Search Jobs

Break Down Mixed Use
Laguna Tower Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Dear Service Providers, Greetings from SAGA International! We would like to request a Proposal for Repairing of Chilled Water Pump No. 3 VFD in the Basement - ETS Room for our building Laguna Tower located in JLT Cluster A Dubai.For site visit, please contact, Mr. Omkar (056 946 1655) and Engr. Fanuiel (054 410 7226...
Services Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
  Removal & Refixing of Tertiary Pumps from the site location – 2 nos       · Needs to be addressed and rectified the abnormal sound of the pumps and water leakage issues from the mechanical seal side.        · Necessary repairing and servicing of the pump.
Break Down Mixed Use
Laguna Tower Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International
Supply and Installation of Booster Pump in 1FFor more information about the work, please contact Mr. Fanuiel at +971 54 410 7226.
Services Residential
Dec Towers Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International
Pump side repair -Replacement of double sidemechanical seal,Oil seal,Pump sidebearing , ‘O’rings, Shaft sleeve andservicing.-1 nosMotor side – Replacement of motorbearings, Stator cleaning, Motor shaftpolishing, New rubber couplingelement. Installation of new rubbercoupling element, pump and motoralignment work.- 1no.