Search Jobs

Break Down Residential
Al Helal Al Zahaby, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryMost of the tube lights are not functioning due to ageing, as they have been continuously in operation. Immediate replacement is required to prevent failure of the second light on the same panel and avoid complete lighting loss in the respective areas.Details of Non-Working Tube LightsGround Floor – 12 nosFirst Floor (...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe sewage transfer system (Tank capacity: 4 × 4 × 8 = 128 m³) is facing frequent blockages due to disposable tissues, garments, fabric waste, and inadequate filtration. These materials obstruct the delivery line, causing sewage overflow, health and environmental risks, increased maintenance costs, and potential motor ...
Break Down Mixed Use
Trade Centre First, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Bidders,Kindly check the requirement of Removal and Complete service of Door including replacement of floor mechanism , top frame mechanism , door top and bottom part repair and Alignment .Herewith attached scope of works and images for your kind reference and proposal/.For site visit and clarifications, Please coor...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary Out of thirty (30 Nos.) Staircase Pressurization Fans (SPF) and Smoke Extract Fans (SEF) installed in 2004 across Jewellery & Gemplex Buildings 1, 2, and 3, nineteen (19 Nos.) units (sixteen (16 Nos.) SPF and three (3 Nos.) SEF) are currently non-operational. These systems are critical components of the building’s...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary Leakage has been identified at drainage pipe T-fittings within twenty-four (24 Nos.) shafts of the Jewellery & Gemplex Buildings. The drainage pipelines, originally installed in 2004, have deteriorated due to prolonged and unrectified leakage from chilled water pipe insulation. Continuous water exposure has caused...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary The existing Schneider Electric Building Management System (BMS) installed at Jewellery & Gemplex Buildings 1, 2, and 3 is non-functional and inadequate for effective operational control. The system does not support proper monitoring, automation, or energy management of HVAC and electrical systems. Critical equipm...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary The epoxy flooring installed in J&G Buildings 1, 2, and 3 (excluding recently renovated DMCC areas) has significantly deteriorated due to age and heavy usage since installation in 2004. The flooring exhibits loss of slip resistance, cracking, and delamination, creating safety risks. The surfaces have reached the e...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,,   Greetings from Strata Global!   We would like to invite you to do the site visit and submit the us your proposal for the Leakage rectification in Marina Arcade located in Dubai Marina   Project: Marina Arcade, Dubai Marina Scope of work: Facade glass leakage rectification  ...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe Recirculation Air Handling Unit (RAHU) blowers (55 Nos.) at J&G Building have reached the end of their service life. Installed in 2004 and repeatedly repaired over the years, the blowers are now severely rusted and worn out beyond repair, resulting in inadequate cooling in the served residential rooms. Urgent r...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe MEKAR FAHU located on the 13th floor rooftop of J&G Building 3 has suffered severe and irreversible damage due to prolonged exposure to corrosive chemical fumes. A faulty scrubber fan system allowed continuous exposure, resulting in extensive corrosion of the cooling coil and heat wheel. The unit is beyond repa...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe aluminum cladding installed on rooftop FAHUs, associated ductwork, and chilled water piping at J&G Buildings 1, 2, and 3 has reached the end of its serviceable life due to prolonged exposure to high wind conditions since installation in 2004. The deteriorated and loose panels present a critical safety hazard, w...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe GRP fume duct used for chemical fume disposal in J&G Building 3 has suffered significant damage due to prolonged exposure to corrosive chemical fumes and associated reactions. The duct integrity has been compromised, resulting in leaks and condensation along the scrubber duct system, which has led to water ingr...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Replacement of Variable Frequency Drives:Isolate and remove four (4) faulty 55 kW Schneider Electric VFD units from chilled water pump system.Supply four (4) new 55 kW VFDs compatible with existing pump motors.Install and reconnect power and control wiring.Program and configure VFD parameters as per motor require...
Contract Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work Asset Description:Bathtech Sauna-1noHarvia Steam-1noSpare Parts:Non-ComprehensiveRequirements during the tenure shall be quoted separately with the best quality and competitive market rate.Maintain a reasonable inventory of essential spare parts for maintenance and services falling within the scope of servi...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   We would like to invite you to do the site visit and submit the us your proposal for the Supply and installation of Granite reception desk in Marina Arcade located in Dubai Marina   Project: Marina Arcade, Dubai Marina Scope of work: Supply and ins...
Break Down Mixed Use
Business Bay, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   We would like to invite you to do site visit and submit us your proposal for the Background music rectification work in 15 Northside.   Project: 15 Northside, Business Bay Scope of work: Background music System rectification works     ...
Break Down Mixed Use
Spica Residence, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Option1 : Full Height Paint System( Jotun - Fenomastic) Scope Includes: Surface inspection and preparation Removal of loose/peeling paint Crack repair and surface leveling with approved crack filler Sanding to get smooth surface and cleaning Application of one coat alkali-resistant primer Application of two coats...
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Lifecycle Replacement of Domestic Gravity Water Distribution System, Al Shera TowerThis project involves the full lifecycle replacement of the existing domestic gravity water distribution system due to chronic leakage and end-of-service deterioration. The scope includes vertical risers, horizontal distribution within common s...
Break Down Mixed Use
Apricot Tower Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Rectification of Stuck Butterfly Valve at Chilled Water Return Line:Inspect the faulty butterfly valve on the chilled water return line.Remove the defective/stuck butterfly valve.Supply and install a new butterfly valve of the same specification.Reconnect and test to ensure proper operation and leak-free performa...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary: Out of six (6) existing 2.5 TR Hitachi window AC units serving the Scrubber Control Panel Room and Store room, five (5) units are non-operational, and one (1) unit is operational but insufficient to maintain required cooling. The units have exceeded their service life and require replacement to ensure reliable and co...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Replacement of Chemical Dosing Pump:The chilled water Chemical dosing pumps in all three buildings have been non-functional for an extended period. As a result, no routine chemical dosing has occurred, which has likely led to degraded water quality and an increased risk of corrosion and scaling within the chill...
Contract Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Asset Description:Quantity: 1nosTank 1 – RCC tank at Ground Floor- 80,000 GallonService Frequency:Half Yearly – 2 times/YearConsumables and Spare Parts:ComprehensivePPM consumables shall be included in the service.General Terms:Hygiene services shall be carried out in accordance with HS (G) 70 guidelines for the prevention of...
Break Down Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of 1.5 Ton AC to 2.5 Ton AC (Indoor & Outdoor) inside LV Room Materials Required:  1. Split AC 2.5 Ton Replacement required for both indoor and outdoor  2. COPPER COIL 5/8 C. LOOSE  3. MTR 121-10039 COPPER COIL 3/8" C (LOOSE)  4. GAS R-410 11.3KG REFRON INDIA ...
Break Down Residential
JVT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Need to Install Ceramic tiles on upper deck level side wall and lower entrance wall section.Dimension for area to be covered on wall is as follows:Upper deck level side wall: Length 65 m, width 0.85 mLower entrance wall section: Length 34 m, width 0.75 m*Note: It is recommended that the vendor verifies the ...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Drain Riser Line Leakge 1. Permanent Rectification (Recommended) • Open the riser shaft wall areas  • Carefully expose the vertical drainage pipeline. • Remove the damaged/leaking section of the drainage pipe. • Replace with new approved drainage piping and fittings. • Properly refix and sec...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
ramp area lighting non-functionalObservation & Findings: • Several wall-mounted LED lights are non-functional.• Some light frames are damaged and require replacemenWall LED Lighta • Replace the existing ramp wall lights – 30 Nos. • Supply and install new wall lights along with all required accessories. ...
Contract Residential
Dubai Health Care City Phase 2, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   We would like to invite you to do the site visit and submit the AMC proposal for “Swimming Pool Maintenance” for the 2026 budget. Please refer attached RFP document.   Project Name : “Affini – A Tribute Portfolio Residences” located in Al Jaddaf, D...
Break Down Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and Applying of Roof Sealing and Waterproofing (Approx. 240.00m2)Surface Cleaning & Preparation:The entire roof surface will be cleaned thoroughly to remove dust, debris, and other contaminants, ensuring optimal adhesion of the waterproofing system.Crack Coverage & Detailing:Visible cracks a...
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Comprehensive Replacement of Chilled Water Pipe Insulation System Basement to RooftopThe purpose of this contract is to appoint a qualified contractor to undertake the complete survey, engineering assessment, removal, supply, installation, testing, and commissioning of a high-performance chilled water pipe insulation system a...
Break Down Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Capacitor Panel No. 7 is currently non-operational due to defective components. The following issues have been identified: Three (3) capacitor coils are burnt and require replacement. One (1) contactor is burnt and requires replacement. Burnt/damaged wiring must be replaced. The blue indicator lamp is not functio...
Services Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
1. Scope of Supply The selected vendor shall supply all materials as specified in the attached material details list. This may include electrical items, plumbing materials, HVAC spare parts, painting materials, door hardware, lighting fixtures, mechanical components, consumables, and general maintenance supplies. All material...
Services Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
1. Scope of SupplyThe selected vendor shall supply the materials listed in the attached “Material List for MVT 2026,” including but not limited to electrical items (weather sockets, sensor lights, ceiling lights, tube lights, timer switches, thermostats, access panels, etc.), painting materials (oil paint, epoxy paint, parkin...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
• Conduct complete inspection of electrical wiring and power supply. Identify and rectify any wiring faults. • Replace defective spotlights as required.
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Replacement of Aircraft Warning Light Dismantling of existing faulty Aircraft Warning Light. Supply and installation of new Warning Light. Cable checking, re-routing, and reconditioning as required. Replacement of damaged cables, glands, lugs, and conduits (if required). Proper termination, earthing,...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water leakage from common area ceiling. CHW pipeline insulation damaged.Rectification and replacement of damaged CHW pipeline insulation. Cutting of ceiling sections where access is not available for insulation works.  Removal of ceiling portions damaged due to water leakage from the CHW pipelines.  Re-fixin...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
CPVC flange T and Elbow failure Water leakage observed during routine inspection  Leakage identified at the CPVC flange connection  Crack detected in the CPVC T-joint  CPVC elbow found damaged and unsuitable for continued useReplace damaged CPVC components:  CPVC flange with gasket (4 bolts) – 75 mm ×...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
domestic water GRP tanks Damage Tank No. 1: Dimensions: 5.0 m × 5.0 m × 3.5 m Condition: Very poor condition o Cracks observed on external GRP panels o Internal panels and joints are severely damaged.Tank No. 2: Dimensions: 6.0 m × 5.0 m × 3.5 m Condition: Poor condition o Internal supporting joints found broke...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
replacing the Pressure Reducing Valve PRVs (2½” size)             QTY 32 • Replacement of faulty PRVs and butterfly valves is recommended to prevent further damage. Note: Please do the site visit before submitting the quotation. 
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of the PRV and gate valve is advised to restore consistent water pressure QTY 022” PRV and gate valve assembly.PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM Installation A. Supply & installation of Butterfly valve with necessary flanges & fittings accessories.B. Carryout installation of PRV with...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
cracked balcony façade glass it is recommended to replace the cracked balcony façade glass panel
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of FHRC Doors Damage and Corridor CHW Insulation — Tamweel TowerScope of Work;Carry out detailed site survey of all floors to identify FHRC doors damaged due to humidity and condensation.Inspect corridor CHW pipelines and existing insulation to identify sweating, insulation failure, and moisture ingress points.R...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the routine water tank cleaning, found the inside damages of GRP Tanks two GRP tanksTank size location 1: Tank No.1 is 5 mtr x 5 mtr x 3.5 mtr Tank No.2 is 6 mtr x 5 mtr x 3.5 mtr Tank Size Location 2:Tank No.1 is 5 mtr x 4 mtr x 4 mtr floor Tank No.2 is 5 mtr x 4 mtr x 4 mtrNeed to the empty t...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
balcony side glass brokenReplace the damaged balcony glass with a new panel and carry out the necessary corrective work, including cleaning or repairing the affected side tiles.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
water leakages at the site during rainfall (electrical room leakage) Solution for water leak complains  Need to remove old silicon of façade glass and apply new silicon by rope access/cradle. Apply new highquality, weather-resistant silicone sealant to the entire façade glass area to prevent further water ingress.&...
Break Down Residential
Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Appointment of Durability / Structural Engineering ConsultantConcrete Slab Crack Repair – Parking Area1. ObjectiveTo appoint a licensed durability/structural engineering consultant to prepare the complete repair design package, including detailed scope of work, technical specifications, BOQ, drawings, and authority approvals ...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A total of 16 outdoor AC units is installed on the rooftop area vibration and noise levels.Scope of Work: Carry out preventive maintenance and complete fan motor inspection and servicing for all 16 AC units at the earliest to reduce vibration and noise levels and to ensure smooth and efficient operation. • The exist...
Break Down Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. General Scope The Contractor shall carry out complete rectification works for the Swimming Pool, Jacuzzi Pool, Deck Area, Passage Area, and Shower Area, including dismantling, waterproofing, tiling, crack repairs, and associated civil & plumbing works as described below. All works shall be executed as per approved mat...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool Fence glasses is damaged Swimming Pool Area Fence Glass: (8 No. of Glasses)• Removal of Existing Damaged Glass. • Supply and Installation of Fence glass with required accessories. SPECIFICATION: 10 MM CLEAR TEMPERED GLASS. (7 Glass Size – Length 98 CM & Height – 123 CM) (1 Glass Size...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Execute the systematic removal and disposal of all damaged, corroded, or sharp-edged steel protection plates from the designated roof areas.Fabrication & Supply: Provide heavy-duty steel protection plates designed to withstand high-temperature rooftop environments and prevent further deterioration of AC pipelines .Install...
Break Down Mixed Use
divine residence, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Swimming Pool 8 No. of lounger cushion damagedwe highly recommend replacing the existing cushions with weather resistant sunbeds to ensure durability and maintain hygiene standards.Specification: (Wheater proof Material) Length: 181 CM Width: 54 CM Thickness : 4.5 CM