Search Jobs

Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work (SOW) Proper Dressing of Electrical & ELV Cables – Building Common AreasProper dressing, alignment, segregation, tagging, and securing of all electrical and ELV cables above the false ceiling in all building common areas (lobbies, corridors, lift lobbies, basements, staircases, and service areas). The contra...
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Replacement of Aircraft Warning Light Dismantling of existing faulty Aircraft Warning Light. Supply and installation of new Warning Light. Cable checking, re-routing, and reconditioning as required. Replacement of damaged cables, glands, lugs, and conduits (if required). Proper termination, earthing,...
Break Down Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Booster Pump (1 Set – 1 Duty + 1 Standby) - 1 no Brand: Grundfos Model: CM15-2 Configuration: 1 Duty + 1 Standby Power: 3 HP / 2.3 kW Phase: 3 Phase Frequency: 50 Hz Rated Flow: 17 m³/hr Max Head: 29.67 meters Suction & Discharge: 2” x 2” Pressure Switch: Telemecanique Manifold: Stainl...
Gypsum Ceiling Damage (JB004-26-00876)
Break Down Residential
La Fontana Apartments, Arjaan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Gypsum Ceiling DamageRoot cause Water leakage from AC drain lines and condensation. Gypsum ceiling not suitable for repeated removal during maintenance. Limited access panels, resulting in recurring damage.Correction of AC drain water leakage also to prevent any damage. remove the existing gypsum ceiling ...
Break Down Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,We are inviting you to visit the site and check the requirement of Transfer pump Delivery line replacement works as per given scope of works.For site visit and more clarification, please coordinate with Mr Aathif (FM Engineer) : +971 56 992 0136Thank you.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
STATEMENT OF PROBLEM:  16 kW sewage pump No. 2 found not operating normally.  Electrical testing showed pump winding not showing continuity.  Lack of continuity indicated a winding fault.  Further inspection revealed the pump contactor was stuck.  Stuck contactor caused phase failure.  Phas...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water leakage from common area ceiling. CHW pipeline insulation damaged.Rectification and replacement of damaged CHW pipeline insulation. Cutting of ceiling sections where access is not available for insulation works.  Removal of ceiling portions damaged due to water leakage from the CHW pipelines.  Re-fixin...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
CPVC flange T and Elbow failure Water leakage observed during routine inspection  Leakage identified at the CPVC flange connection  Crack detected in the CPVC T-joint  CPVC elbow found damaged and unsuitable for continued useReplace damaged CPVC components:  CPVC flange with gasket (4 bolts) – 75 mm ×...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
domestic water GRP tanks Damage Tank No. 1: Dimensions: 5.0 m × 5.0 m × 3.5 m Condition: Very poor condition o Cracks observed on external GRP panels o Internal panels and joints are severely damaged.Tank No. 2: Dimensions: 6.0 m × 5.0 m × 3.5 m Condition: Poor condition o Internal supporting joints found broke...
Product Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Please share the proposal for the Supply of Coupling joint as per given images and specifications.SHURJOINT 10" 273.0 MMQUANTITY - 2 NosThank you.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
replacing the Pressure Reducing Valve PRVs (2½” size)             QTY 32 • Replacement of faulty PRVs and butterfly valves is recommended to prevent further damage. Note: Please do the site visit before submitting the quotation. 
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of the PRV and gate valve is advised to restore consistent water pressure QTY 022” PRV and gate valve assembly.PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM Installation A. Supply & installation of Butterfly valve with necessary flanges & fittings accessories.B. Carryout installation of PRV with...
Product Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Could you please share the proposal for supply of electrical consumables as per attached below BOQ.
Break Down Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and check the requirement of AHU Coil replacement at reception area. Here with given below scope of works to proceed for the proposal.For site visit and more clarifications, Please coordinate with Mr Aathif (FM Engineer) : +971 56 992...
Break Down Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Kindly visit the site and check the requirement of Damage of SS pillar cladding. Herewith given the specification of steel plate for your reference and proposal.Size - 150cm x 272cmMaterial Grade - Stainless Steel 316L Thickness - 1mmFor site visit and more clarification , please coordinate with Mr Aathif (F...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
cracked balcony façade glass it is recommended to replace the cracked balcony façade glass panel
Break Down Residential
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and share the proposal for the MEP Leakage works at chilled water supply line.Herewith attached scope of works for your kind reference and best proposal.For site visit & More clarifications, please coordinate with Mr Aathuf (FM En...
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of FHRC Doors Damage and Corridor CHW Insulation — Tamweel TowerScope of Work;Carry out detailed site survey of all floors to identify FHRC doors damaged due to humidity and condensation.Inspect corridor CHW pipelines and existing insulation to identify sweating, insulation failure, and moisture ingress points.R...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   Kindly arrange a site visit and send us your best proposal in Marina Arcade, located in Dubai Marina, Dubai.   Job Title: Supply and Installation of Bicycle Parking Stand Qty – 3 nos   For more details and site visit, please contact ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony glass fencing completely brokenThe broken balcony glass needs to be replaced immediately to ensure safety and restore the fencing.The size of the broken glass is approximately 1300 mm x 1000 mm.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the routine water tank cleaning, found the inside damages of GRP Tanks two GRP tanksTank size location 1: Tank No.1 is 5 mtr x 5 mtr x 3.5 mtr Tank No.2 is 6 mtr x 5 mtr x 3.5 mtr Tank Size Location 2:Tank No.1 is 5 mtr x 4 mtr x 4 mtr floor Tank No.2 is 5 mtr x 4 mtr x 4 mtrNeed to the empty t...
Generator Break Down (JB1099-26-01051)
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   Kindly arrange a site visit and send us your best proposal in Marina Arcade, located in Dubai Marina, Dubai.   Job Title: Painting 1000kva Pekins Engine Diesel Generator Engine Model: 4012-46TAG2A, Engine Serial No: DGBM6302-U19938W Scope of ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony side glass brokenReplace the damaged balcony glass with a new panel and carry out the necessary corrective work, including cleaning or repairing the affected side tiles.
Break Down Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
 Water Pipe Leakage Repair (Floors 4, 5, 6, 12 & 13) Conduct site inspection and identify exact leakage points on all affected floors. Isolate water supply lines as required and ensure safety precautions are in place. Break open/remove necessary ceiling or wall access panels to reach leaking pipe sections. Re...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
water leakages at the site during rainfall (electrical room leakage) Solution for water leak complains  Need to remove old silicon of façade glass and apply new silicon by rope access/cradle. Apply new highquality, weather-resistant silicone sealant to the entire façade glass area to prevent further water ingress.&...
Break Down Mixed Use
DIFC, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   I hope this email finds you well.   Kindly send us your proposal for the Wooden Curtain rectification works. Kindly send a separate proposal for each location, respectively.   Project Name : “Emirates Financial Towers” located in DIFC, Dubai Scope : Supply and installation of str...
Break Down Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Appointment of Durability / Structural Engineering ConsultantConcrete Slab Crack Repair – Parking Area1. ObjectiveTo appoint a licensed durability/structural engineering consultant to prepare the complete repair design package, including detailed scope of work, technical specifications, BOQ, drawings, and authority approvals ...
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Glass Door Floor Machines Proposal for replacement quote of Dorma floor machine at The Diamond Tower—7 nos.Site visit—mandatory 
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A total of 16 outdoor AC units is installed on the rooftop area vibration and noise levels.Scope of Work: Carry out preventive maintenance and complete fan motor inspection and servicing for all 16 AC units at the earliest to reduce vibration and noise levels and to ensure smooth and efficient operation. • The exist...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. General Scope The Contractor shall carry out complete rectification works for the Swimming Pool, Jacuzzi Pool, Deck Area, Passage Area, and Shower Area, including dismantling, waterproofing, tiling, crack repairs, and associated civil & plumbing works as described below. All works shall be executed as per approved mat...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool Fence glasses is damaged Swimming Pool Area Fence Glass: (8 No. of Glasses)• Removal of Existing Damaged Glass. • Supply and Installation of Fence glass with required accessories. SPECIFICATION: 10 MM CLEAR TEMPERED GLASS. (7 Glass Size – Length 98 CM & Height – 123 CM) (1 Glass Size...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
• Installation of a 1 Ton split-type air conditioning unit is required for the GSM room. • Proper electrical power supply, drainage, and piping provisions should be arranged as per site conditions.• Supply and installation of Split Air Conditioning Unit. • Brand: Super General – 1 Ton Capacity (R410A Refrigerant Gas...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation of additional 3 no. flood lightsSupply and Installation of Conduit Pipeline • Supply and install conduit pipelines in three designated areas as per site requirements. Cable Pulling Works • Pull and arrange electrical cables through the newly installed conduit pipelines, ensuring proper routing, protecti...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
REPLACEMENT OF STEEL PLATE PROTECTION OF AC AND DRAIN PIPELINE AND SUPPLY AND INSTALLATION OF STEEL WALKWAY PLATFORMSCOPE OF WORK: Replacement of Steel plate protection • Removal of existing damaged protection plate on roof area. • Supply and Installation of Steel Protection plate. SCOPE OF WORK: Supp...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool 8 No. of lounger cushion damagedwe highly recommend replacing the existing cushions with weather resistant sunbeds to ensure durability and maintain hygiene standards.Specification: (Wheater proof Material) Length: 181 CM Width: 54 CM Thickness : 4.5 CM
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
swimming pool deck area floor tiles are damaged 567 SQ. MTR.• Remove all existing damaged and uneven tiles completely from the pool deck area. • Clean and level the existing surface properly to ensure a smooth and stable base for tile installation. • Apply a suitable waterproofing layer over the entire area, en...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the PPM we found, the Pre filters and Bag Filters of all FAHU damaged condition.We have 08 nos of FAHUFAHU – 1 Model: 03MKP12CD2HGR+CDT+REC S.NoDescriptionSizeQty Unit1Pre Filter (Supply)590 x 590 x 45 mm  6Nos2Bag Filter (6 Pocket, 460mm depth)590 x 590 x 20 mm  6Nos3Pre Filter (Return)495 x 495 x 50 mm...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the initial inspection, our team confirmed that the power tripping was caused by water entering the electrical wiring.SOLUTION: Full waterproofing of all affected washrooms.  Re-grouting of tiles where necessary.  Application of high-grade silicone sealant around the bathtub and other identified gaps.Please...
Break Down Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site visit and check the requirement of Atrium Entrance Floor Granite replacement works . Herewith attached scope of works for your kind review and proposal.Kindly also Include the warranty details.For site visit & more clarificat...
Break Down Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,We are pleased to invite to please share the proposal for Supply & Installation of Cabin Protection pad- 2 Nos.@GANESH | ISHA TECH Could you please share the size of Cabin for the proposal.For site visit and more Clarification , Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 5563Thank ...
Break Down Mixed Use
DIFC, Dubai, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders, I hope this email finds you well.We are pleased to invite you to visit the site and share the proposal for the Supply & Installation of New Booster pump and Transfer pump. Herewith given below the scope of works including Brand and capacity.Residence Tower – RooftopSupply of new booster pump (1 No.)Bran...
Break Down Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
To repair the faulty transfer pump, restore reliable operation, eliminate abnormal noise, and ensure proper water transfer by replacing defective components and performing full mechanical servicing.Inspection & Diagnosis;Isolate pump electrically and hydraulically.Conduct detailed inspection of pump, motor, bearings, coup...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
           Scope of work -  Application of epoxy floor coating at ground Floor car parking and drive way area             ( Quantity 2200 Sq Mtr approx.)1) Application of epoxy floor coating works in ground floor car parking area and driveway floor with pa...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to visit the site and check the requirement of GRP Lining for Swimming Pool area. Herewith attached image for your kind reference.Could you please share the proposal.For site visit & more clarifications, Please coordinate with Mr. Abuthakir (FM Eng...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water was leaking from the shattaf (handheld bidet). It was also observed that proper waterproofing was not in place, contributing to the extent of the leakage.The shattaf must be replaced immediately to prevent further leakage.  The affected area requires proper waterproofing with a minimum 10-year warranty to en...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Possible water entry through the façade glass system was investigated.  Further inspection confirmed water leakage through damaged silicone sealant at the external façade glass joints. The deterioration of the silicone sealant is likely due to ageing and prolonged exposure to sunlight and weather conditions. Huge leaks...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
ceiling damaged due to water seepage.Replace the damaged bathtub, repair or replace the water lines, and apply new silicone sealant properly in Unit 410.  Waterproof the bathtub area and the entire washroom, ensuring a minimum 10-year waterproofing warranty and repair all damaged assets an urgent basis, including c...
Compliance Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – CCTV System Upgrade with ANPR IntegrationProject Location: Al Furjan , Dubai, United Arab EmiratesDetailed Scope of Work;Conduct detailed site assessment of existing CCTV and access control infrastructure.The vendor shall be fully responsible for preparing and submitting all technical documents,...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Entrance area Marble damagedThe reasons for the damages will be the damaged surface sealant of marble by weather exposure and foot traffic.Need to remove existing travertine and dark marble about 50 sq.m at building entrance  Replace the damaged marble about 50 sq.m same design
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
FAHU 2 Cooling coil leak found the heavy water leak at FAHU 2FAHU Make: MEKAR, Model: 03MKP12CD2HGR+CDT+RECNeed to repair the Copper coil immediately since FAHU supply air is essential to prevent the humidity at common area.Note: Kindly do the site visit before submitting the quotation.