Search Jobs

Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the PPM we found, the Pre filters and Bag Filters of all FAHU damaged condition.We have 08 nos of FAHUFAHU – 1 Model: 03MKP12CD2HGR+CDT+REC S.NoDescriptionSizeQty Unit1Pre Filter (Supply)590 x 590 x 45 mm  6Nos2Bag Filter (6 Pocket, 460mm depth)590 x 590 x 20 mm  6Nos3Pre Filter (Return)495 x 495 x 50 mm...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the initial inspection, our team confirmed that the power tripping was caused by water entering the electrical wiring.SOLUTION: Full waterproofing of all affected washrooms.  Re-grouting of tiles where necessary.  Application of high-grade silicone sealant around the bathtub and other identified gaps.Please...
Break Down Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site visit and check the requirement of Atrium Entrance Floor Granite replacement works . Herewith attached scope of works for your kind review and proposal.Kindly also Include the warranty details.For site visit & more clarificat...
Break Down Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,We are pleased to invite to please share the proposal for Supply & Installation of Cabin Protection pad- 2 Nos.@GANESH | ISHA TECH Could you please share the size of Cabin for the proposal.For site visit and more Clarification , Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 5563Thank ...
Break Down Mixed Use
DIFC, Dubai, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders, I hope this email finds you well.We are pleased to invite you to visit the site and share the proposal for the Supply & Installation of New Booster pump and Transfer pump. Herewith given below the scope of works including Brand and capacity.Residence Tower – RooftopSupply of new booster pump (1 No.)Bran...
Break Down Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
To repair the faulty transfer pump, restore reliable operation, eliminate abnormal noise, and ensure proper water transfer by replacing defective components and performing full mechanical servicing.Inspection & Diagnosis;Isolate pump electrically and hydraulically.Conduct detailed inspection of pump, motor, bearings, coup...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
           Scope of work -  Application of epoxy floor coating at ground Floor car parking and drive way area             ( Quantity 2200 Sq Mtr approx.)1) Application of epoxy floor coating works in ground floor car parking area and driveway floor with pa...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and check the requirement of GRP Lining for Swimming Pool area. Herewith attached image for your kind reference.Could you please share the proposal.For site visit & more clarifications, Please coordinate with Mr. Abuthakir (FM Eng...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water was leaking from the shattaf (handheld bidet). It was also observed that proper waterproofing was not in place, contributing to the extent of the leakage.The shattaf must be replaced immediately to prevent further leakage.  The affected area requires proper waterproofing with a minimum 10-year warranty to en...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Possible water entry through the façade glass system was investigated.  Further inspection confirmed water leakage through damaged silicone sealant at the external façade glass joints. The deterioration of the silicone sealant is likely due to ageing and prolonged exposure to sunlight and weather conditions. Huge leaks...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
ceiling damaged due to water seepage.Replace the damaged bathtub, repair or replace the water lines, and apply new silicone sealant properly in Unit 410.  Waterproof the bathtub area and the entire washroom, ensuring a minimum 10-year waterproofing warranty and repair all damaged assets an urgent basis, including c...
Compliance Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – CCTV System Upgrade with ANPR IntegrationProject Location: Al Furjan , Dubai, United Arab EmiratesDetailed Scope of Work;Conduct detailed site assessment of existing CCTV and access control infrastructure.The vendor shall be fully responsible for preparing and submitting all technical documents,...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entrance area Marble damagedThe reasons for the damages will be the damaged surface sealant of marble by weather exposure and foot traffic.Need to remove existing travertine and dark marble about 50 sq.m at building entrance  Replace the damaged marble about 50 sq.m same design
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
FAHU 2 Cooling coil leak found the heavy water leak at FAHU 2FAHU Make: MEKAR, Model: 03MKP12CD2HGR+CDT+RECNeed to repair the Copper coil immediately since FAHU supply air is essential to prevent the humidity at common area.Note: Kindly do the site visit before submitting the quotation. 
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — Garbage Chute System (Comprehensive)Scope of Work;Asset Description1 No. Garbage Chute System (Building configuration as installed)Garbage collection trolleys serving the buildingService Frequency;Monthly preventive maintenance — 12 visits per yearChute high-pressure washing and disinfection — Qu...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entrance lobby FCU Coil leakNeed to cut the Gypsum and wood ceiling for FCU access Need to replace the FCU since the repairing of copper coil is not possible.  Need to restore the ceiling as before.FCU Make: SINKO, Model: SRC1400HWSHNOTE: Kindly do the Site Visit before Submitting the Quotation. 
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony glass broken • Install a new tempered safety glass panel matching the original specifications. • Ensure the glass thickness, dimensions, and strength comply with building safety standards. • Use secure fittings and brackets designed to withstand wind loads and external pressure. • Check and tighten all ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Building Aircraft warning Lights are not working.Need to be replace/repair existing aircraft warning light system Suggestion ➢ Solar powered LED Aircraft warning light installing in designed area (as per approved specialist advice) Benefit of Solar powered LED ➢ light will be operating automatically, required less m...
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — Façade Cleaning (External Glass Cleaning)Scope of Work;The Contractor shall carry out external façade glass cleaning (normal wash) for Maria Tower using approved methods, equipment, and trained personnel to restore cleanliness and maintain building appearance.Service Frequency;One time external f...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
we mentioned to replace the old model lights to LED at common areas .The old model CFL producing more heat and more power consumption. Average life span of CFL is 10,000 hours and the sequence of damage is more SOLUTION:  Need to replace the old CFL with LED  LED having more life span than CFL and the mainte...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 The GYM is equipped with two AC units installed above the ceiling.  Upon investigation, the following factors were identified as affecting the cooling efficiency:   High Ceiling: The increased height between the GYM ceiling and roof ceiling reduces the effectiveness of conditioned air circulation, causing uneven ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 On routine inspection, team found that the wall papers are damaged at 36 and 38 Floors corridor and Lift lobby The wall papers have two type of design and most of the areas are in removed condition from wall These damages due to aging and need to replace. Wall papers need to replace following:-Area 1Corridor Left ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Reception signage wall paper damaged Recommended to replace the signage wall paper with existing design.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Need to remove all the old paint from the wall Clean and finish the wall areas properly Need to do the painting with existing color about 9220 sq.m.NOTE: Kindly do the site visit before submitting the quotation, we will not accept any variatioan after work order.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of the main control unit along with a retrofit kit, which includes motors, sensors, pinion and rubber supports are required to restore proper operation of the revolving door
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Mechanical room Booster pump pressure vessel line leak and Rubber flexible joint crack at discharge line. During routine inspection, we found that the water leak at Pressure vessel old MS line which is connected to discharge header of booster pump in Mechanical room. On further investigation, we found minute crack at R...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 It has been observed that wall protection and corner protection at main garbage room damaged. The rubber guard damaged due to the ageing and impact from Garbage trolley movement.The wall and corner of garbage room damaging in the absence of protection.Need to install heavy duty Rubber wall guard and corner protector at garb...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 During routine inspection we found that the Roof Facade Coping panels (02 nos) near swimming pool are in broken condition.The damage is clearly visible from swimming pool area. The panel welding broken and in hazardous situation.This damage by ageing and rusting of panel. These damaged panels need to be reinstated / replac...
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — Lifeguard ServicesScope of Work;ManpowerMale Lifeguard — 1 noThe Contractor shall deploy a qualified lifeguard to supervise the swimming pool during operational hours and ensure safety of pool users.Scope of Services;Pool Supervision & SafetyMaintain constant vigilance over the swimming pool ...
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — MEP & HousekeepingScope of Work;Manpower — MEPFM Supervisor — Shared resource — 1 noMulti Technician — Full time — 1 noWorking Schedule — 6 days per week — 12 hours per dayThe Contractor shall ensure uninterrupted service delivery with the above manpower.Manpower — Cleaning;Cleaners — Full ti...
Contract Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — Lifeguard ServicesScope of Work;ManpowerLifeguard (Male) — 1 noWorking Hours — 12 hours (9:00 AM to 9:00 PM) — 7 days per weekDuty Location — Swimming Pool AreaThe Contractor shall ensure continuous lifeguard coverage during pool operational hours.General Terms and Requirements;Contractor shall o...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM InstallationA. Supply & installation of Butterfly valve with necessaryflanges & fittings accessories.B. Carryout installation of PRV with accessories.C. Carryout necessary PPR works. - 2 Nos
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Replacement of Facade Glasses:Ten (10) façade glass panels at Jewellery and Gemplex Buildings 1, 2, and 3 have developed visible cracks. The deterioration is likely attributed to prolonged thermal stress, climatic variations, and continuous environmental exposure since their installation in 2004. These cracks com...
Break Down Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Capacitor Panel No. 7 is currently non-operational due to defective components. The following issues have been identified: Three (3) capacitor coils are burnt and require replacement. One (1) contactor is burnt and requires replacement. Burnt/damaged wiring must be replaced. The blue indicator lamp is not functio...
Contract Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — MEP & HousekeepingScope of Work;Manpower — MEP;Facility Supervisor — Shared resource — 1 noHVAC Technician — Full time — 1 noMulti Technician — Full time — 1 noThe Contractor shall ensure uninterrupted service delivery with the above manpower.Manpower — Cleaning;Housekeeping Supervisor — Shar...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work - Entire building  External Facade painting after rectification of damaged plaster and crack. (Including ceiling and column  area, and wall area, firefighting pipeline painting) if any drainage pipeline needs to rectify) To clean all the affected surfaces across the entire building elevations, rem...
Contract Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract — MEP & Housekeeping - BUILDING COMMON AREAScope of WorkManpower — MEP;Facility Supervisor — Shared resource — 1 noHVAC Technician — Full time — 1 noMulti Technician — Full time — 1 noThe Contractor shall ensure uninterrupted service delivery with the above manpower.Manpower — Cleaning;Housekee...
Services Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
All Active and Passive Fire & Life Safety Systems Across the Building.Objective;To conduct a detailed and independent audit of all fire and life safety systems at Maria Tower to evaluate operational condition, verify compliance with Dubai Civil Defense and UAE Fire & Life Safety Code requirements, identify deficiencie...
Services Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entire Building — Common Areas, Systems, Infrastructure, and Documentation (excluding Fire & Life Safety systems)Objective;To conduct a comprehensive technical and documentation audit to assess the physical condition of building systems, verify completeness of handover documentation, identify defects, risks, operational g...
Services Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entire Building — Common Areas, Systems, Infrastructure, and Documentation (excluding Fire & Life Safety systems)Objective;To conduct a comprehensive technical and documentation audit to assess the physical condition of building systems, verify completeness of handover documentation, identify defects, risks, operational g...
Services Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entire Building — Common Areas, Systems, Infrastructure, and Documentation (excluding Fire & Life Safety systems)Objective;To conduct a comprehensive technical and documentation audit to assess the physical condition of building systems, verify completeness of handover documentation, identify defects, risks, operational g...
Services Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Reserve Fund Study & Asset Tagging — Maria TowerStructure: Basement + Ground + 13 Floors + RoofUsage: Residential BuildingObjective;To conduct a comprehensive Reserve Fund Study supported by a full asset tagging exercise for Maria Tower, establishing a verified inventory of all common area assets, assessing their conditio...
Break Down Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
1. Transfer Pump Repair Inspect the transfer pump body for damage. Repair/replace cracked pump body as required. Rectify leakage and ensure proper sealing. Carry out testing and recommissioning after repair. 2. Valve Rectification Inspect leaking gate valve and carry out necessary repair or replacement. Remove a...
Break Down Mixed Use
Business Bay, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite to visit the site and share the proposal for Marble Restoration works. Herewith attached scope of works for your kind reference.For site visit and more clarifications, Please coordinate with Mr Sreehari (FM Engineer) : +971 50 336 0185Thank you.
Services Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Consultancy Services for Cost Allocation Study in Compliance with RERA Service Charge Regulations, Maria TowerProject DetailsProject Title: Cost Allocation Study — Maria Tower Location: Dubai, UAE Structure: Basement + Ground + 13 Floors + Roof Usage: Residential Building with Common Facilities and ParkingObjectiveTo conduct ...
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract for Domestic Water Distribution Pipe Line Disinfection Services, Maria TowerAsset Description:Domestic Water Distribution Circuit — 1 No.The scope covers the complete domestic potable water distribution network including risers, horizontal distribution lines, valves, outlets, and associated compone...
Contract Residential
Madinat Al Mataar, Dubai, United Arab Emirates
Posted By: Pulse Point For Owner Association Management Services EST
·        Weekly maintenance services of following system Ø  Landscaping   Scope of works ·        Weekly 3-time visit ·        Deteriorating flowers and foliage should be removed as required...
Contract Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract for Water Tank Cleaning & Disinfection (Maria Tower)Assets Covered;The contractor shall carry out cleaning and disinfection services for the following potable water storage tanks:RCC Water Tank — Basement Level 2 — Approx. 80,000 USG capacityGRP Water Tank — Roof Level — Approx. 12,000 USG capa...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: The contractor shall supply, deliver, and install fire-rated doors complete with frames and all required accessories as per the specifications below. All dimensions are approximate and shall be verified during the mandatory site visit prior to fabrication and installation. Technical Specifications Door Type:...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 EXCELAIR ULTRAPAC BAG FILTER EFF F8/95% FRAME GI 20MM(SIZE 590MM(W) X 590MM(H) X 534MM(D),6P) – 20 No. EXCELAIR ULTRAPAC POLYFIBER PLEATED FILTER GRADE G4 FRAME GI BOTH SIDE PVC MESH(SIZE 590MM(W) X 590MM(H) X 45MM(D)) – 16 No. EXCELAIR ULTRAPAC POLYFIBER PLEATED FILTER GRADE G4 FRAME GI BOTH SIDE PVC MESH(SIZE 590MM(W) X...