Search Jobs
AMC For Third Party Inspection and Certification, 2027-2029 (JB6873-26-00105)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Third Party Inspection and
Certification,
2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
and Frequency:
·
Thermography:
Annual
· ...
AMC For Sewage Tank Cleaning, 2027-2029 (JB6873-26-00104)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Sewage Tank Cleaning,
2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Sewage Tank (10,000 USG)
PPM
Frequency: 3x a year
Contract
Period: 1 January 2027 – 31 December 2029
Submission Requirements
Includ...
AMC For Security Services, 2027-2029 (JB6873-26-00103)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Security
Services, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Provision of full and professional
Security services (Scope of services to be outlined in the AMC along with the
KPIs)
Manpower Requirement: 3 Daytim...
AMC For Plant Maintenance, 2027-2029 (JB6873-26-00102)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Plant Maintenance, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Indoor Potted Plant Maintenance (3 plants)
PPM
Frequency: Weekly
Contract
Period: 1 January 2027 – 31 December 2029
Submission Requirements
I...
AMC For Perfume Diffuser, 2027-2029 (JB6873-26-00100)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC
For Perfume Diffuser, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope of Work: Perfume Diffuser in the Reception area, Lift landing lobby
and aerosols (6 nos.)
PPM
Frequency: Monthly
Contract
Period: 1 January 2027 – 31 December ...
AMC For MEP Services, 2027-2029 (JB6873-26-00099)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For MEP Services,
2027-2029
Saba 1 Tower: 36 floors comprising 177 offices and 10 retail shops
Location: Cluster E, JLT
Scope: Provision of full and professional MEP maintenance and
management services (scope of services to be defined in the AMC, including
KPIs)
Manpower Requirements: 1 Supervis...
AMC For Housekeeping Services in the Common Areas, 2027-2029 (JB6873-26-00098)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Housekeeping Services in the Common
Areas, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Provision
of full professional cleaning services for building common areas (scope to be
detailed in AMC with KPIs)
Manpower
Req...
AMC For Heat Exchanger Maintenance, 2027-2029 (JB6873-26-00097)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Heat Exchanger Maintenance, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Provision of full and professional Heat
Exchanger Maintenance Services
PPM
Frequency: Semi-Annual
Contract
Period: 1 January 2027 – 31 Decemb...
AMC For Gym Maintenance, 2027-2029 (JB6873-26-00096)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Gym Maintenance,
2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope:
Provision of full and professional gym
maintenance (non-comprehensive). Scope of services to be detailed in the AMC
along with KPIs.
PPM
Service: Once every 2 mo...
AMC For Generator Maintenance, 2027-2029 (JB6873-26-00095)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Generator Maintenance,
2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope:
Provision of full and professional
generator maintenance (non-comprehensive) in accordance with NFPA code and
applicable local regulations.
PPM
Service: Mo...
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Fire Alarm, Fire Fighting and
Central Battery System, 2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope & Frequency
Provision of non-comprehensive maintenance of Fire
Alarm, Fire Fighting, and Central Battery System (Q...
AMC For Building Window & Façade Glass Cleaning, 2027-2029 (JB6873-26-00093)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Building Window
& Façade Glass Cleaning, 2027-2029
Saba 1 Tower: Commercial Building – 36
floors, 177 offices and 10 retail shops
Location: Cluster E, JLT
Scope:
Provision of full and professional window and façade cleaning services using
rope access
PPM Service: Quarterly
Contract
Period: 1 January 20...
AMC FOR ELEVATORS MAINTENANCE, 2027-2029 (JB6873-26-00092)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC FOR ELEVATORS MAINTENANCE,
2027-2029
Saba 1 Tower: Commercial Building – 36 floors comprising 177 offices and
10 retail shops
Location: Cluster E, Jumeirah Lakes Towers (JLT)
Scope:
·
Provision of full and professional
elevator maintenance (non-comprehensive)
...
AMC FOR DOOR MAINTENANCE, 2027 - 2029 (JB6873-26-00091)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC
FOR DOOR MAINTENANCE, 2027 - 2029
Saba 1 Tower: Commercial Building – 36 floors, 177 offices, 10 retail
shops
Location: Cluster E, JLT
Scope/ Door Locations:
·
Basement Levels (B1, B2, B3)
·
Ground Floor Main Entr...
AMC For Chilled Water Supply and Treatment, 2027-2029 (JB6873-26-00090)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC
For Chilled Water Supply and Treatment
Saba 1 Tower: Commercial building consisting of 36 floors with 177
offices and 10 retail shops
Location: Cluster E, JLT
Scope:
·
Chilled water treatment every 3 months
·
Chem...
AMC For BMU Maintenance, 2027-2029 (JB6873-26-00089)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC
For BMU Maintenance
Saba Tower 1: Commercial Building – 36 floors consisting of 177 offices
and 10 retail shops
Location: Cluster E, JLT
Scope: Provision of full and professional BMU/Cradle maintenance
services.
PPM Service: Quarterly
Contract
Period: 1 January 2027 – 31 December 2029
Submission Requ...
AMC for BMS Maintenance, 2027-2029 (JB6873-26-00088)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Provision of comprehensive BMS
Maintenance Services for the Niagara System (including KPIs and full scope
under AMC)
PPM
Frequency: Quarterly
Contract
Period: 1 January 2027 – 31 December 2029
Su...
AMC For Access Control & Gate Barrier System, 2027-2029 (JB6873-26-00087)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
Access Control &
Gate Barrier System Maintenance – AMC
Saba 1 Tower:
Commercial building – 36 floors, 177 offices, and 10 retail shops
Location: Cluster E, JLT
Scope of Work
Full professional maintenance
of access control and gate barrier systems (non-comprehensive)
Unlimited callouts
PPM Frequency:...
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection at La Vista Residence-3 , the installed grass within the landscape area has completely dried and died within four months of installation. Preliminary observations indicate that the existing soil conditions may be unsuitable for sustaining healthy grass growth. This issue has negatively impacted...
Kids Playroom Fit-Out, AHU Room modification & associated MEP Works (JB2332-26-00223)
Enhancement
Residential
Grandeur Residences Palm Jumeriah, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
REQUEST FOR PROPOSALKids Playroom Fit-Out, AHU Room modification & associated MEP Works-Grandeur ResidenceProject TitleModification and Fit-Out works to create a Kids Playroom in the existing AHU Room, separation of the AHU services, construction, Fire & Safety, Electrical, HVAC, CCTV, Data and Authority Approvals -at...
Mechanical Electrical Plumbing (MEP) Break Down (JB1099-26-02208)
Break Down
Mixed Use
Business Bay, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,
Greetings
from Strata Global!
We
kindly invite you to do a site visit and send us your proposal for the Supply
and Replacement of 2.5-inch float valve in The Bay located in
Business Bay
Item Description
Qty
1
• &...
Proposal for Installation of Bird net at parking - LV2 (JB004-26-02057)
Break Down
Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At La Vista Residence-2, birds are frequently perching on exposed plumbing lines, firefighting pipelines, and cable trays within the parking area, resulting in bird droppings on parked vehicles and surrounding surfaces. Existing plastic bird spikes have deteriorated due to poor material quality and harsh outdoor conditions, ...
Proposal for Internal external repainting work-LV2 (JB004-26-02056)
Break Down
Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At La Vista Residence-2, water seepage, mold growth, wall cracks, and paint deterioration have been identified within the atrium and staircase areas and external boundary walls of the building. The defects are affecting the visual appearance of the common areas and creating potential health, hygiene, and maintenance concerns...
proposal for the Installation of bicycle stand - LV3 (JB004-26-02053)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At La Vista Residence-2, the existing bicycle parking facilities are insufficient to meet resident demand, resulting in insufficient parking capacity, unorganized bicycle placement, and inconvenience to users. Additionally, the current parking area lacks protective shading, exposing bicycles to direct sunlight and increasing ...
Proposal for repainting of parking slots - LV3 (JB004-26-02052)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection at La Vista Residence-3 , it was observed that the parking slot numbers, boundary lines, and directional arrow markings had significantly faded due to continuous vehicle movement and environmental exposure. The reduced visibility is causing difficulty in identifying designated parking spaces an...
CCTV, PA System, Access Control & SMATV Break Down (JB1099-26-02197)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Please provide the proposal for Replacement of CCTV System for 32" Monitor car parking Thank you.
Access Control System Break Down (JB1099-26-02193)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Could you please provide the propsoal for Installation of Biometric device access reader as per attached sow.Thank you.
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of Broken Façade Glass Panels – 14th Floor & 3rd Floor Balcony
Conduct façade glass rectification works for the damaged glass panels identified during façade inspection.
Safe removal and disposal of 2 Nos broken façade glass panels located at:
14th Floor – Medium Sized Glass
3rd Floor Bal...
Gym, Sauna & Steam Maintenance (Male & Female) - The Spirit (JB004-26-02021)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification Works for Gym, Steam & Sauna PPM Findings – 19th Floor
Scope of Work:
Carry out rectification works for identified PPM findings in the Gym, Steam, and Sauna rooms located on the 19th Floor.
Gym Equipment Works:
Replace damaged roller guard, roller bearings, drive belt, battery, cable, ...
GYM & stam and sauna room findings rectification - The Diamond (JB004-26-02018)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. PEDAL STRAPS
Description: Replacement of Pedal Strap for LF Up Right Bike (Hole Type) | S/N : CLU109838
Qty: 1 Pair
2. CABLE ASSY FOR GYM EQUIPMENT
Description: Replacement of Cable for LF Multi Station (Lat Section-4mm)
Qty: 3 Meter
3. ALTERNATION WORK WITH A...
Proposal for repairing of swimming pool pumps and tiles (JB004-26-02002)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Following the completion and successful commissioning of the approved swimming pool filtration pump modification works, several operational defects and maintenance issues were identified during system inspection and testing. The observations include leakage, abnormal noise, defective bearings, mechanical seal failures, and im...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Epoxy Floor Rectification Works for Walkway Area Leading to Gym & Swimming Pool EntranceScope of Work:Inspect the damaged epoxy flooring in the walkway area leading to the gym and kids’ swimming pool entrance.Remove existing cracked and deteriorated epoxy coating by grinding/scraping the surface.Prepare and clean the floo...
Crack Filling & Epoxy Floor Repainting Works for Parking Areas (JB004-26-01998)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Crack Filling & Epoxy Floor Repainting Works for Parking AreasScope of Work:Inspect parking area floors at Basement, Ground, and Podium levels for cracks, faded epoxy paint, and surface deterioration.Carry out surface preparation, including cleaning, grinding, and removal of loose/damaged epoxy coating.Fill cracks and rep...
Replacement of Cracked & Faded Swimming Pool Step Tiles (JB004-26-01995)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Cracked & Faded Swimming Pool Step TilesScope of Work:Inspect the swimming pool step tile area and identify cracked and faded tiles.Remove and dispose of damaged existing tiles carefully.Supply and install new tiles matching the existing design and color.Carry out tile replacement works for approximately 30...
Supply & Replacement of Swimming Pool Sunbeds with Umbrellas (JB004-26-01994)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of Swimming Pool Sunbeds with UmbrellasScope of Work:Remove and dispose of existing damaged and worn-out swimming pool sunbeds.Supply and install new sunbeds with umbrellas for the swimming pool area.Sunbed Specifications:Height: 37 cmWidth: 70 cmLength: 190 cmMaterial: Powder-coated aluminum frameSea...
Gas detection system and panel has defective need to repalce (JB004-26-01993)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Inspect the existing gas detection system and identify defective components.Isolate and dismantle faulty gas leakage detection sensors and control panel.Supply and install new gas detection sensors compatible with the existing system.Supply and replace defective gas detection control panel.Check all electrical wiring, connect...
Supply & Installation of Aluminum Ceiling Panels (JB004-26-01991)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The work shall be carried out in accordance with approved standards, site conditions.1. Site Inspection and Preperation Conduct complete site inspection and verification of dimensions before commencement of work.Protect existing gym equipment, walls, flooring, and adjacent finishes during execution.Arrange all necessary tools...
Supply & Replacement of Skirting (JB004-26-01990)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Site Inspection and Preperation Conduct complete site inspection and verification of dimensions before commencement of work.Protect existing gym equipment, walls, flooring, and adjacent finishes during execution.Arrange all necessary tools, manpower, transportation, and safety equipment.Barricade working area and ensure sa...
Proposal for BMS Snag Rectification Works (JB004-26-01985)
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
49Fire Pump - Electrical PumpTerminal RustedNeed to be replaced50Water Transfer PumpsTermination was removedNeed to terminate the cable
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rooftop Cladding & Façade Waterproofing Rectification Works – Multiple LocationsScope of Work:Conduct inspection and rectification of damaged rooftop cladding and façade panels at multiple locations.Remove and replace damaged/disoriented ACP cladding panels along the rooftop parapet edge.Reinforce rooftop claddings with p...
Main common area drains lines are blocked (JB004-26-01941)
Break Down
Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The main common area drain line is currently blocked due to solid waste choking the pipeline connected to the balconiesfollowing rectification works need to be carried out: • Locate and assess the blockage within the buried wall drain line through inspection. • Take necessary precautions to control leakage and prevent further...
FAHU CCU units Compressors Defective (JB004-26-01939)
Break Down
Mixed Use
Spica Residence, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
FAHU CCU units Compressors Defective Statement of ProblemFAHU-01 CCU units (B & C) 2 numbers of compressor defective. • CCU-B unit one compressors defective. • CCU-C unit two compressors defective. FAHU-02 units panel electrical circuit defective and CCU-B compressor defective. • FAHU-02 electrical circuit defective • CCU...
Supply and Replacement of Transfer Pump Header (JB004-26-01933)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and Replacement of Transfer Pump HeaderSupply and Installation of New HDPE header pipe and all pipe fittings for Transfer Pump 1,2 and 3 along with DN150 Bellows Scope of Work• Dismantling of existing damaged transfer pump header fittings • Supply and installation of new HDPE header fittings and all pipe accessories fo...
Break Down
Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Equipment for Fire Alarm, CBS, Fire Extinguisher & Fire Pump SystemReplacement of Emergency Light – B Block Brand: GUARDMAX Quantity: 25 NosReplacement of Emergency Light – A Block Brand: GUARDMAX Quantity: 42 NosReplacement of Tube 8W Brand: TOSHIBA Quantity: 70 NosReplacement of Smoke Detector Brand: FIRE...
proposal for Swimming pool Refurbishment work (JB004-26-01918)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SWIMMING POOL REFURBISHMENT WORKS- CIVILFull demolishing/dismantling-removal of existing pool tiles tiles – adhessives any related debris from pool floor and wall areas.Removal of necessary existing tile adhesive, loose mortar – loosen plastering or cement screeds, from dismantled areas. Full surface grinding - preparation t...
Break Down
Residential
International City 2 Warsan 4 , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BackgroundDuring a site inspection of the Ground Floor and Basement parking areas, multiple vehicle stoppers were found to be heavily damaged and no longer effective in controlling vehicle movement. The deterioration is due to a combination of age and repeated impact from vehicle tyres over time. Attempts to carry out tempora...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BackgroundDuring a site inspection of the rooftop lift room, water seepage was observed on the interior surface of the gypsum wall. The source of the leakage was traced to the exterior glass cladding area, where the silicone sealant has deteriorated and allowed rainwater to penetrate through the joint. The ongoing seepage is ...
Aircraft warning lights are not functioning - Indigo Tower (JB004-26-01907)
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BackgroundThe aircraft warning light on the building is currently non-functional. In addition, the facade lighting at the front and rear of the building has also been found to be not working. Both systems are critical to the building's compliance with DMCC snag requirements and must be restored to full operation without d...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BackgroundDuring a scheduled Planned Preventive Maintenance of the Chilled Water primary pumps, the Non-Return Valves installed on the pumps were found to be malfunctioning due to age-related deterioration. Backflow was observed, with water flowing in the reverse direction upon pump shutdown and during system pressure fluctua...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BACKGROUND: During routine inspection, found basement 1,2&3 multiple locations on drive way, floor & walls is damage, and paint is pilling – out. STATEMENT OF PROBLEM: Floor & Driveway Damage • Multiple locations show surface wear, cracking, and minor spalling of concrete. • Evidence of abrasion and tire-induced w...