Search Jobs

Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1 Supply & Installation of Filter lid for the jacuzzi pump01 Nos2 Supply & Installation of New Dosing System & Pumps Brand: Astral Model: 74499 Warranty 1 Year from Manufacturer 01 Nos
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
GRP Panels inside strengthen and Repairing & Inside all joints clean & lamination full Refurbishment work. Tank SIZE. 5 MTR X 5 MTR X 3.5 MTR 1. All joints inside will be cleaned & In-between joints heavy duty lamination will be applied. 2. To stop any leakage, Strengthening of the panel joints by applying G...
Break Down Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1.Civil Works-• Floor Drain trop cover3x3x2”- 7 Pcs• Floor trop cover 6x6 – 5 Pcs• PVC floor trop cover 6x6”- 7 Pcs2.Supply of LV Room Mat.• Black Rubber Electrical Safety Mat (Max- 450V) - 1.5 X 1.5 Meter - 1 no.• Black Rubber Electrical Safety Mat (Max- 450V) - 3.0 X 1.0 Meter – 1 no.• Black Rubber Electrical Safety Mat (Ma...
Break Down Commercial
Mansions Owners Association Management DMCC B1-OA Concorde Tower 1,Jumeirah LakesTow, Jumeirah Lakes Towers, Jumeirah Lakes Towers, Dubai, 12370, , Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
Dear valued partners,Rectification of pipes is required, all the locations of damaged pipes are inside the apartments and is detected by CCTV inspection. Report is attachedImportant notes1. The rectification work will take minimum 3 to 4 days to complete in each apartment.2. Wall openings need to make inside the apartments to...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
LED aircraft light specification:Medium Intensity Type AB Aviation Obstruction Light.Operating Voltage: DC12V (Solar powered Way).Power consumption: 25W.Light intensity:2000cd.Emitting color: White (Day) and Red (Night) LED.Beam angle:360° horizontal.Size(mm): 649mm×600mmx477mm.Ingress protection: IP65.Operating temperature: ...
Break Down Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Total Asset Details: FAHU-B-01, FAHU-B-02, Club FAHU, FAHU-R-01, FAHU-R-02                                                                      &nb...
Break Down Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1.ROOF GYM CORRIDOR SMOKE DETECTOR WITH BASE FA 1 nos SHIELD.2.3F GARBAGE ROOM & 1403 KITCHEN HEAT DETECTOR & HEAT DETECTOR WITH BASE 2nos SHIELD3.ROOF LIFT ROOM MULTIPOINT SMOKE DETECTOR FA 1nos SHIELD4.FIRE CABLE RED 2C 1.5 MM2 WITH FITTINGS & ACCESSORIESFA&...
Break Down Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and installation of chilled water insulations in common area with necessary civil works: 1. Removal of necessary devices, AC grills & all others from the ceiling. 2. Removal of the existing ceiling along with the existing entire insulation. 3. Rectification of any leakage in the chiller pipe. ...
Break Down Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and installation of chilled water insulations in common area with necessary civil works:1. Removal of necessary devices, AC grills & all others from the ceiling.2. Removal of the existing ceiling along with the existing entire insulation.3. Rectification of any leakage in the chiller pipe. (If found)...
Services Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
Please refer attachment
Break Down Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work:- Jet Pump 1 service (Body leak, Water seal service): Brand Astral: Qty 1- Replacement of Multiport valve: Qty 1- Replacement of Stainer Basket: Qty 1- Necessary Plumbing
Break Down Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of work: (Block A and B)- Reception area A & B: Removal of the existing & fix new aluminum strip lights with profile: L250cm (using 35mtr. scaffolding) - qty 16 in each block (Total qty 32)-  Reception area A & B: Removal of the existing & fix new aluminum strip lights with profile: L100cm (...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Goldcrest Views - FAHU Heat Recovery Wheel Motor RepairingQty: 8Scope of Work:Repairing of 0.37KW heat wheel motorMotor rewinding and varnishingRotor bearing replacementMotor shaft machining and repairingRotor shaft welding, machining, and keyway creation as per gear shaft      specificationsGearbox replacement...
Break Down Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Supply & Installation of AIR VENT 3/4'' and 1/2'' size, with GI type fittings - 25 nos2. Supply & Installation of 3 fit high pressure hose pipe 1/2'' size, with GI type fittings - 8 nos
Break Down Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Al Shera Tower - Supply and installation of PRVs and Isolation valves with necessary pipe modification in main riser.Location: 28th & 15th floorsScope of Work:6'' PRV Herz PN16 [ HVPRVF-03] PRV Ductile Iron Body Pilot Operated, Epoxy Coated PN16 DN 150 (Qty. 2)6" BV PN16 Gala USA DN150 WRAS approved Gala Wafer Pin Type Bu...
Break Down Residential
La Riviera Azure, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Rooftop joint sealant removal / applying new.Affected wall & ceiling repairing & painting.(Apartments 402.410,413. & 315)2. Apartment 408,407,117 and 112. Balcony pipeline blockage rectification with high pressure