Search Jobs
Roof Façade Copping Panel in broken condition (JB004-26-00794)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During routine inspection we found that the Roof Facade Coping panels (02 nos) near swimming
pool are in broken condition.The damage is clearly visible from swimming pool area. The panel welding broken and in hazardous situation.This damage by ageing and rusting of panel. These damaged panels need to be reinstated / replac...
Replace the Suspension Traction Media (JB004-26-00710)
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replace the Suspension Traction Media for Lift 3 Supply and installation of suspension traction media.Note: Kindly do the site visit before submitting the quotation, we will not accept any variations after work order.
Break Down
Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Carry out waterproofing repair and apply a new protective coating inside the tankScope of Work:
Measurements: Floor area-70SQM, Ceiling area-70SQM, Wall area-205SQM, Tank capacity- 60000 Imperial gallons
Permanent rectification of recurring water leakage from the water tank side ground floor wall, protecting
stru...
Supply and Replacement of Sunbeds - divine residence (JB004-26-00696)
Break Down
Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Removal and Disposal
Remove and dispose of the existing faded sunbeds in compliance with Dubai Municipality (DM) guidelines.
Ensure all waste materials are properly handled and disposed of at approved facilities.
Supply, Delivery, and Installation
Supply, deliver, and install new Alfa Sun Loungers with Armrest (Blue...
Ground floor RCC water tank water proofing damaged (JB004-26-00692)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Carry out waterproofing repair and apply a new protective coating inside the tankScope of Work: Measurements: Floor area-70SQM, Ceiling area-70SQM, Wall area-205SQM, Tank capacity- 60000 US gallons
Permanent rectification of recurring water leakage from the water tank side ground floor wall, protecting
...
Civil & Architectural Break Down (JB1099-26-00924)
Break Down
Residential
Downtown, Dubai, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,I hope this email finds you well.We are pleased to invite you to participate in the tender process and attend a site visit for the proposed Storage Room Construction works for Mezzanine & Podium Floor. Additionally also share your company prequalification for our reference.Please find attached ...
Leak Repair of VRF System (JB004-26-00620)
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
LEAK REPAIR OF VRF
SYSTEM• L.O.T.O (Log Out Tag Out) the system • Check the parameters using LGMV • Perform leak test. • Identify & rectify the leak in the system. • Perform the required pressure test to ensure there is no further leak. • Flush the system to remove contaminants. • Keep...
CCTV, PA System, Access Control & SMATV Break Down (JB1099-26-00888)
Break Down
Mixed Use
Dubai Land, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Service Provider
Greetings from Strata Global!
We would like to invite you to do the site visit and
submit the us your proposal for the CCTV Upgradation works in KOA CanvasProject: KOA Canvas, Dubailand
Scope of work: CCTV Upgradation as per SIRA Regulations
Removal
of existing analogue syst...
SUPPLY & INSTALLATION OF ARD UNIT (JB004-26-00592)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SUPPLY & INSTALLATION OF ARD UNIT. Elevator # 4 (Qty: 01)Emergency Landing Device (ELD) is not working. Corrective action shall be taken.
Shaft lighting is not working. Corrective action should be taken.
Observed abnormal noise in the compensation chain guide roller. Corrective action should be taken.
In the machi...
Supply and delivery of Printer (JB004-26-00565)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and delivery of Printer
Replcace of Door Floor Machine (JB004-26-00544)
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Installation of Glass door Floor Machine for swimming pool door.
Supply of sofa (JB004-26-00514)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of the Work:Supply of sofa at site, including delivery and installation.Material Details:Flared Armrest Sofa – 3 Seater Size: 215 cm (W) × 88 cm (D) × 80 cm (H)Color: TBD
Supply & Delivery of Test Kit (JB004-26-00505)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Delivery of Test kit
External Signage board required painting and lights (JB004-26-00504)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The External Signage board 2 Nos required painting and lights of the signage board BOH need to be fixed.Scope of WorkSupply and installation of front-light 3D aluminum letters, including rainprooftransformer.* LED used: SamsungWall preparation and painting work* Remove old paint* Sanding and primer application* New paint usin...
Fire Rectification work DCD (JB004-26-00497)
Break Down
Residential
Dragon Views, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Scope of WorkThe following works are required to be carried out as part of the rectification and systemimprovement activities:1. Replacement of Heat Detectors with Base (Model: FXN-725, Eaton – JSB)o Quantity: 4 Numbers2. Replacement of Smoke Detectors with Baseo Model: FXN-723o Model: FXN-720 (Eaton – JSB)3. Programming o...
Supply and Installation Parking Locks (JB004-26-00470)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work: Supply and Installation of Parking lock (Manual) With Lock. 60MM Dia x 750MM Height Color: Yellow Material: Alloy steel
Gym, Sauna Maintenance for Male & Female (JB004-26-00362)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of WorK:Supply & Installation of Followings: Gym, Sauna & Steam Maintenance - Male Gym1 CABLE ASSY FOR GYM EQUIPMENTReplacement of Cable Assembly for Life Fitness Bicep Curl -4mm 6 Meter 2LATHE WORKLathe Work for Life Fitness Bicep Curl - Bicep Section (AdditionalPulley) 1 Nos 3&nbs...
Replacement of Filter Pump 2 & 3 (JB004-26-00320)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply & Installation of Followings:Main Pool Filter Pump 1Pool UnionFilter Pump 2Filter Pump 3Filter Pump 2 & 3 Installation and Allied MEP WorksMain Pool UW LED LightKids Pool UW LED LightMain Pool Balance Tank Float Valve
Facada Glass Replacement (JB004-26-00234)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: Replacing the façade glass to restore visibility and maintain the structural integrity and quality of the façade system.Approximately glass size – 110 cm * 90 cm
BMU Rectification work (JB004-26-00232)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Power socket damaged due to wear and tear. Power socket need to be replaced.Up Limit switch damaged due to electriacal failure and wear and tear. Limit switch need to be replaced.Pressure Roller damaged due to usage, wear and tear. Need to be replacedRope Guide damaged due to usage, wear and tear. Need to be rep...
RECTIFICATION OF HOT WATER LEAKAGE (JB004-26-00227)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Hot Water Leak Rectification
Replacement of faulty gate valve and associated pipes in front of Apartment 1005.
Replacement of faulty PPR pipe, gate valve, and fittings, including ceiling repair and painting, in front of Apartment 609.
Replacement of PPR pipe and fittings in front of Apartment 209.
Apar...
rectification works for the calorifier (JB004-26-00226)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Supply & installation of:
Heavy Duty water immersion heater as per enquiry.
Rating – 203V – 3000 watts.
Sheath –
stainless steel seamless 316L grade tube fitting with 1/14” BSP Threaded
adapter.
Thermostat sump type will be provided along with terminal protection
cover.
Selector switch for circular pu...
Photocell replacement only. (JB004-26-00223)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply & installation of:Supply of Photocell (1Pair)Brand: CAMEInstallation & testing
replacement of elevator sheave, rope and ELD (JB004-26-00192)
Break Down
Mixed Use
Riviera Lakeview, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply and Installation of Traction Sheave (L2, L3)Supply and Installation of Main Ropes (L2, L3)Emergency Landing Device Upgrade (L1, L2, L3)
REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT (JB004-26-00179)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT
Lift Rectification work 2025 L1,L2,L3 (JB004-26-00056)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scoppe of Work:Supply & Installatsion: 1. Main steel Rope 12mm2. New ARD with Batteries 3. ARD batteries 18AH Testing and Startup
Fire Protection Systems Rectification (JB004-25-04237)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:1. Fire Protection System – FM200 (Shield System)
The contractor shall carry out the following works:
Supply and install safety covers for all FM200 manual release switches.
Refill HFC227EA gas in the FM200 system cylinders (45 kg capacity).
Replace faulty 3” impulse valve discs.
Perform complete testing...
Fire Fighting Rectification work (DCD Snags) (JB004-25-03973)
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SCOPE OF WORK: 1 Rectification of Electric Motor including•Supply & Replacement of Motor Bearing-2 nos•Re-varnishing of Motor-1 no•Servicing of Motor Shaft-1 noRectification of Electric Pump including•Supply & Replacement of Pump Bearing-2nos•Supply & Replacement of Gland Packing-1 no•Removing of P...
RFP FOR LIFTS REFURBISHMENT (JB6873-25-00137)
Enhancement
Mixed Use
Cluster Q , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
Elevators: 4 Units
Dismantling & Removal of ElevatorsRemove existing
wall panels, ceiling, flooring, handrails, and other outdated fixtures.Carefully
dismantle light fittings, fan covers, and mirrors.Remove skirting,
control panel fascia, and false ceiling.
Cabin Interior Works
Wall Panels:
Supply and install new...