Search Jobs

Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Comprehensive Replacement of Chilled Water Pipe Insulation System Basement to RooftopThe purpose of this contract is to appoint a qualified contractor to undertake the complete survey, engineering assessment, removal, supply, installation, testing, and commissioning of a high-performance chilled water pipe insulation system a...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
PRV Water leakagereplacement of the PRV and gate valveSupply & Installation of 2” PRV and gate valve assembly
Break Down Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The building’s DEWA water meter rooms and associated common areas are experiencing recurring water leakage incidents due to the severe corrosion and deterioration of water pipes, fittings, and valves. The aging infrastructure has compromised the integrity of the water supply system, resulting in uncontrolled water discharg...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Booster pump system RectificationSTATEMENT OF PROBLEM: Booster pump system is experiencing several issues that need to be addressed. Pump #1 is experiencing oil seal leakage, rust formation, and leakage from the air release point. Additionally, the Variable Frequency Drive (VFD) requires servicing and new parameters...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: Inspection and troubleshooting of 02 Nos. chilled water chemical dosing systems, including control panels, dosing pumps, sensors, and associated piping. Dismantling and repair of faulty dosing pump components. Cleaning of blocked injection lines and removal of any internal blockages. Recalibration of ch...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: Inspection and verification of the existing Pressure Reducing Valve (PRV) and Butterfly Valve installed in the 4th Floor Water Meter Room. Isolation and shutdown of water supply to carry out safe maintenance work. Dismantling and removal of 01 No. faulty PRV with internal damage causing abnormal loud nois...
Break Down Residential
JVT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: Inspection of the affected FCU unit serving the 4th floor corridor. Dismantling and removal of the damaged FCU motor. Rewinding of motor winding to restore operational condition. Reinstallation of the motor and reconnection of power supply. Testing and commissioning of the FCU to ensure proper functio...
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work (SOW) Proper Dressing of Electrical & ELV Cables – Building Common AreasProper dressing, alignment, segregation, tagging, and securing of all electrical and ELV cables above the false ceiling in all building common areas (lobbies, corridors, lift lobbies, basements, staircases, and service areas). The contra...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary The 3" float valves serving the main water tanks in J&G Buildings 1, 2, and 3 have failed and are non-functional. As a result, the water tank system is currently being operated under manual control, requiring continuous manpower monitoring and posing a risk of overflow and meter malfunction. Urgent replacement is ...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary The chlorine dosing pumps serving the domestic water systems in J&G Buildings 1 and 3 are nonfunctional, resulting in the absence of required chemical treatment and disinfection. This presents a significant health, operational, and compliance risk, including potential bacterial growth, biofouling, and deterioratio...
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
No proper access for FCUArrange adequate access for FCU PPM across all floors to prevent equipment damage and maintain efficiency
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Drain line design deficiencies are causing intermittent leakageDue to a design flaw in the drain lines, there is leakage and odor in the apartment and common areas, posing potential health risks to tenantsImproving the drain line design and performing the necessary repairs will completely eliminate the leakage and odor issues...
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
defective pressure vessel bladderReplace the defective pressure vessel bladder in CHW Make-up Tank (ETS B1) to restore and maintain proper system water pressure.
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Isolator in the control panel of the CHW Make-up Pump System (ETS & Roof Panel) is defectiveReplace the defective isolator in the control panel of the CHW Make-up Pump System (ETS & Roof Panel) to ensure that power can be safely disconnected, eliminating operational and safety risks
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water Leakage from chill water pipe Insulation Water seepage damaging followings,  Exit lights,  Fire alarm systems,  Gypsum ceilings,  Possible to damage CCTV camera.Replacing of CHW insulation from: (Total -335 Running meter approx.) 1) Removal of existing Insulation for Chilled water ...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Booster Pump No. 3,  impeller body  leakage• Isolated and safely shut down Booster Pump No. 3. • Identified the exact leakage point on the impeller body • Replaced the damaged impeller
Break Down Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary The main garbage room at the Ground Floor requires renovation due to extensive damage to floor and wall tiles, along with non-functional drainage and electrical systems caused by ageing components. The condition of the room has led to hygiene concerns, moisture infiltration, and operational inefficiencies. Scope of Wo...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Summary Out of thirty (30 Nos.) Staircase Pressurization Fans (SPF) and Smoke Extract Fans (SEF) installed in 2004 across Jewellery & Gemplex Buildings 1, 2, and 3, nineteen (19 Nos.) units (sixteen (16 Nos.) SPF and three (3 Nos.) SEF) are currently non-operational. These systems are critical components of the building’s...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Replacement of Variable Frequency Drives:Isolate and remove four (4) faulty 55 kW Schneider Electric VFD units from chilled water pump system.Supply four (4) new 55 kW VFDs compatible with existing pump motors.Install and reconnect power and control wiring.Program and configure VFD parameters as per motor require...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Replacement of Chemical Dosing Pump:The chilled water Chemical dosing pumps in all three buildings have been non-functional for an extended period. As a result, no routine chemical dosing has occurred, which has likely led to degraded water quality and an increased risk of corrosion and scaling within the chill...
Contract Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract for MEP & Cleaning ServicesManpower DeploymentFacility Engineer / Supervisor – 1day (Full Time) Multi Technician – 2No. (Day Shift)Electrical technician - 2No. (Night Shift) Total= 5 Nos.(Including Supervisor)Cleaning TeamCleaners – 4 Nos. (Day Shift including)Cleaners – 1 No. (Night ...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Drain Riser Line Leakge 1. Permanent Rectification (Recommended) • Open the riser shaft wall areas  • Carefully expose the vertical drainage pipeline. • Remove the damaged/leaking section of the drainage pipe. • Replace with new approved drainage piping and fittings. • Properly refix and sec...
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Replacement of Aircraft Warning Light Dismantling of existing faulty Aircraft Warning Light. Supply and installation of new Warning Light. Cable checking, re-routing, and reconditioning as required. Replacement of damaged cables, glands, lugs, and conduits (if required). Proper termination, earthing,...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water leakage from common area ceiling. CHW pipeline insulation damaged.Rectification and replacement of damaged CHW pipeline insulation. Cutting of ceiling sections where access is not available for insulation works.  Removal of ceiling portions damaged due to water leakage from the CHW pipelines.  Re-fixin...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
CPVC flange T and Elbow failure Water leakage observed during routine inspection  Leakage identified at the CPVC flange connection  Crack detected in the CPVC T-joint  CPVC elbow found damaged and unsuitable for continued useReplace damaged CPVC components:  CPVC flange with gasket (4 bolts) – 75 mm ×...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
replacing the Pressure Reducing Valve PRVs (2½” size)             QTY 32 • Replacement of faulty PRVs and butterfly valves is recommended to prevent further damage. Note: Please do the site visit before submitting the quotation. 
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A total of 16 outdoor AC units is installed on the rooftop area vibration and noise levels.Scope of Work: Carry out preventive maintenance and complete fan motor inspection and servicing for all 16 AC units at the earliest to reduce vibration and noise levels and to ensure smooth and efficient operation. • The exist...
Break Down Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Execute the systematic removal and disposal of all damaged, corroded, or sharp-edged steel protection plates from the designated roof areas.Fabrication & Supply: Provide heavy-duty steel protection plates designed to withstand high-temperature rooftop environments and prevent further deterioration of AC pipelines .Install...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Mechanical room Booster pump pressure vessel line leak and Rubber flexible joint crack at discharge line. During routine inspection, we found that the water leak at Pressure vessel old MS line which is connected to discharge header of booster pump in Mechanical room. On further investigation, we found minute crack at R...
Contract Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract for MEP & Cleaning ServicesManpower DeploymentFacility Engineer / Supervisor – 1day (Full Time)HVAC Technician – 1no (Full Time). Multi Technician – 1 No. (Day Shift)Electrical technician - 1day/1night. Cleaning TeamCleaners – 4 Nos. (Day Shift including)Cleaners – 1 No. (Night Shift)...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,   Greetings from Strata Global!   Kindly arrange a site visit and send us your best proposal for Application of Fire Rated silicon in Chilled water pipeline sleeves in Marina Arcade, located in Dubai Marina, Dubai.   Scope of Work: Application of Fire Rated silicon in Chilled wat...
Contract Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract (AMC) – Non-ComprehensiveLaundry Machines (Coin-Operated Washing Machines & Dryers)1. Contract OverviewThis Scope of Work defines the services to be provided under a Non-Comprehensive Annual Maintenance Contract (AMC) for the maintenance and technical support of installed coin-operated laundry ...
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply and install:1. Staircase Pressurization Fan Motor▪ 415V, 3-phase, 50Hz▪ Fire-rated duty, Insulation Class F/H▪ IP55 rating2. Smoke Extract Fan Motor▪ High-temperature rated (e.g., 250°C/2hr)Insulation Class H▪ 415V, 3-phase▪ IP55 or higher Testing and Commissioning:• Electrical termination, earthing,...
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Hot Water Leak Rectification Replacement of faulty gate valve and associated pipes in front of Apartment 1005. Replacement of faulty PPR pipe, gate valve, and fittings, including ceiling repair and painting, in front of Apartment 609. Replacement of PPR pipe and fittings in front of Apartment 209. Apar...