Search Jobs
Replace the Suspension Traction Media (JB004-26-00710)
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replace the Suspension Traction Media for Lift 3 Supply and installation of suspension traction media.Note: Kindly do the site visit before submitting the quotation, we will not accept any variations after work order.
Replacement of ARD Batteries (JB004-26-00706)
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Installation of ARD Batteries 12V 12 AH for L1 & L2 (QTY: 08)
Supply & Replacement of Service Lift Wall & Floor protection (JB004-26-00634)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replace the wall protection and floor protection as per the recommendation from Elevator service provider M/S AG Melco
SUPPLY & INSTALLATION OF ARD UNIT (JB004-26-00592)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SUPPLY & INSTALLATION OF ARD UNIT. Elevator # 4 (Qty: 01)Emergency Landing Device (ELD) is not working. Corrective action shall be taken.
Shaft lighting is not working. Corrective action should be taken.
Observed abnormal noise in the compensation chain guide roller. Corrective action should be taken.
In the machi...
Supply and Installation of Elevator Travelling Cables - LART (JB004-26-00568)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
the total number of cables is two (02), and the length of each cable is approx. 180 meters.Removal of existing travelling cables
Supply of new flat-design travelling cables suitable for elevator applications
Installation, termination, testing, and commissioning
Proper labeling and marking for traceability
Dispos...
Break Down
Residential
JVT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Removal of Lift-1 and Lift-3 small scratches- Mirror Finish, Length-2.40CM X Width-85.CM
Replacement of batteries & Ceiling Acrylic (JB004-26-00213)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply & Installation of Below Elevator Spare Parts: 1. ARD Batteries 12v 18AH QTY 262. Change Ceiling Acrylic QTY 4
replacement of elevator sheave, rope and ELD (JB004-26-00192)
Break Down
Mixed Use
Riviera Lakeview, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply and Installation of Traction Sheave (L2, L3)Supply and Installation of Main Ropes (L2, L3)Emergency Landing Device Upgrade (L1, L2, L3)
REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT (JB004-26-00179)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope Description
The contractor shall carry out the complete replacement of the elevator governor units for the identified lifts, including all associated works necessary to ensure safe and compliant operation.
Detailed Scope of Works
Supply of new elevator governor units suitable for the installed elevator system.
Replace...
Lift Rectification work 2025 L1,L2,L3 (JB004-26-00056)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scoppe of Work:Supply & Installatsion: 1. Main steel Rope 12mm2. New ARD with Batteries 3. ARD batteries 18AH Testing and Startup