or repairing the affected side tiles.
Repair of Main Water Pipe line (4th,5th,6th,12th,13th floor) (JB2190-26-00038)
Break Down
Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Water Pipe Leakage Repair (Floors 4, 5, 6, 12 & 13)
Conduct site inspection and identify exact leakage points on all affected floors.
Isolate water supply lines as required and ensure safety precautions are in place.
Break open/remove necessary ceiling or wall access panels to reach leaking pipe sections.
Re...
water leakages at the site during rainfall (Facade) (JB004-26-00851)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
water leakages at the site during rainfall (electrical room leakage) Solution for water leak complains
Need to remove old silicon of façade glass and apply new silicon by rope access/cradle. Apply new highquality, weather-resistant silicone sealant to the entire façade glass area to prevent further water ingress.&...
Mechanical Electrical Plumbing (MEP) Break Down (JB1099-26-01050)
Break Down
Mixed Use
DIFC, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Service Provider,
I
hope this email finds you well.
Kindly
send us your proposal for the Wooden Curtain rectification works. Kindly send a separate proposal
for each location, respectively.
Project Name : “Emirates
Financial Towers” located in DIFC, Dubai
Scope : Supply and
installation of str...
Concrete Slab Crack Repair – Parking Area Basement 3 (JB2190-26-00041)
Break Down
Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Appointment of Durability / Structural Engineering ConsultantConcrete Slab Crack Repair – Parking Area1. ObjectiveTo appoint a licensed durability/structural engineering consultant to prepare the complete repair design package, including detailed scope of work, technical specifications, BOQ, drawings, and authority approvals ...
Proposal for the Glass Door Floor Machine Replacement- Diamond (JB004-26-00834)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Glass Door Floor Machines
Proposal for replacement quote of Dorma floor machine at The Diamond Tower—7 nos.Site visit—mandatory
AC Vibration and Noice Issue (JB004-26-00850)
Break Down
Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A total of 16 outdoor AC units is installed on the rooftop area vibration and noise levels.Scope of Work: Carry out preventive maintenance and complete fan motor inspection and servicing for all 16 AC units
at the earliest to reduce vibration and noise levels and to ensure smooth and efficient operation. • The exist...
Break Down
Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. General Scope
The Contractor shall carry out complete rectification works for the Swimming Pool, Jacuzzi Pool, Deck Area, Passage Area, and Shower Area, including dismantling, waterproofing, tiling, crack repairs, and associated civil & plumbing works as described below.
All works shall be executed as per approved mat...
Swimming Pool Fence glasses is damaged (JB004-26-00848)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool Fence glasses is damaged Swimming Pool Area Fence Glass: (8 No. of Glasses)• Removal of Existing Damaged Glass. • Supply and Installation of Fence glass with required accessories. SPECIFICATION: 10 MM CLEAR TEMPERED GLASS. (7 Glass Size – Length 98 CM & Height – 123 CM) (1 Glass Size...
Supply and Installation of Split AC unit (1 Ton) (JB004-26-00846)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
• Installation of a 1 Ton split-type air conditioning unit is
required for the GSM room. • Proper electrical power supply, drainage, and piping
provisions should be arranged as per site conditions.• Supply and installation of Split Air Conditioning Unit. • Brand: Super General – 1 Ton Capacity (R410A Refrigerant
Gas...
Flood Light Installation (JB004-26-00844)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation of additional 3 no. flood lightsSupply and Installation of Conduit Pipeline • Supply and install conduit pipelines in three designated areas as per site requirements.
Cable Pulling Works • Pull and arrange electrical cables through the newly installed conduit pipelines, ensuring proper
routing, protecti...
Supply and Installation of Steel Walkway Platform (JB004-26-00843)
Break Down
Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
REPLACEMENT OF STEEL PLATE PROTECTION OF AC AND DRAIN PIPELINE AND SUPPLY AND INSTALLATION OF STEEL
WALKWAY PLATFORMSCOPE OF WORK: Replacement of Steel plate protection • Removal of existing damaged protection plate on roof area. • Supply and Installation of Steel Protection plate. SCOPE OF WORK: Supp...
Swimming Pool lounger cushion damaged (JB004-26-00839)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool 8 No. of lounger cushion damagedwe highly recommend replacing the existing cushions with weather resistant sunbeds to ensure durability and maintain hygiene standards.Specification: (Wheater proof Material) Length: 181 CM Width: 54 CM Thickness : 4.5 CM
swimming pool deck area floor tiles are damaged (JB004-26-00838)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
swimming pool deck area floor tiles are damaged 567 SQ. MTR.• Remove all existing damaged and uneven tiles completely from the pool deck area. • Clean and level the existing surface properly to ensure a smooth and stable base for tile installation. • Apply a suitable waterproofing layer over the entire area, en...
FAHU Filters need to replace (JB004-26-00831)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the PPM we found, the Pre filters and Bag Filters of all FAHU damaged condition.We have 08 nos of FAHUFAHU – 1
Model: 03MKP12CD2HGR+CDT+REC
S.NoDescriptionSizeQty Unit1Pre Filter (Supply)590 x 590 x 45 mm 6Nos2Bag Filter (6 Pocket, 460mm depth)590 x 590 x 20 mm 6Nos3Pre Filter (Return)495 x 495 x 50 mm...
Water Leakage couse power tripping (JB004-26-00830)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the initial inspection, our team confirmed that the power tripping was
caused by water entering the electrical wiring.SOLUTION: Full waterproofing of all affected washrooms.
Re-grouting of tiles where necessary.
Application of high-grade silicone sealant around the bathtub and other identified gaps.Please...
Civil & Architectural Break Down (JB1099-26-01034)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site visit and check the requirement of Atrium Entrance Floor Granite replacement works . Herewith attached scope of works for your kind review and proposal.Kindly also Include the warranty details.For site visit & more clarificat...
Lift, Elevator & Escalators Break Down (JB1099-26-01033)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,We are pleased to invite to please share the proposal for Supply & Installation of Cabin Protection pad- 2 Nos.@GANESH | ISHA TECH Could you please share the size of Cabin for the proposal.For site visit and more Clarification , Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 5563Thank ...
Pumps & Motors Break Down (JB1099-26-01032)
Break Down
Mixed Use
DIFC, Dubai, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders, I hope this email finds you well.We are pleased to invite you to visit the site and share the proposal for the Supply & Installation of New Booster pump and Transfer pump. Herewith given below the scope of works including Brand and capacity.Residence Tower – RooftopSupply of new booster pump (1 No.)Bran...
Repair and Overhaul of Basement Transfer Pump (JB004-26-00829)
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
To repair the faulty transfer pump, restore reliable operation, eliminate abnormal noise, and ensure proper water transfer by replacing defective components and performing full mechanical servicing.Inspection & Diagnosis;Isolate pump electrically and hydraulically.Conduct detailed inspection of pump, motor, bearings, coup...
Break Down
Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work - Application of epoxy floor coating at ground Floor car parking and drive way area ( Quantity 2200 Sq Mtr approx.)1) Application of epoxy floor coating works in ground
floor car parking area and driveway floor with pa...
Civil & Architectural Break Down (JB1099-26-01029)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and check the requirement of GRP Lining for Swimming Pool area. Herewith attached image for your kind reference.Could you please share the proposal.For site visit & more clarifications, Please coordinate with Mr. Abuthakir (FM Eng...
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water was leaking from the shattaf (handheld bidet). It was also observed that proper waterproofing was not in place, contributing to
the extent of the leakage.The shattaf must be replaced immediately to prevent further leakage.
The affected area requires proper waterproofing with a minimum 10-year warranty
to en...
Rain Water leakage (Facade) (JB004-26-00818)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Possible water entry through the façade glass system was investigated.
Further inspection confirmed water leakage through damaged silicone sealant at the external façade glass joints. The deterioration of the silicone sealant is likely due to ageing and prolonged exposure to sunlight and weather
conditions. Huge leaks...
ceiling damaged due to water seepage (JB004-26-00817)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
ceiling damaged due to water seepage.Replace the damaged bathtub, repair or replace the water lines, and apply new silicone sealant
properly in Unit 410.
Waterproof the bathtub area and the entire washroom, ensuring a minimum 10-year
waterproofing warranty and repair all damaged assets an urgent basis, including c...
CCTV System Upgrade in Compliance with Latest SIRA Law (JB004-26-00816)
Compliance
Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – CCTV System Upgrade with ANPR IntegrationProject Location: Al Furjan , Dubai, United Arab EmiratesDetailed Scope of Work;Conduct detailed site assessment of existing CCTV and access control infrastructure.The vendor shall be fully responsible for preparing and submitting all technical documents,...
Entrance area Marble damaged (JB004-26-00814)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entrance area Marble damagedThe reasons for the damages will be the damaged surface sealant of marble by weather exposure and foot
traffic.Need to remove existing travertine and dark marble about 50 sq.m at building entrance
Replace the damaged marble about 50 sq.m same design
FAHU 2 Cooling coil leak (JB004-26-00813)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
FAHU 2 Cooling coil leak found the heavy water leak at FAHU 2FAHU Make: MEKAR, Model: 03MKP12CD2HGR+CDT+RECNeed to repair the Copper coil immediately since FAHU supply air is essential to prevent the humidity at
common area.Note: Kindly do the site visit before submitting the quotation.