Search Jobs
Supply & Replacement of FCU - GCV 1 (JB004-26-00310)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Cut the Gypsum and wood ceiling for FCU access - 1 noReplace the FCU Restore the ceiling as beforethe FCU details are attached in attachment
Facada Glass Replacement (JB004-26-00234)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: Replacing the façade glass to restore visibility and maintain the structural integrity and quality of the façade system.Approximately glass size – 110 cm * 90 cm
BMU Rectification work (JB004-26-00232)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Power socket damaged due to wear and tear. Power socket need to be replaced.Up Limit switch damaged due to electriacal failure and wear and tear. Limit switch need to be replaced.Pressure Roller damaged due to usage, wear and tear. Need to be replacedRope Guide damaged due to usage, wear and tear. Need to be rep...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
System Isolation and Preparation
Isolate and depressurize the affected section of the pipeline system in accordance with site safety and operational procedures.
Verify zero pressure before commencement of dismantling.
Dismantling and Removal
Remove existing 6-inch and 4-inch copper pipelines from the pump header con...
RECTIFICATION OF HOT WATER LEAKAGE (JB004-26-00227)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Hot Water Leak Rectification
Replacement of faulty gate valve and associated pipes in front of Apartment 1005.
Replacement of faulty PPR pipe, gate valve, and fittings, including ceiling repair and painting, in front of Apartment 609.
Replacement of PPR pipe and fittings in front of Apartment 209.
Apar...
rectification works for the calorifier (JB004-26-00226)
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Supply & installation of:
Heavy Duty water immersion heater as per enquiry.
Rating – 203V – 3000 watts.
Sheath –
stainless steel seamless 316L grade tube fitting with 1/14” BSP Threaded
adapter.
Thermostat sump type will be provided along with terminal protection
cover.
Selector switch for circular pu...
replacement of elevator sheave, rope and ELD (JB004-26-00192)
Break Down
Mixed Use
Riviera Lakeview, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply and Installation of Traction Sheave (L2, L3)Supply and Installation of Main Ropes (L2, L3)Emergency Landing Device Upgrade (L1, L2, L3)
Fire Protection Systems Rectification (JB004-25-04237)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:1. Fire Protection System – FM200 (Shield System)
The contractor shall carry out the following works:
Supply and install safety covers for all FM200 manual release switches.
Refill HFC227EA gas in the FM200 system cylinders (45 kg capacity).
Replace faulty 3” impulse valve discs.
Perform complete testing...
Fire Fighting Rectification work (DCD Snags) (JB004-25-03973)
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SCOPE OF WORK: 1 Rectification of Electric Motor including•Supply & Replacement of Motor Bearing-2 nos•Re-varnishing of Motor-1 no•Servicing of Motor Shaft-1 noRectification of Electric Pump including•Supply & Replacement of Pump Bearing-2nos•Supply & Replacement of Gland Packing-1 no•Removing of P...
RFP FOR LIFTS REFURBISHMENT (JB6873-25-00137)
Enhancement
Mixed Use
Cluster Q , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
Elevators: 4 Units
Dismantling & Removal of ElevatorsRemove existing
wall panels, ceiling, flooring, handrails, and other outdated fixtures.Carefully
dismantle light fittings, fan covers, and mirrors.Remove skirting,
control panel fascia, and false ceiling.
Cabin Interior Works
Wall Panels:
Supply and install new...