Search Jobs
Proposal for the Landscape rectification work -La Riviera Azure (JB004-25-01878)
Break Down
Residential
La Riviera Azure, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Suply and installation below itemsPetunia FlowerQuantity: 350 pcs
Cycus Plant
Quantity: 1 pc
Damas Plant (60–70 cm)
Quantity: 70 pcsSupply and Installation of Areca Plants (2 to 3 meters)
Quantity: 3 LM
Supply and Installation of Potting Soil
Quantity: 9 LM
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply, Installation, and Configuration of Intercom and Access Control System at B3 lift lobby - 1 NoSupply of Fermax 4+N Audio Skyline Module W Supply of Fermax Mds Skyline Digital Display W Supply of Fermax Bus2/Vds/Mds Skyline Digital Keypad Supply of Fermax Skyline Proximity Reader V Supply of Fermax S...
Break Down
Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and installation of Paspalum grass
Quantity: 70 sqm
Includes 6-month warranty
Supply
Removal and disposal of soil (30 cm depth) and refilling for Paspalum grass
Quantity: 1 unit
Interlock work
Fixing interlock (200mm x 100mm)
Includes proper soil compaction before installation
Quantity: 125 sqm
...
Supply and Installation of No Parking Bollards - Silicon Arch (JB004-25-01874)
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and Installation of No Parking BollardsHeight Above Ground - 15 unit900 mm Total Length (including base/foundation)1200 mmDiameter 100 mmTypeFold-down (with lock)MaterialGalvanized steel Color/MarkingsBright yellow with reflective red tape and "No Parking" signageFixed type: Anchor dire...
Budget Review (01-01-2026 To 31-12-2026) (JB007-25-01688)
Services
Residential
Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Budget ReviewDear Sir/Madam,Greetings from ASTECO,We would like to request for proposal of below service for one of our property Royal Oceanic JOP Located in Dubai Marina. Covering period: (1st January 2026 - 31st December 2026)Budget Review Kindly find below Building Details for your reference.Total :&n...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Expansion Valves1. Switch off the system 2. Refrigerant needs to be removed from the system. 3. The expansion valve needs to be removed. 4. The new expansion valve needs to be fixed, and brazing needs to be done.5. Leakage tests need to be done.6. System vacuuming needs to be done.7...
Services
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Scope of works/ Description: Replacement of Damaged ACP Panels - Building FaçadeWe are inviting your company to submit a proposal for the Replacement of Damaged ACP Panels on the building façade at Crystal Tower, Business Bay.
Please find attached the technical report and scope of works for your reference.
For site...
Break Down
Mixed Use
Spica Residence, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope Of Work:Supply and delivery of Hand made Bollards- 8nosMaterial: MSHeavy DutyLength: 100cmDimeter: 10cmSupply and installation of fence qty 02 nos.Material: MSDimensions:H 121 × L 102 cmH 140 × L 173 cm
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification and refixing of façade copping panel at the roof swimming pool area by rope access - 2 nos.Application of weatherproof silicone sealant at all joints to ensure durability.Final quality check, site cleanup, and submission of completion report.including DMCC Master community permit
Product
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Scope of works/ Description: Supply, Delivery, Installation, Testing
& Commissioning of POWERON 30KVA (GP339E30KTTXL) Transformer-Based UPS with 60 minutes backup @ 15kW
load at the Power factor 0.9 ,including a 5-year’s warranty. Attached the data sheet for reference. Kindly submit the proposal on/bef...
MAG 318 - (3 Year) Cleaning Garbage Chute Contract (JB007-25-01689)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Garbage chute cleaning and maintenance along with compactor for the period 1st January 2026 to 31st December 2028.Please find the related detail as...
MAG 318 - (3 Year) Facade Cleaning (JB007-25-01686)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Façade cleaning for the period 1st January 2026 to 31st December 2028.Please find the related detail as below and attached.Location link: https://g...
MAG 318- (3 Years) Lifeguard Contract (JB007-25-01684)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Lifeguard Services for the period 1st January 2026 to 31st December 2028.Please find the related detail as below and attached.Location link: ...
MAG 318 - (3 Years) Concierge & Bellboy Contract (JB007-25-01682)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Concierge Services and Bellman for the period 1st January 2026 to 31st December 2028. 1. Concierge Supervisor ...
MAG 318 - (3 Years) Security Personnel & Equipment Contract (JB007-25-01680)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Security Services for the period 1st January 2026 to 31st December 2028.Please find the related detail as below and attached.Day:1. ...
MAG 318 - (3 Years) Cleaning Common Area (JB007-25-01679)
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from ASTECO!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for Common Area Cleaning for the period 1st January 2026 to 31st December 2028.Please find the related detail as below and attached.Day:...
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for MEP Services for the period 1st January 2026 to 31st December 2028.Manpower details: -Day: - 1. Multi technician2. Electrical t...
Dress Changing room with Glass and Aluminum frame. (JB007-25-01676)
Product
Residential
Jumeirah Village Circle Dubai, UAE, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dress Changing room 01. Glass frame with almunium
wooden colour glass 10
mm sand blast 160x120 hight 230 front 200
cm
and 2 door also side and top fix glass
SUPPLY AND INSTALLATION OF POOL SHADE (JB007-25-01675)
Services
Residential
Jumeirah Village Circle Dubai, UAE, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
SUPPLY AND INSTALLATION OF POOL SHADE01.Supply & Installation of Kitted HDPE fabric ( Triangle )+ MS Pillar HDPE knitted fabric 340gsm -1No. (35 Sq.M) 02.MS Pillar 6inch. 3.5thickness. 02 NO.03. Direct Concrete foundation. 02 No.04. Epoxy painting GI wire rope wire – Dee shackles, Tread buckle
Services
Residential
Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Installation of Pressure Independent Control Valves (PICVs) on Common Area Fan Coil Units (FCUs)1. Scope Description:This project covers the complete supply, installation, and commissioning of Pressure Independent Control Valves (PICVs) on all common area Fan Coil Units (FCUs) within the Royal Oceanic Tower. The goal is to im...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Building No. 1
Item No.DescriptionBrandQuantity1Heat Detector with BaseSimplex162Monitoring ModuleSimplex 153Control ModuleSimplex104Speaker CeilingSimplex125Speaker Wall MountedSimplex136Programming-17Smoke Detector with BaseSimplex928Loop Rectification-69Fire Resistance Cable 1.5MM (Red)Frontier1 roll10Sm...
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Objective
Replacement of damaged anti-slip strips across Staircase 1 and Staircase 2 to enhance safety and durability.
Material Specification
Type: Stainless Steel Anti-Slip Strips
Length: 104 cm each
Thickness: 6 mm
Adhesive: Heavy-duty, weather-resistant adhesive to ensure long-term bonding and performance
Qua...
Replace existing DG controller (JB004-25-01810)
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope: Replace existing DG controller with PW 2.0 (supply, program, test) and perform full generator servicing including oil/filter change, system flush, battery, radiator, air intake check, and load test. Provide minimum 1-year warranty on controller and workmanship. Submit final commissioning report.Submit final commissioni...
Break Down
Mixed Use
Balqis Residence Palm Jumeirah West Crescent, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Kindly see attached document.
Chiller and HVAC Services (AMC) 2025 (JB2190-25-00085)
Contract
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
The scope of work relates to the maintenance and operation of the primary HVAC system components. The service provider is expected to be knowledgeable and experienced in operating and maintaining similar systems. includes the following activities but not limited to:Semi Comprehensive service agreement for 2 chillers. In...
Supply and delivery of Office chairs - Tamweel Tower (JB004-25-01796)
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Supply and delivery of Swivel chair, Murum black - 2 nos.2. Supply and delivery of Swivel chair, Bomstad black - 8 nos.
Rectification works for Main Entrance door - Spica Residence (JB004-25-01775)
Break Down
Mixed Use
Spica Residence, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Existing 1 nos. door removing, door alignment bottom frame with bottom accessories changing.• Bottom accessories changing• Top side Spintal replacement• Bottom profile brown matching color powder coating
Proposal for Sun Lounger Cushion- Indigo tower (JB004-25-01773)
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Sun Lounger Cushion - 8 NOS.113x55x9 (Length x Width x Thickness) Down cushion72x55x9 (Length x Width x Thickness) Headrest Cushion- Should match with existing Sun Lounger Cushion
Facade (Glass and ACP) Rectification (JB2190-25-00080)
Services
Residential
Lakepoint Tower N2 Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
The scope of
work includes the following activities but not limited to;
Take
necessary approvals from competent authorities, including but not limited to
DMCC and RTA.
1. Façade
Sealant Replacement and Rectification
Issue: Deteriorated weather sealant
across all elevations, leading to potential water leakage.
Scope o...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of workIsolation of the area with signage and barricading.• Protection of the existing assets.• Mobilization of required materials, tools, and equipments.• Debris removal and carting away as per DM regulations.• Removal of the damaged existing structures from the brackets and their disposal.• Sanding and surface pr...
Break Down
Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Replacement of Upright Sprinkler - 1 no.2. Replacement of Voice Evacuation Master Panel; SHX/CW-HMX-MP, 32/P - 1 no.3. Programming of the Panel4. Testing and commissioning
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
The contractor shall undertake the following activities:
a. Site Survey & Dismantling
Conduct a site verification to confirm lamp quantities and access requirements.
Safely remove and dispose of:
62 nos. of 70W metal halide lamps in the lobby ceiling (only 4 working).
20 nos. of 70W metal halide lamp...
Rectification of Fire Alley Gate in TH Area (JB007-25-01308)
Break Down
Residential
The Fairmont North Residences Palm Jumeirah, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from SAGA International.We would like to request for proposal based on the attached material list for the Rectification of Fire Alley Gate in TH Area for our building The Residences North located in Palm Jumeirah.For clarification kindly contact our Site Supervisor: Mr. Abu on (050 458 34...
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Supply &
Replacement of Battery 12V 24AH (Tower B - FACP) – 2 nos.2. Programming for
Labling of the Devices & Reconfiguration of FACP (Tower A - FACP) – 1 no.3. Programming for
Labling of the Devices & Reconfiguration of FACP (Tower B - FACP) – 1 no.4. Supply &
Replacement of Battery 12V...
Services
Residential
Horizon Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Pergola –
Wooden Roof Structure Repair and Replacement of WPC floor
Scope of Work
Inspect, repair, and replace all damaged wooden
components of the pergola structure.
Supply and apply waterproof and weatherproof paint on
the entire wooden structure.
Supply and install IP67-rated LED lights, including
pro...
Tennis Court Construction at D Floor (JB007-25-01146)
Services
Residential
Dubai Gate 1 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
As per attached document.1. Site Preparation: Clearing and leveling the area where the tennis court will be constructed.2. Base Construction: Building the base layer, typically consisting of layers of gravel and/or crushed stone, to provide a stable foundation.3. Drainage: Installing drainage systems to prevent water accumula...
Contract
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Provider, good day. We have requirements for BTU submetering services (reading, billing, maintenance and collection) in West Wharf, Business Bay. You can see the attached scope of works which is drafted as minimum requirement from us. Please go through the same and provide your proposal. Also,...
Rectification of Mechanical Floor Exhaust Fan - Hilliana Tower (JB004-25-01309)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. 7.5 KW Exhaust Fan Motor Servicing:Remove Ducts & Flexible Canvas: Disconnect and remove the ducts and flexible canvas.Dismantle Motor & Fan Blade: Take apart the motor and fan blades.Replace Bearings (SKF): Replace DE/NDE bearings with SKF bearings.Motor Machining & Servicing: Machine motor cover, make sleeve,...
Product
Residential
Jumeirah Village Circle Dubai, UAE, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Supply and installation EXIT Silhouette ground sports trampoline -1 No.Size: ø 366 cmColourBlackBrandEXIT TOYSMaterialMetalPad typeSafety PadShapeRoundTechnical DetailsColorBlackSizeø 366 cmFrame MaterialAlloy SteelLength366 centimetersShapeRoundMaterial TypeMetalNumber of Items1Number of Pieces1Batteries Include...
Break Down
Residential
Dragon Views, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation, and implementation of Everlux Emergency Evacuation Plans, using photoluminescent materials. The project aims to enhance emergency preparedness and ensure compliance with safety regulations.
Supply high-quality Everlux Emergency Evacuation Plans (400x300 mm), Qty 18 numbers.
Ensure proper installation and p...
Earth pit rectification works (JB007-25-00682)
Services
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer the attachments
West Wharf - Installation of EV Charging station in Basement 1 (JB007-25-00737)
Enhancement
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,We are the building management team of West Wharf Tower, located in Business Bay, and we would like to invite your esteemed company to submit a proposal for the installation of EV Charging Station in Basement 1.Please submit your proposal through ISKAAN with your best price for our review and approval. ...
West Wharf - Supply and installation of Calorifier-3 (JB007-25-00405)
Services
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Quantity: 1 no.Capacity: 900 Gal.Scope of Work:• Protect work area with proper barricading.• Drain the existing Calorifier and remove the insulation.• Isolate the power source and remove all the cables.• Dismantling of existing system (calorifier-3).• Preparation of platform• Supply and installation of new tank (Material-Stai...
Facade Glass Leakage Rectification Work - Al Shera Tower (JB004-25-00737)
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Facade Glass Leakage Rectification Work - Entire Building (All Elevations)· Protect the proposed working
area with proper
barricading.
· Cutting and removal of existing sealant.
·
Cleaning, removing all dus...
Services
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Provider,Greetings!We would like to request proposals based on the attached technical report with scope of works for our building, Crystal Tower, located in Business Bay, Dubai.Kindly contact our FM site maintenance, Mr. Najeeb, on (056 344 3667) if you need any clarification and assistance.Please submi...
Services
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Provider,Greetings!We would like to request proposals based on the attached technical report with scope of works for our building, Crystal Tower, located in Business Bay, Dubai.Kindly contact our FM site maintenance, Mr. Najeeb, on (056 344 3667) if you need any clarification and assistance.Please submi...
Services
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Provider,Greetings!We would like to request proposals based on the attached technical report with scope of works for our building, Crystal Tower, located in Business Bay, Dubai.Kindly contact our FM site maintenance, Mr. Najeeb, on (056 344 3667) if you need any clarification and assistance.Please submi...
Repair works - Cooling Tower #2 & #3 (JB007-24-03183)
Services
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer attachments.
Enhancement
Commercial
Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
SCOPE OF WORK• Conduct a site survey to assess the basement environment.• Propose the required diesel pump specifications (capacity, model, manufacturer).• Confirm compliance with local regulations and codes (fire safety, building codes, etc.).• Install one diesel pump equivalent to one of the existing ele...
Enhancement
Commercial
Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please find below Scope of Work:• Supply and installation of aluminum and acrylic signage including brackets (Dimensions/design will be provided by contractor as per standard).• Signage should have LED lights.• Power cabling from DB to signage.• High level scaffolding to be provided by contractor.• An...