Search Jobs
Replacement of Pergola at the Balcony - Centurion Residence (JB004-26-03866)
Break Down
Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Pergola at the Balcony - Centurion Residence
The affected wooden members will be Replaced as required, and the pergola will be properly aligned and securely fixed.
Necessary treatment and protective coating shall also be applied to improve its durability and protect it from further weather-related ...
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Facade Glass – Roof Swimming Pool, La Riviera Tower, Marina, Dubai.
3 cracked double-glazed panels requiring immediate replacement and also notes 6 fogged double-glazed panels caused by IGU seal failure.
Scope of Work – Facade Glass Replacement
Sr. No.
Scope of Work / Material
Specificatio...
Façade Glass Panel Replacement – Reception Area - THE COMMUNITY (JB004-26-03735)
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Façade Glass Panel Replacement – Reception Area
Scope of Work:
Replace the cracked/damaged façade glass panel located above the sofa in the reception area.
Remove all loose/broken glass fragments and thoroughly clean the affected surrounding area.
Keep the affected area safely isolated until complet...
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Façade Glass and Swimming Pool Entrance Glass Door
Scope of Work:
Replace the damaged façade glass panel at the Ground Floor Restaurant Area, approximately 369 × 139 cm, one side.
Maintain the affected façade glass area safely barricaded/isolated until replacement is comp...
Replacement of Broken Facade Glass Panel - IT Plaza (JB004-26-02772)
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Broken Facade Glass Panel - IT Plaza
Scope of Work:
• Inspect the broken facade glass panel at 10th floor main entrance side.
• Barricade/protect the work area before starting the work.
• Remove the broken facade glass panel safely.
• Supply and install new facade glass panel matching the e...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Faulty Sensors for VRF Outdoor Unit (Group 14-1A) and System Rectification
Scope of Work:
Inspect the VRF Outdoor Unit (ODU) serving Group 14-1A to verify the cooling issue.
Shut down and isolate the electrical power supply to the VRF Outdoor Unit before commencing work.
Recover and safely remov...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
External Building Wall Crack Repair and Repainting Works Using Rope Access
Scope of Work:
Carry out inspection of all external building walls and identify faded paint, black water stains, cracks, and other damaged areas.
Execute the work for the complete external façade covering 10 floors and 162 balconie...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work (For RFP)
Conduct a detailed inspection of the building façade at Ground Floor Reception, 1st Floor, 2nd Floor, 3rd Floor, 4th Floor, and Roof levels.
Remove all loose, damaged, and peeling paint from the affected façade areas.
Identify, prepare, and repair all visible cracks u...
Proposal for – Painting & Corrosion Protection Works (JB004-26-01419)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Executive Summary: At Jewellery & Gemplex Buildings 1,2&3, roof handrails, sheets, and structural channels show advanced
corrosion due to prolonged exposure to weathering, moisture, and UV radiation, resulting in coating failure
and rust formation. Internally, wall paint systems have significantly deteriorated,...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The existing doors are no longer functional, resulting in persistent odor spreading across the ground floor and generating ongoing complaints from residents and visitors.
The scope covers the removal of all existing damaged doors across the three buildings and their replacement with heavy-duty, impact-resistant shutters. The ...
Facade glass crack & roof coping cap (JB004-26-00964)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Facade glass crack & roof coping capthe glass was cracked due to changes of atmospheric
temperature.Damage to the coping cap was observed at the roof level.Replace all cracked façade glass panels Replace damaged coping cap at Roof Note: Kindly visit the site before submitting the quotation.
Supply & Replacement of Balcony Glass - GCV (JB004-26-00651)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of balcony glass of size of the broken glass is approximately 1300 mm x 1000 mm.