Search Jobs
AMC
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Service Frequency
External Glass Cleaning (Normal Wash): Three (2x) per year
Cleaning Method
Rope Access method in accordance with IRATA procedures.
Works to comply with Dubai Municipality and UAE Civil Defense safety regulations.
Consumables
PPM consumables included.
Only eco-friendly,...
Façade Glass Joint Sealant Replacement - Silicon Arch (JB004-26-03723)
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Façade Glass Joint Sealant Replacement
Scope of Work:
Inspect all damaged sealant on the external façade glass of Location 221 & 812.
Replace the damaged sealant on the façade glass – Total Area: 25 SQM.
Remove all damaged sealant without damaging the existing glass and fr...
(12 Months) Facade Cleaning Contract (JB11484-26-00123)
AMC
Residential
Meydan Avenue, Dubai, United Arab Emirates
Posted By: SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
Flamingo Lux Residence
G + 4F
Area 66,000 sqft
Contract Duration - 01-01-2027 to 31-12-2027
Note
Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may send a site visit request as response to this RFP or by sending an email to jopm@skyli...
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Facade Glass Leakage Rectification Work – Entire Building (All Elevations)
Scope of Work
Protect the proposed working area with proper barricading.
Remove the existing damaged silicone sealant from façade glass joints.
Clean the joint surfaces and remove all dust particles before application of new ...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of workTotal ACP Panel Qty: - 05Nos.• Fabrication, supply and installation of a new aluminum internal structure/frame with adequate support and proper alignment • Supply and installation of new fire-rated ACP panel with proper alignment.• Qty: - 02 Nos (Red marked).• Refix the removed adjacent loosen...