Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Marble at Ground Floor Main Entrance Arch and Near Chispa Pillar
Scope of Work
Erect scaffolding to provide safe access for replacement works at the Ground Floor Main Entrance Arch.
Remove the damaged and loose marble from the Main Entrance Arch.
Supply and install 1 No. marble at the Mai...
Civil & Architectural Break Down (JB1099-26-02493)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
We are pleased to invite you to visit the site and assess the requirements for the Wall Painting and Floor Epoxy Painting Works as per the attached scope of work.
Kindly arrange a site visit to inspect the existing conditions, verify the quantities, and review...
Civil & Architectural Break Down (JB1099-26-02477)
Break Down
Mixed Use
Meydan, Dubai, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
Please provide your proposal for the irrigation pump issue and pump room access at the MAG EYE Shared Area based on the agreed scope of work.
Kindly review the scope and submit your technical and commercial proposal at your earliest convenience.
&nb...
Civil & Architectural Break Down (JB1099-26-02448)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
Kindly review the scope of works given below with regards to Coumn gypsum board texture painting works at Atrium Area. Kindly provide the proposal.
For site visit & more clarifications, Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 5563
&nbs...
Civil & Architectural Break Down (JB1099-26-02445)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
Kindly check the requirement of Parking slot new number works at Ground Floor. Please provide the proposal at the earliest .
For site visit & more clarifications, Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 5563
Thank you.
Civil & Architectural Break Down (JB1099-26-02444)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
We are pleased to invite you to visit the site and check the requirement of Supply & Replacement of Floor Tiles at 9th Floor .
For site visit & more clarifications, Please coordinate with Mr Ganesh (FM Engineer) : +971 56 415 556...
Civil & Architectural Break Down (JB1099-26-02443)
Break Down
Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,
I hope this email finds you well.
Kindly provide the proposal for the Male & Female Prayer room outside area wallpaper Installation works. Herewith given below scope of works for your reference.
For site visit & more clarifications, Please coordinate with...
Building entrance floor mat damaged. (JB004-26-02322)
Break Down
Residential
La Riviera Azure, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Carefully extract and dismantle the existing damaged aluminum mat sections from the floor recess without damaging the surrounding tiled borders or the underlying sub-floor mat-well.
Thoroughly clean, vacuum, and desale the recessed concrete floor well, eliminating all accumulated debris, moisture, old adhesive residues, and...
Renovation of GF lift lobby - Hilliana tower (JB004-26-02272)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At Hilliana Tower,
A comprehensive renovation of the Ground Floor (GF) lift lobby is proposed to enhance the overall appearance, functionality, and user experience of the building's main access area. The existing finishes and fixtures have become outdated and require upgrading to meet modern aesthetic and oper...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation for Emergency Exit Door near swimming pool - Diamond Tower
Conduct detailed site inspection and feasibility assessment of the rear swimming pool area for the proposed emergency exit door.
Assess and verify the suitability of the proposed location for emer...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
The contractor shall carry out the complete rectification, repair, and replacement of damaged building canopies to restore their structural integrity, weather resistance, and functionality. The scope shall include, but not be limited to, the following:
Conduct a detailed site inspection and assessment of all...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Background
During routine inspection, wall deterioration was identified across two distinct areas of the building requiring immediate remedial intervention.
At the ground floor loading bay, the lower walls were found to be damaged with paint peeling and flaking throughout the affected areas. Assessment confirmed that the da...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During routine inspection of the building corridor areas, it was observed that floor tiles at multiple floors are
damaged, cracked, chipped, and partially loosened. The damage appears to have occurred due to continuous foot
traffic, movement of heavy materials/equipment, and normal wear and tear over time.
Several affected...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BACKGROUND: During routine inspection, found basement 1,2&3 multiple locations on drive way, floor & walls is damage, and paint is pilling – out. STATEMENT OF PROBLEM: Floor & Driveway Damage • Multiple locations show surface wear, cracking, and minor spalling of concrete. • Evidence of abrasion and tire-induced w...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Main entrance Marble along with foggy glass panels needs to be replaced.Ensure that the marble design and color should match with existing marble.Glass should be double glazed and heavy duty to bear load.Permanent disabled ramp to be installed.
Proposal for Basement Floor and Wall Surface Restoration Works (JB004-26-01662)
Break Down
Mixed Use
Global Green View2, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary
During inspection of Basement 1 and Basement 2, widespread surface deterioration was observed across the parking areas, including cracks, peeling of epoxy and paint coatings, and uneven floor surfaces. Wall surfaces similarly showed signs of paint peeling, cracking, and general wear. The deterioration is attributed to...
Proposal for Ceiling Tile Replacement (JB004-26-01453)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Executive Summary:At Jewellery & Gemplex Buildings 1, 2, and 3, ceiling tiles installed during the original construction in
2004 have significantly deteriorated. A large number of tiles show discoloration, fading, sagging, and
physical damage. In several locations, ceiling failure has occurred due to prolonged exposure ...
Proposal for Replacement of Floor tiles (JB004-26-01452)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Executive Summary:The corridor floor tiles in Jewellery & Gemplex Buildings 1, 2 & 3 were installed during the initial
construction phase in 2004. After nearly two decades of continuous use, a significant number of tiles have
become cracked, chipped, and damaged due to normal wear and tear, heavy foot traffic, and t...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary:Expansion joint beadings in J&G Buildings 1, 2, and 3 are dislocated and detached, particularly near building entrances and high-traffic areas. This poses a critical safety risk of trips, falls, and impact injuries, while also allowing potential water ingress that may cause further deterioration to adjacent finish...
Proposal for Wall Crack and Epoxy Floor Damage Rectification (JB004-26-00954)
Break Down
Mixed Use
Global Green View2, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary
Cracks have been observed on ground floor walls and structural elements in Basement 01 & 02. Additionally, epoxy floor coating damage, including peeling, blistering, and surface chipping, is evident in both ground and basement levels. Some cracks appear structural in nature, particularly at beam-column junctions a...
Proposal for Replacement of Deteriorated Epoxy Flooring (JB004-26-00933)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary
The epoxy flooring installed in J&G Buildings 1, 2, and 3 (excluding recently renovated DMCC areas) has significantly deteriorated due to age and heavy usage since installation in 2004. The flooring exhibits loss of slip resistance, cracking, and delamination, creating safety risks. The surfaces have reached the e...
Wall Paper damaged at corridor (JB004-26-00803)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
On routine inspection, team found that the wall papers are damaged at 36 and 38 Floors corridor
and Lift lobby The wall papers have two type of design and most of the areas are in removed condition from wall These damages due to aging and need to replace. Wall papers need to replace following:-Area 1Corridor Left ...