Search Jobs
Chillers, HVAC, FAHU, FCU Break Down (JB1099-25-01624)
Break Down
Mixed Use
Dubai Land - DLRC, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Kindly
check the requirement of Chiller Rectification works as per given scope of
works and share the proposal.For site
visit and more clarifications, Please coordinate with Mr Mukthi (FM Engineer) : +971 55 518 4791
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02514)
Contract
Mixed Use
Marina Wharf Tower 2 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: Chiller MaintenanceScope of work: Please find the attachment.Contractor shall provide maintenance and repairs and other services for the below chiller DescribtionModelQuantityScrew chillersY...
In-Unit FCU Maintenance Contract (JB007-25-02508)
Contract
Mixed Use
Marina Wharf Tower 2 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: In-Unit FCU MaintenanceScope of work: Please find the attachment.Cleaning of bag filtersCleaning of drain trayCleaning of AC GrillCleaning of strainerCleaning of condenser coil Contractor sh...
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02475)
Contract
Mixed Use
Marina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: Chiller MaintenanceScope of work: Please find the attachment.Contractor shall provide maintenance and repairs and other services for the below chiller DescribtionModelQuantityScrew chillersY...
In-Unit FCU Maintenance Contract (JB007-25-02470)
Contract
Mixed Use
Marina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: In-Unit FCU MaintenanceScope of work: Please find the attachment.Cleaning of bag filtersCleaning of drain trayCleaning of AC GrillCleaning of strainerCleaning of condenser coil Contractor sh...
Repair of FAHU Exhaust Blower (JB2190-25-00118)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
1. Blower Fabrication or Replacement
Inspect existing blower for damage or deterioration.
If the blower is beyond repair and no suitable replacement is available, fabricate a new blower as per operational requirements.
If a compatible replacement is available, proceed with installation and alignment – fabrication will n...
Proposal for the rectification of FCU - BTR (JB004-25-01991)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:
Conduct detailed inspection
Test and commission all 6 FCUs.
Identify and replace missing/damaged components.
If beyond repair, supply and install new FCUs (VTS Clima / American Breeze / Daikin).
Final testing, commissioning, and submission of completion report.Locations & Quantity:
Basemen...
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02441)
Contract
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer the attachment.
BTU Meter Replacement (JB2190-25-00116)
Services
Mixed Use
Jumeirah Lake Towers, Cluster T, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Background;
The building already has a 12 year old BTU metering
system installed. A large portion of the meters are not functioning
properly or providing the required meter readings. The objective is to provide
a low cost option to refurbish the existing system and bring it back to full
operation in compliance with the...
Rectification of Existing Chillers - La Riviera Tower (JB004-25-01954)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectify the identified defects in the three existing chiller systems at La Riviera Tower to restore full cooling functionality and operational safety. Rectification scope must cover mechanical, refrigerant, electrical and control components for each unit based on the inspection findings.Equipment SummaryChiller #ModelSer...
Proposal for the CHW Pumps Rectification (Pump No. 3 & 5)- BTR (JB004-25-01947)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
2. Scope of WorkChiller pumps No. 3 and No. 4Conduct VFD diagnosis for Pump No. 3 to confirm root cause of:
Abnormal noise
Humming and vibration
Overheating
VFD malfunction
Pump No. 3 (FELM F3 180 L4 – 22KW, 3Ph):
Dismantle and inspect pump components.
Replace or repair damaged internal components as per special...
Contract
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Building Name: LA Riviera Tower
Location: Jumeirah Village Circle (JVC), Dubai, UAE
Contract Type: Non-Comprehensive
Contract Duration: 1 Year (Renewable based on performance)Covered Equipment
Equipment TypeMake & ModelQuantityLocationChillerTrane RTAC-0140/1402 UnitsRoof LevelChillerTrane CGAM-0040/0401 UnitRoof LevelSer...
BTU Metering Service & Maintenance Agreement 2026 (JB007-25-01879)
Contract
Residential
Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers, Greetings from ASTECO! We are seeking for a proposal for BTU Metering Service & Maintenance Agreement 2026 at Dorra Bay Tower located in Marina, Dubai.NOTE:AED 500 Threshold must be mentioned in the quotation.Quotation must be SEMI-COMPREHENSIVE.For clarification and site visit,...
Break Down
Mixed Use
Apricot Tower Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
To replace the defective A2 compressor of Chiller #2 at Apricot Tower, ensuring full restoration of system functionality by addressing all associated mechanical failures and potential contamination issues.
2. Equipment Details
Unit Type: Air-Cooled Chiller
Model: 30GX 358 A0670
Serial No.: 12X714218
3. Scope of Work...
Supply and Replacement of Compressor -Riviera Dreams (JB004-25-01513)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Overhauling & Recommissioning of 140HP Chiller CompressorSupply, Overhaul, and Recommissioning of 140HP Chiller CompressorTo fully restore the performance and reliability of a 140HP reciprocating compressor found with shorted stator windings through a complete overhaul process. The selected contractor will...
Contract
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Provider, good day. We have requirements for BTU submetering services (reading, billing, maintenance and collection) in West Wharf, Business Bay. You can see the attached scope of works which is drafted as minimum requirement from us. Please go through the same and provide your proposal. Also,...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
- Supply for the Recirculation Air Handling Unit's blower (RAHU) - 55 nos.
FAHU & Condensing Unit Rectification Work in J5 building (JB004-24-02931)
Break Down
Residential
J5, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work in General • General Inspection of the Unit: Visual examination of the unit to identify any
potential hazards or issues. • Safety Inspection: Comprehensive safety assessment to ensure a safe working
environment. • Permit to Work (PTW): Obtain necessary permits and approvals bef...
Supply and Replacement of FAHU 2 Coil in Goldcrest Views (JB004-24-02831)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work Supply and Replacement of FAHU 2 Coil in Goldcrest ViewsSupply and replacement of coil for FAHU No.2 (Model:MEKAR- 03MKP12CD)a)Manufacture the new coils as per the existing design at siteb) Flushing the coils with nitrogen at factory for removal ofcontaminated items from the coils.c) Pressure tes...
Rectification of chiller 2 and 3 - IT Plaza DSO (JB004-24-02798)
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and replacement of below mentioned parts;1. Chiller #02, Model [Carrier /30XA-1102-60087-PE] S/N [12Y716191]Flow Switch Rusted and the pressure gauge not working, also display keyboard is damagedSupply and Replacement of ThermometerSupply and Replacement of Display Keyboard- 1nosSupply and Replacement of Water Pre...
Proposal for defective compressor -Atlantic Tower. (JB004-24-02751)
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of the defective compressorModel Number: -AWR5535EGH0030, & 1.5TR