Search Jobs
Rectification of Chiller #1 (JB007-25-03214)
Services
Residential
Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service
Providers,
Greetings from
ASTECO!
We are seeking
for proposals for the below detailed scope of work at Dorra Bay Tower located in Marina,
Dubai.NOTE: Warranty
must be mentioned in the proposal.
For clarification
and site visit, please contact of site FM Supervisor Mr. Nayyer at 055 132
0667.
Proposal for the FAHU Rectification – Roof Floor - IT plaza (JB004-25-02202)
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:1. Mechanical Rectification:
Rewinding of supply and exhaust fan motors.
Replacement of actuator (Honeywell ML7421B3003).
Servicing and/or replacement of CHW supply & return valves.
Cleaning and alignment of cooling coil fins; replacement if beyond repair.
Exhaust grill to be opened and restored t...
Proposal for the air curtain installation- IT plaza (JB004-25-02196)
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location:
B1 Escalator Lobby – 2 Nos
B1, B2, B3 Elevator Lobbies—6 Nos.
Total: 8 Air Curtains
Air Curtain Type:
Heavy-duty
Size: H-20cm, L-95cm, W-20cm
High velocity (up to 20 m/s)
Adjustable louvers
Auto ON/OFF with door sensors
Scope Includes:
Supply & install air curtains
Fixing above lobby ...
Chiller Condenser Tube Leak Rectification (JB007-25-03194)
Services
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer the attachments
Break Down
Residential
57VM+V68 - Downtown Dubai - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Reconditioning of Motors for FAHU Supply Unit with Replacement of New BlowersMotor Make: VTS Motor Capacity: Kw 15 380 Volts Type: VS-160M-4Scope of Work For Each Motor:Dismantling of motor from the siteOpening of motor servicing & cleaning of partsReplacement of Bearings (SKF) 02 NosCover sleeve new making & Fix...
Proposal for the replacment of FAHU - RLV (JB004-25-02192)
Break Down
Mixed Use
Riviera Lakeview, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1.Dismantling & Removal
Safely disconnect and dismantle 2 existing rooftop FAHUs.
Remove and dispose of damaged units as per regulations.
2. Supply of New Units
Supply 2 new FAHU units suitable for rooftop installation.
Units must meet current standards and capacity requirements.
Submit technical datasheets fo...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Project: CHW Insulation, Ceiling Fix
Area: Full Building (All Floors)Scope of Work: CHW Pipe Re-Insulation – Indigo Building (Common Areas)
Location & Coverage:
Entire building common area, from ground floor to rooftop.
Includes all accessible chilled water (CHW) pipework in service corridors, pump rooms, shaf...
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02514)
Contract
Mixed Use
Marina Wharf Tower 2 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: Chiller MaintenanceScope of work: Please find the attachment.Contractor shall provide maintenance and repairs and other services for the below chiller DescribtionModelQuantityScrew chillersY...
In-Unit FCU Maintenance Contract (JB007-25-02508)
Contract
Mixed Use
Marina Wharf Tower 2 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: In-Unit FCU MaintenanceScope of work: Please find the attachment.Cleaning of bag filtersCleaning of drain trayCleaning of AC GrillCleaning of strainerCleaning of condenser coil Contractor sh...
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02475)
Contract
Mixed Use
Marina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: Chiller MaintenanceScope of work: Please find the attachment.Contractor shall provide maintenance and repairs and other services for the below chiller DescribtionModelQuantityScrew chillersY...
In-Unit FCU Maintenance Contract (JB007-25-02470)
Contract
Mixed Use
Marina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: In-Unit FCU MaintenanceScope of work: Please find the attachment.Cleaning of bag filtersCleaning of drain trayCleaning of AC GrillCleaning of strainerCleaning of condenser coil Contractor sh...
Chillers, HVAC, FAHU, FCU Contract (JB007-25-02441)
Contract
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer the attachment.
BTU Meter Replacement (JB2190-25-00116)
Services
Mixed Use
Jumeirah Lake Towers, Cluster T, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
Background;
The building already has a 12 year old BTU metering
system installed. A large portion of the meters are not functioning
properly or providing the required meter readings. The objective is to provide
a low cost option to refurbish the existing system and bring it back to full
operation in compliance with the...
BTU Metering Service & Maintenance Agreement 2026 (JB007-25-01879)
Contract
Residential
Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers, Greetings from ASTECO! We are seeking for a proposal for BTU Metering Service & Maintenance Agreement 2026 (211 units) at Dorra Bay Tower located in Marina, Dubai.NOTE:AED 500 Threshold must be mentioned in the quotation.Quotation must be SEMI-COMPREHENSIVE.For clarification and...
HVAC System Maintenance 2026 (JB007-25-01856)
Contract
Residential
Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service
Providers,
Greetings from
ASTECO!
We are seeking
for a proposal for HVAC System Maintenance 20256 at Dorra Bay Tower located in Marina, Dubai.NOTE: AED 1000 Threshold must be mentioned in the quotation.
For
clarification and site visit, please contact of Mr. Nayyer at 055 132
0667.&nb...
QUOTATION REQUEST FOR FAHU REFURBISHMENT & DUCT CLEANING WORKS (JB6873-25-00034)
Break Down
Mixed Use
Cluster Q , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT DMCC
FAHU REFURBISHMENT & DUCT CLEANING WORKS:1. Fahu 1, 2 ,3, 4 Pre filters replacement work.2. Fahu bag filters replacement work. ( 4 fahu's)3. Heat wheel motor service and cleaning work. (4 Fahu's)4. Cooling coils replacement work ( 4 fahu's)5. Heat pipe installation work ( 4 fahu's)6. Supply motor and blower service work (...