Search Jobs

Break Down Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
BackgroundDuring a site inspection of the rooftop lift room, water seepage was observed on the interior surface of the gypsum wall. The source of the leakage was traced to the exterior glass cladding area, where the silicone sealant has deteriorated and allowed rainwater to penetrate through the joint. The ongoing seepage is ...
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Carry out waterproofing repair of RCC Water tank and apply a new protective coating inside the tankScope of Work: Floor area-70SQM,  Ceiling area-70SQM, Wall area-205SQM, Tank capacity- 60000 Imperial gallons Permanent rectification of recurring water leakage from the water tank side ground floo...
Break Down Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Carry out waterproofing repair of RCC Water tank and apply a new protective coating inside the tankScope of Work: Floor area-70SQM,  Ceiling area-70SQM, Wall area-205SQM, Tank capacity- 60000 Imperial gallons Permanent rectification of recurring water leakage from the water tank side ground floo...
Break Down Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of WorkA comprehensive inspection will be carried out across all reported leakage areas, including Apartment 3201, the ground floor staircase area, the ground floor waiting hall, the first floor bedroom near the window area, Office 410, and the 28th Floor Water Meter Room, to assess the full extent of water ingress and ...
Break Down Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At La Vista Residence-3, Dubai Silicon Oasis, significant water leakage has been identified in the swimming pool pump room, as well as the electrical and telephone rooms. The issue originates from failed waterproofing and deteriorated pool floor tiles, allowing continuous water ingress into adjacent service areas.This conditi...
Break Down Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
An inspection conducted at La Vista Residence-3 ,identified multiple instances of water ingress affecting key areas including the reception atrium, lift lobby, riser shafts, and lift machine room. The defects are primarily characterized by rainwater leakage, deterioration of plaster and paint finishes, and ceiling s...
Break Down Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Water seepage was identified on the walls of the Management Office at La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates. The issue has resulted in deterioration of internal wall finishes and paint, negatively impacting the aesthetics and condition of the office space. Based on site inspection, the r...
Break Down Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
AT LAVISTA RESIDENCE 1, The inspection of the swimming pool and jacuzzi areas has revealed extensive deterioration of underwater tiles, deck flooring, grouting, and associated systems. Water seepage through damaged tiles and failed grout joints has led to dampness in the pump room walls, while additional issues include a...
Break Down Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The inspection of La Vista Residence-1 has identified multiple instances of rainwater ingress water leakage were identified in the HC Floor lift lobby, riser shafts, and lift machine room. The primary issues include ceiling water ingress, deterioration of wall plaster and finishes, and failure of the roof waterproofing s...
Break Down Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The inspection has identified rainwater leakage at the reception atrium and lower roof access door areas, primarily due to the failure of sealant systems in the sky cladding and ACP cladding interfaces. The deterioration of weatherproofing materials, caused by prolonged exposure to environmental conditions and inadequate join...
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
AT LAVISTA RESIDENCE 2, The inspection of the swimming pool and jacuzzi areas has revealed extensive deterioration of underwater tiles, deck flooring, grouting, and associated systems. Water seepage through damaged tiles and failed grout joints has led to dampness in the pump room walls, while additional issues include a...
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The inspection has identified rainwater leakage at the reception atrium and lower roof access door areas, primarily due to the failure of sealant systems in the sky cladding and ACP cladding interfaces. The deterioration of weatherproofing materials, caused by prolonged exposure to environmental conditions and inadequate join...
Break Down Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The inspection of La Vista Residence-2 has identified multiple instances of rainwater ingress across key areas, including lift lobbies, the gym, residential Unit 813, and the party hall riser wall. The primary causes are attributed to the failure of the rooftop waterproofing system, structural cracks, and inadequate sealing o...
Break Down Mixed Use
Global Green View2, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work Following heavy rainfall, multiple areas across the basement levels, ground floor, and associated structures have been affected by water ingress, resulting in slab cracks, paint deterioration, and safety concerns. This proposal outlines the remedial works required to address all identified defects and restore th...
Break Down Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Facade & Cladding Sealant Replacement with Waterproofing Works – Silicon ArchConduct detailed inspection of damaged sealant at rooftop structural frames (cladding) and façade glass of Unit 901 (internal and external). Identify all leakage points, cracks, and deteriorated joints causing water ingress. Carefully remove ex...
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Leakage of Water after rainfall in BuildingInspection was carried out, and the following observations were made: • Leakage intensity increases after rainfall events.• External ground level adjacent to the affected walls shows water accumulation due to inadequate drainage. • Water ingress is occurring through wall pe...
Break Down Residential
JVC, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Observation  • Water leakage observed during during rainfall.  • Ceiling paint is peeling and surface shows moisture damage.  • Water is dripping from ceiling to the lower floor apartment balcony.  • Leakage occurs only during rain, indicating external source.  • Rooftop inspe...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the routine water tank cleaning, found the inside damages of GRP Tanks two GRP tanksTank size location 1: Tank No.1 is 5 mtr x 5 mtr x 3.5 mtr Tank No.2 is 6 mtr x 5 mtr x 3.5 mtr Tank Size Location 2:Tank No.1 is 5 mtr x 4 mtr x 4 mtr floor Tank No.2 is 5 mtr x 4 mtr x 4 mtrNeed to the empty t...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
water leakages at the site during rainfall (electrical room leakage) Solution for water leak complains  Need to remove old silicon of façade glass and apply new silicon by rope access/cradle. Apply new highquality, weather-resistant silicone sealant to the entire façade glass area to prevent further water ingress.&...