Search Jobs
Capacitor Bank Rectification Work (JB007-23-02922)
Break Down
Residential
Dubai Gate 1 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Sr No
Description
Qty
1
300KVAR Capacitor Bank (Fed from MDB-01)
1.1
Supply and Installation of 28KVAR, 440V Capacitor
2 Nos.
1.2
Supply and Installation of 63A
bottle type fuse with new
4 Nos.
1.3
...
Basement 2 Domestic Water Transfer Pipeline Rectification Works (JB007-23-02910)
Services
Mixed Use
Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
Basement 2 Domestic Water Transfer Pipeline Rectification WorksDescription:* 6” GI Pipeline Rectification* General Site mobilization and site safety* Supply and fixing scaffolding.* Supply and fixing pipe hanging support,* Removing existing damage clamp (4nos )* Supply and installation new 6”clamp (colour match with existing)...
ETS ROOM AND FAHU BLOWER (JB007-23-02896)
Break Down
Residential
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Description
Qty
FAHU Blower
1
DRV VALVE
6
Butterfly valve
6