Search Jobs

Contract Mixed Use
Escan Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
3rd Party Fire & Life Safety Certification   Floors: 4B + G + 32 + Roof   ** For Site Inspection & visit, please contact Mr. Mohamed Allaf (050 716 2608) ** Duration: Provide a table with each year charges, The charges to be mentioned separately (Year 2023,2024 & 2025)   Site Location :h...
Contract Mixed Use
Dec Towers Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
reeting from SAGA International,We are requesting AMC proposal for Lift third party as per the attached SOW :  Scope of service Total 1 year (two inspections)   12 ElevatorsContract value for Year 2023 : .............Vat 5% For Year 2023             :..............Grand total ...
Contract Mixed Use
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Detailed scope of work is attachedprice breakdown for each year must be mentioned1st year 1/1/2023 to 31/12/20232nd year 1/1/2024 to 31/12/2024
Contract Mixed Use
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Detailed scope of work is attachedprice breakdown for each year must be mentioned1st year 1/1/2023 to 31/12/20232nd year 1/1/2024 to 31/12/2024
Contract Residential
Cappadocia Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: SAGA International
3rd Party Fire & Life Safety CertificationFloors: 1B + G + 3 + Roof** Duration: Provide a table with each year charges, The charges to be mentioned separately (Year 2023 & 2024)Building name    : Cappadocia  Building Site Location    : Jumeirah Village circle  Contact Personnel:...
Contract Residential
Cappadocia Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: SAGA International
Elevator 3rd Party CertificationElevator details:Lift no L01 , L02  Brand Schindler.Capacity : 1000KG,L1 No of person : 13 L2 No of person :8 ** Note: All Service providers are requested to send us Signed and Stamped attached Scope of work along with proposal. ** Duration: Provide a table with each y...
Contract Mixed Use
Park One Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: SAGA International
SCOPE OF WORKElevator 3rd Party CertificationElevator details:*Lift no L01 , L02    Brand FUJI* Pressure vassal - 01 No.  Brand :Global Water Solution   Model # GCB 300LV,** Note: All Service providers are requested to send us Signed and Stamped attached Scope of work along with proposal. **...
Contract Mixed Use
Zen Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
Annual Contract for Third Party Lift Inspection Service starting from 1st of January 2023 till 31st of December 2023 as per the below scope of work/details   1.    2 Lifts 2.    Twice per year   The asset will be shared. All details are to be prepared ...
Contract Residential
Marina Residence, Dubai Marina, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
Annual Contract for Third Party Lift Inspection Service starting from 1st of January 2023 till 31st of December 2023 as per the below scope of work/details   1.    6 Lifts 2.    Twice per year   The asset will be shared. All details are to be prep...
Contract Mixed Use
Marinascape Dubai Marina, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
Annual Contract for THIRD PARTY INSPECTION SERVICES starting from 1st of January 2023 till 31st of December 2023 as per the below scope of work/details.1. Objective of the Request for ProposalAMC proposal for THIRD PARTY INSPECTION SERVICES2. Jointly Owned PropertyTRIDENT MARINASCAPE Jo...
Contract Mixed Use
Global Green View 1 International City, Dubai, United Arab Emirates
Posted By: SAGA International
Annual Contract for Fire System third party inspection and certification Services at Global Green View Jointly Owned Property, CBD 6, International City, Dubai, starting from 1st of January 2023 till 31st of December 2023 as per attached scope of work. Asset list to be p...
Contract Commercial
Mazaya Business Avenue BB2 Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Annual Contract for Elevator third party inspection & certification at Mazaya Business Avenue BB2 Jointly Owned Property, JLT, Dubai, starting from 1st of January 2023 till 31st of December 2023 as per attached scope of work. Service frequency: Every 6 months   ...
Contract Commercial
Mazaya Business Avenue BB1 Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Annual Contract for Elevator third party inspection & certification at Mazaya Business Avenue BB1 Jointly Owned Property, JLT, Dubai, starting from 1st of January 2023 till 31st of December 2023 as per attached scope of work. Service frequency: Every 6 months   ...
Contract Commercial
Mazaya Business Avenue AA1 Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Annual Contract for Elevator third party inspection & certification at Mazaya Business Avenue AA1 Jointly Owned Property, JLT, Dubai, starting from 1st of January 2023 till 31st of December 2023 as per attached scope of work.Service frequency: Every 6 months Sl Projec...
Contract Mixed Use
Saba Tower 2 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
This is for one year AMC covering from 01 January 2023 to 31 December 2023.Please find attached Scope of work of the same. DETAILS OF EQUIPMENT: QUANTITY  FREQUENCYELEVATOR Certificate41BMU Certificate21PRESSURE VESSEL31EARTHLING PIT141MDB51SMDB521MMC71CONTROL PANEL271DB PANEL411CAPACITOR BANK51
Services Residential
Jumeirah Park, District 7, Street G1 - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International
ROYAL PARK:FIRE AND LIFE SAFETY 3RD PARTY CERTIFICATION.
Contract Mixed Use
Bright Corner Nad Al Sheeba, Dubai, United Arab Emirates
Posted By: SAGA International
AMC Service: Third Party Inspection Services (Elevator System)Scope of Work: Refer to the attachment as schedule B of the contract agreement.Frequency of Service: Half - Yearly and as applicable in scope of work schedule B.Contract Period: 01st January 2023 – 31st December 2023For site visit and ...
Contract Mixed Use
Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates
Posted By: SAGA International
AMC Service: Third Party Inspection Services of Elevator SystemScope of Work: Refer to the attachment as schedule B of the contract agreement.Frequency of Service: 2 times a year.Contract Period: 01st January 2023 – 31st December 2023For site visit and inspection, you can contact us, Site Enginee...
Contract Mixed Use
Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates
Posted By: SAGA International
Dear Sir/Madam, Greetings!With reference to the above mentioned subject, we would like to invite your good company to send us your proposal for the FA-FF 3rd Party Certification in Prime Tower, located in Business Bay.For the Contract Period of  January 01, 2023 to December 31, 2023. Ki...
Contract Mixed Use
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International
AMC Service: BMU-Cradle Third Party Inspection Scope of Work: Refer to the attachment as schedule B of the contract agreement.Frequency of Service: 2 times a yearContract Period: 01st January 2023 – 31st December 2023For site visit and inspection, you can contact us, Site Engineer/FM Enginee...
Contract Mixed Use
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International
AMC Service: Third Party Inspection Service (Elevator System)Scope of Work: Refer to the attachment as schedule B of the contract agreement.Frequency of Service: 2 times a yearContract Period: 01st January 2023 – 31st December 2023For site visit and inspection, you can contact us, Site Engineer/F...