Search Jobs
Proposal for supply and replacement of Fire alarm equipment (JB004-26-01473)
Break Down
Residential
Plazzo Residence, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A routine inspection of the Fire Alarm and Fire Fighting System at Plazzo Residence identified several faulty devices and components requiring repair or replacement. The deficiencies observed affect both detection and firefighting systems, impacting overall safety and operational reliability.
Key findings include:
Faulty he...
Proposal for the Rectification of CBS Emergency lighting system (JB004-26-01455)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The inspection was conducted to evaluate the operational condition of the Emergency Exit Lighting System connected to the CBS panel. The assessment revealed that the system is partially non-functional due to multiple faults, including defective emergency luminaires, damaged batteries, and circuit-related issues.
Key observati...
Roof Waterproofing Rectification Works (JB004-26-01123)
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Roof Waterproofing Rectification Workscombo-type waterproofing system already done this roof it was damaged and cracking as dismantling or disturbing the
concrete blocksExisting Site Condition The roof area is currently protected by a combo-type waterproofing system. Multiple concrete blocks are installed above
t...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work - Repainting of facade, Column in parking areas and Boundary wall after rectification of cracks 1. Authority Approvals: Preparation of drawings for the authority approval and building permit.2. Facade Cleaning: Power washing of the facade to remove dirt, stain, fungus/mold and any loose paint.3.Crack Fillin...
Break Down
Residential
JVT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:
Inspection and troubleshooting of the existing ATS panel auto changeover system.
Checking of auto/manual selector switch, control wiring, relays, contactors, and generator auto-start circuit.
Repair or replacement of faulty ATS components required for auto-mode operation.
Testing of system through power...
Water Leakage from CHW pipe Insulation (JB004-26-00967)
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water Leakage from chill water pipe Insulation Water seepage damaging followings,
Exit lights,
Fire alarm systems,
Gypsum ceilings,
Possible to damage CCTV camera.Replacing of CHW insulation from: (Total -335 Running meter approx.)
1) Removal of existing Insulation for Chilled water ...
Water Proofing for PIt Lift (JB004-26-00960)
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
water has been come in two passenger lifts pit during the last rain and
need to waterproofing. Chipping the pit floor and wall till 100cm height Supply and installation of injection for the same
height 100cm Application of cementitious water proofing to
leveling the surface Supply and ...
External Signage board required painting and lights (JB004-26-00504)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The External Signage board 2 Nos required painting and lights of the signage board BOH need to be fixed.Scope of WorkSupply and installation of front-light 3D aluminum letters, including rainprooftransformer.* LED used: SamsungWall preparation and painting work* Remove old paint* Sanding and primer application* New paint usin...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
System Isolation and Preparation
Isolate and depressurize the affected section of the pipeline system in accordance with site safety and operational procedures.
Verify zero pressure before commencement of dismantling.
Dismantling and Removal
Remove existing 6-inch and 4-inch copper pipelines from the pump header con...
Showing 501 to 509 of 509 results