Boundary Wall Rectification & Repainting – Bermuda Views (JB004-26-03824)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Boundary Wall Rectification & Repainting
The external boundary wall has peeling, faded and discoloured paint along with visible surface cracks and deterioration. Rectification and repainting are required over an approximate area of 450 SQM to restore the wall finish and protection.
Scope of Work
Inspect the complet...
Removal & Replacement Of Signage Board- Hilliana Tower (JB004-26-03821)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The purpose of this project is to remove and replace the existing ABYAAR signage board located at the top level (29th Floor) of the building with a new HILLIANA Tower signage board incorporating LED illumination.Based on the preliminary assessment, the proposed signage system shall be designed and installed to provide a durab...
Rectification Of Epoxy Paint - Lakeside Residence (JB004-26-03819)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Based on the condition survey report and routine inspection findings, the existing epoxy floor coating at the basement parking levels B1, B2, and B3, as well as the ground floor garbage room, has deteriorated, with visible damage to the floor paint, parking slot markings, road lines, and directional arrow markings.
The propo...
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Ground Floor Reception Marble Crystallization Polishing
Scope of Work:
Carry out marble crystallization polishing for the Ground Floor reception flooring.
Restore the shine and appearance of the existing marble floor tiles.
Reception flooring area: Approximately 220 square meters.
Required service: Marble Crys...
Supply and Installation of Shade at Roof open area - Pantheon (JB004-26-03733)
Break Down
Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Installation of Sail-Type Shade at Rooftop
Project: Pantheon Boulevard – JVC
Location: Rooftop / Area Adjacent to Kids’ Play Area
Shade Area: 65 m²
1. General Scope
The contractor shall supply, fabricate, deliver and install a complete sail-type shade structure of approximately 65 m² at t...
Roof Waterproofing Rectification – La Vista Residence 2 (JB004-26-03650)
Break Down
Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The existing rooftop waterproofing system has deteriorated, with cracks observed in the roof slab/floor finish and inadequate sealing around service penetrations and drainage points. The affected waterproofing shall be removed and replaced to prevent further rainwater ingress. The reported waterproofing area is approximately ...
VH-Supply and replace damaged road reflectors (CAT EYE) near speed hump (JB11521-26-00859)
Break Down
Residential
Ground Floor ‑ G07, Canal Residence West (European Building), Dubai Sports City, Dubai, United Arab Emirates
Posted By: Sports City Owners Association Management Services
VH-Supply and replace damaged road reflectors (CAT EYE) near speed hump-35nos
Supply and replace damaged road reflector (Cat eye) using Epoxy anker adhesive -soudafix VE400-SF
Parking Slot Modification – Hilliana Tower (JB004-26-03207)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Barricade the work area and provide necessary safety signage during execution.
Remove or cover the existing parking-slot markings and clean the complete surface.
Repair minor cracks, uneven surfaces, or damaged areas before painting.
Prepare the parking surface by grinding, cleaning, and removing dust, oil...
Replacement of Damaged Wallpaper at Gym (JB004-26-03054)
Break Down
Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Wallpaper at Gym
New wallpaper needs to be installed from the bottom up to a height of 1 meter.
Preferred Colour- Black
Size- Height x Lenth- 1 meter x 30 meters.
Kindly visit the site for scope and quantity
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation of 60×60 cm Ceiling Access Trap Doors
Background
As per the RERA findings, six (6) smoke detectors need to be installed above the ceiling on the 39th Floor. Based on the inspection carried out by the Inaya technician and AMITIDAAD recommendations, ceiling access trap doors are required to facilita...
Rectification of RCC Watertank Waterproofing-LSR (JB004-26-02980)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the scheduled cleaning of the Basement-3 and Rooftop water tanks, an internal visual inspection was carried out to assess the condition of the tank interiors. The inspection revealed that the existing waterproofing coating on the internal reinforced cement concrete (RCC) surfaces had significantly deteriorated due to a...
Replacement of Damage Tile Divider Aluminium Plate-LSR (JB004-26-02979)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A site inspection was conducted at the external ground floor building entrance following the identification of a damaged 75 mm aluminum tile divider plate strip. The inspection confirmed that the existing strip had deteriorated due to prolonged wear and exposure to external environmental conditions. As a result, the strip was...
Replacement Of Defective (FCU) Motor and Blower-LSR (JB004-26-02978)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the building inspection, it was observed that the Fan Coil Unit (FCU) serving the 7th floor staircase is not operational. A detailed assessment confirmed that both the FCU motor and blower assembly are defective and have failed, preventing the unit from providing the required ventilation and cooling to the staircase ar...
Cleaning & Removal Of Oil Stain Parking Area Road-LSR (JB004-26-02977)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, an oil stain was observed on the parking area road adjacent to the tower. Based on site observations, the contamination appears to have resulted from oil leakage from a garbage collection vehicle operating within the community. The presence of oil on the road surface creates an unsightly appearance...
Rectification Of External Wall Tile - LSR (JB004-26-02976)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the DMCC inspection of the tower's external façade near Supermarket, it was observed that several external wall tiles are inadequately bonded to the substrate. A number of tiles were found to be loose, misaligned, and partially detached, creating a potential safety hazard due to the risk of tile dislodg...
Rectification Of Wall Plaster-LV1 (JB004-26-02975)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
AT LAVISTA RESIDENCE 1 Dubai Silicon Oasis,
During the site inspection at La Vista Residence-1, Dubai Silicon Oasis, it was observed that the plaster on the ground floor boundary wall and columns has deteriorated, with visible cracks and damaged sections. These defects have adversely affected the overall app...
Installation of Bird Net At Parking - LV1 (JB004-26-02974)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection at La Vista Residence-1, Dubai Silicon Oasis, it was observed that birds are frequently perching on exposed plumbing lines, firefighting pipelines, and cable trays within the parking area. As a result, bird droppings are accumulating on parked vehicles and surrounding floor surfaces, creating unhygi...
Replacement of Dust Bins - Riviera Dreams (JB004-26-02973)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, it was observed that the existing dust bins in the designated smoking areas are old, plastic, and unsuitable for their intended use. The current bins do not meet the required standards for durability, fire safety, or building aesthetics, resulting in a poor visual appearance and reduced functionali...
Rectification Of Damaged External (ACP) Cladding -Bermuda Views (JB004-26-02963)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, multiple areas of damage were identified in the building's external Aluminium Composite Panel (ACP) cladding, particularly at the rooftop and ground floor levels. Several ACP panels were found to be damaged, with some appearing loose or inadequately secured, presenting a potential safety risk t...
Rectification of Epoxy Floor Coating Parking Area-Bermuda Views (JB004-26-02962)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
An inspection of the parking areas extending from the Ground Floor to Basement 2 identified significant deterioration of the existing epoxy floor coating, painted traffic markings, and associated parking accessories due to continuous vehicular traffic, environmental exposure, and normal operational wear. The epoxy coating has...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection of the garbage room, several maintenance deficiencies were identified that require immediate rectification. The wall tiles were found to be loose, popped up, and damaged at multiple locations, posing potential safety and maintenance concerns. Additionally, the ceiling paint has deteriorated and requ...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, multiple deficiencies were identified in the rooftop Fresh Air Handling Units (FAHU-1 to FAHU-6), affecting both the mechanical and electrical systems. The observed defects include extensive corrosion and deterioration of FAHU casings, damaged heat recovery components, defective pressure and temper...
Repair & Replacement Of Damage Marble-Bermuda Views (JB004-26-02922)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, multiple defects were observed in the entrance boundary wall tile cladding and ramp marble finishes. Several wall tiles were found to be loose, detached, cracked, chipped, and damaged, with evidence of adhesive failure in various locations. In addition, the cement grout between tiles has deteriorat...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Damaged Garbage Room Wall Tiles and Ground Floor Ceiling Repainting
Scope of Work
Remove the damaged wall tiles from the garbage rooms at the Ground Floor, 6th Floor, 8th Floor, 9th Floor, 11th Floor, and 13th Floor.
Supply and install new wall tiles matching the existing finish.
Replace approxima...
Installation of Fire Evacuation Plans - Dragon views (JB004-26-02899)
Break Down
Residential
Dragon Views, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, it was observed that approved evacuation plans were not displayed on the Ground Floor, Podium (where applicable), or any upper floors of the building. No floor evacuation diagrams indicating emergency escape routes, emergency exits, firefighting equipment, assembly point. The absence of evacua...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of Loose Concrete on Upper Exterior Façade and Concrete Spalling Repair
Scope of Work
Inspect the upper exterior façade, including the area above location 404 (4th Floor), to identify all loose and damaged concrete.
Remove all loose and deteriorated concrete from the affected fa&c...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and Installation of Sail Fabric Shade for Kids Play Area
Scope of Work
Supply and install a sail fabric shade for the kids' play area with an approximate coverage of 60 sq. m.
Provide and install the complete supporting structure, including support poles and all required accessories.
Carry out all ne...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Leakage Rectification of Waste Pipe Inside Enclosed Plumbing Riser and Ceiling Reinstatement at Podium Lift Lobby
Scope of Work
Provide access to the enclosed plumbing riser through the master room bathrooms of series apartments.
Demolish the riser wall at 3 to 4 locations to identify the exact leakage poi...
Damaged Floor Area at the Vehicle Ramp (JB004-26-02806)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Damaged Floor Area at the Vehicle Ramp
• The concrete floor surface is severely damaged with visible cracks, spalling, broken concrete, and surface deterioration.
• The damaged area is located on the vehicle movement path, where continuous traffic has accelerated the deterioration.
• Loose concrete fra...
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The Contractor shall undertake the complete refurbishment and rectification of the existing adult swimming pool, children's swimming pool, jacuzzi, overflow channels, pool deck and associated staircases, including demolition, concrete surface preparation, waterproofing, screeding, tiling, protective coatings, testing, com...
Corridor Wall Crack Repair and Repainting Works - The Pinnacle (JB004-26-02568)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Corridor Wall Crack Repair and Repainting Works
Scope of Work:
Apply a suitable plaster repair compound to fill the cracks.
Clean the entire wall surface to remove dirt, grime, and old paint.
Supply and apply two coats of high-quality, water-based paint matching the original colour and finish.
Carry out the rep...
Staircase Epoxy Floor Repair and Recoating Work - The Pinnacle (JB004-26-02567)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Staircase Epoxy Floor Repair and Recoating Works
Scope of Work:
Grind or scrape away the damaged epoxy coating to expose the underlying surface.
Clean and prepare the surface for new epoxy application.
Apply a new layer of epoxy paint matching the original color and finish.
Apply a clear sealant to protect the ...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Repair of Loose and Cracked Concrete at Exterior Wall Above Apartment 404 (4th Floor)
Scope of Work
Carry out inspection of the loose concrete section at the exterior wall above Apartment 404 (4th Floor).
Remove all loose and damaged concrete from the affected area.
Repair the existing cracks in the concrete sur...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Cutting of Gypsum & Decorative Ceiling and Installation of Access Panel for Gym Room & Gym Lobby AC Unit
Scope of Work
Cutting of the existing gypsum ceiling to create access for the Gym Room & Gym Lobby AC unit.
Cutting and modification of the existing round decorative sheet ceiling at the Gym Lobby ...
Supply & Install Warning Signboards - lakeside residence (JB004-26-02411)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During a routine site inspection, it was observed that the existing danger warning sign board installed on the DEWA substation door has significantly deteriorated due to prolonged exposure to weather conditions and environmental factors. As a result, the warning text, safety symbols, and hazard indications have faded and are ...
supply and installation wall protection panel - RD (JB004-26-02283)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, it was observed that the garbage room walls have sustained scratches, dents, and staining due to frequent contact with garbage bins and cleaning equipment. The absence of wall protection panels and corner guards has left the wall surfaces exposed to continuous impact, affecting the cleanliness, hyg...
supply and installation of PVC wall panel - LV3 (JB004-26-02261)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location: La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
The party hall facility is experiencing recurring wall surface damage, including paint peeling, scratches, dents, and minor cracks. These damages are primarily caused during the installation and removal of decorative backdrops for events. The on...
replacement of damage floor tiles-LV3 (JB004-26-02260)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location: La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
A detailed inspection of the lift lobby areas from the Ground Floor (GF) to the Health Club (HC) Floor identified extensive damage to both floor and wall tiles. The observed defects include cracked, broken, hollow, loose, chipped, and uneven til...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Conduct a detailed leakage investigation to identify the exact source of water ingress affecting Parking #48.
Perform non-destructive testing and utilize specialized leak detection equipment where required.
Inspect the poolside area, waterproofing system, slab structure, and associated building elem...
replacement of damage marble step-LV3 (JB004-26-02212)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The existing marble finish on the reception back-side entrance steps at La Vista Residence-3, Dubai Silicon Oasis, has sustained damage including chipping, cracking, and edge deterioration due to prolonged pedestrian traffic, material aging, and possible water ingress. The damaged condition negatively impacts the visual appea...
Supply & Installation of Aluminum Ceiling Panels (JB004-26-01991)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The work shall be carried out in accordance with approved standards, site conditions.1. Site Inspection and Preperation Conduct complete site inspection and verification of dimensions before commencement of work.Protect existing gym equipment, walls, flooring, and adjacent finishes during execution.Arrange all necessary tools...
Supply & Replacement of Skirting (JB004-26-01990)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Site Inspection and Preperation Conduct complete site inspection and verification of dimensions before commencement of work.Protect existing gym equipment, walls, flooring, and adjacent finishes during execution.Arrange all necessary tools, manpower, transportation, and safety equipment.Barricade working area and ensure sa...
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Basement Ceiling Leakage Rectification, PU Injection Grouting & Ground Floor Flooring Restoration• Inspect and mark all leakage points, cracks and damp area on basement ceiling. • Remove loose plaster, paint and weak concrete form affected areas. • Drill cracks and install PU injection packers for grouting. ...
Replacement of Corroded Drainage Manhole Cover – Spirit Tower (JB004-26-01573)
Break Down
Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Corroded Drainage Manhole Cover – Rear Entrance Ramp, Spirit Tower
Conduct site inspection of the drainage manhole cover located at the rear entrance ramp area.
Assess dimensions, load requirements, and surrounding frame condition.
Carefully remove the existing damaged and corroded manhole cover.
Dispos...
Proposal for the enclosing of Garbage chute duct (JB004-26-01542)
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
An inspection of the ATLANTIC TOWER identified a damaged and partially open wall, exposing the internal service space. The opening reveals a garbage chute duct along with associated services, which are currently not properly enclosed. Additionally, the surrounding wall/gypsum finishing is broken and incomplete.
This condition...
Break Down
Mixed Use
Global Green View2, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Short Summary
A detailed assessment from the 1st to the 10th floor, including the staircase area, has identified recurring water seepage marks, ceiling cracks, and improper wall tile grouting. The seepage is likely due to plumbing leaks, defective waterproofing, or facade-related issues. Ceiling cracks appear systematic and m...
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & replacement of facade glass size: 134 cm x 89 cm(approximate), thickness 24 mm
Supply & Replacement of Reception Wallpaper - GCV (JB004-26-00633)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replace the signage wallpaper with existing design.