Search Jobs
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Rectification of Water Seepage in Lift No. 3 Pit – Al Shera Tower
Location: Basement, Lift No. 3 Pit – Al Shera Tower, JLT Cluster E
The contractor/vendor shall carry out the following works:
Inspect the existing Lift No. 3 pit to identify the source of water seepage and affected areas...
AMC of Elevator maintenance 2027 (JB004-26-05429)
AMC
Residential
Binghatti West, DubaiLand Residence Complex, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Asset Details:
Total Lifts- 2 Nos
Passenger Lift – 2Nos
Spare Parts:
Comprehensive
Maintain a reasonable inventory of essential spare parts for maintenance and services falling within the scope of services.
Exclusion – Main traction ropes, OSG ropes, traction sheaves, glass, painting, an...
(12-Months) Lift, Elevator And Escalators Maintenance Contract (JB11484-26-00192)
AMC
Mixed Use
District 15, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
BELLE REVE
Belle Reve is a six-storey residential building under development in JVC District 15, Jumeirah Village Circle, Dubai.
Contract Duration - 01-01-2027 to 31-12-2027 (12-Months)
Note
Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may se...
RFQ for Lift Third Party Certification (JB11484-26-00190)
AMC
Mixed Use
District 15, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
BELLE REVE
Belle Reve is a six-storey residential building under development in JVC District 15, Jumeirah Village Circle, Dubai.
Contract Duration - 01-01-2027 to 31-12-2027 (12-Months)
Note
Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may se...
(9-Months) Lift, Elevator And Escalators Maintenance Contract (JB11484-26-00172)
AMC
Mixed Use
Al Barsha South Fourth , Plot No: 108, Jumeirah Village Circle, Dubai, UAE., Dubai, United Arab Emirates
Posted By: SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
Green Sail Residence
Contract Duration - 01-04-2027 to 31-12-2027 (9-Months)
Note
Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may send a site visit request as response to this RFP or by sending an email to jopm@skyline-livings.com
L...
RFQ for Lift Third Party Certification (JB11484-26-00170)
AMC
Mixed Use
Al Barsha South Fourth , Plot No: 108, Jumeirah Village Circle, Dubai, UAE., Dubai, United Arab Emirates
Posted By: SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
Green Sail Residence
Contract Duration - 01-04-2027 to 31-12-2027 (9-Months)
Note
Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may send a site visit request as response to this RFP or by sending an email to jopm@skyline-livings.com
B...
Break Down
Mixed Use
Kg tower, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Location: Main Lobby, Reception and Seating Lounge Areas – KG Tower
The contractor/vendor shall carry out the following works:
Inspect the existing main lobby lighting arrangements, ceiling coves, wall features, reception seating sofas, electrical connections, and associated fixtures before commence...
Break Down
Mixed Use
Kg tower, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Location: Lift Machine Room and Lift Shaft – KG Tower
The contractor/vendor shall carry out the following works:
Inspect the existing lift machine room and lift shaft cooling system, Fan Coil Unit (FCU), ductwork, electrical connections, and associated components before commencement of work.
Ve...
Rectification of Lift Lobby Lighting Sensors – Al Shera Tower (JB004-26-05114)
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Location: Lift Lobby Areas – 1st to 38th Floor, Al Shera Tower
The contractor/vendor shall carry out the following works:
Inspect the existing lift lobby lighting sensors, electrical connections, mounting arrangements, and associated lighting control systems from the 1st to the 38th floor before com...
AMC
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Elevator Maintenance at Villa Myra
Service Frequency: Monthly - 12 times in a year
Emergency Callouts- Unlimited
Asset Details:
Passenger Lift – 3nos
Brand- Kone
Capacity- 630Kg/8persons
Speed – 1.0m/s
Number of stops – 5 nos (B+G+3+R)
Spare Parts:
Comprehensive
Maintain a ...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location :Basement 1 / Escalator- ESC04
Replace the damaged left-side handrail belt with a new compatible handrail belt.
Total No of Handrail belt- 1 Nos
TYPE: 8040NTAABZ
CONFIGURATION: ENDLESS (NT)
COLOR BLACK
LENGTH: 21.858 MTR / 21858 MM
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Location: Passenger Elevators – Jewellery & Gemplex 1, 2 & 3
The contractor/vendor shall carry out the following works:
Inspect the existing floor finishes and wall cladding inside all six passenger elevator cabins and verify the complete extent of replacement works.
Carefully remove the exis...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Location: IT Plaza – Lift Units L01, L02, L03 & Service Lift
The contractor/vendor shall carry out the following works:
Remove the existing defective and hard-to-operate lift buttons and supply and install new compatible lift buttons.
Replace the affected complete lift button/control panel ...
Break Down
Mixed Use
Apricot Tower Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Carry out a detailed technical assessment of the existing dedicated elevator shaft and verify its suitability for installation of the proposed new elevator.
Carry out the required structural verification of the existing shaft and associated building provisions before commencement of installation works....
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The contractor shall carry out complete rectification and
associated works for the hydraulic elevator located at Atlantic Tower,
Dubai Marina, including but not limited to the following:A. Elevator Shaft Enclosure RectificationRectification of elevator
shaft glass enclosureIdentification and
sealing of water ingress points wi...