Search Jobs

Break Down Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply & Installation of Below Elevator Spare Parts: 1.  ARD Batteries 12v 18AH   QTY 262. Change Ceiling Acrylic       QTY 4
Break Down Mixed Use
Riviera Lakeview, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply and Installation of Traction Sheave (L2, L3)Supply and Installation of Main Ropes (L2, L3)Emergency Landing Device Upgrade (L1, L2, L3)
Break Down Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope Description The contractor shall carry out the complete replacement of the elevator governor units for the identified lifts, including all associated works necessary to ensure safe and compliant operation. Detailed Scope of Works Supply of new elevator governor units suitable for the installed elevator system. Replace...
Break Down Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scoppe of Work:Supply & Installatsion: 1. Main steel Rope 12mm2. New ARD with Batteries 3. ARD batteries 18AH Testing and Startup 
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Replacement of the current batteries with 12V 18Ah sealed lead-acid batteries that meet the elevator manufacturer’s specifications. The new batteries will ensure proper operation of the ARD system and compliance with safety standards.