Search Jobs
CHW (Chilled Water) Pipeline Replacement (JB2190-25-00079)
Services
Mixed Use
Jumeirah Lake Towers, Cluster T, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
The scope of work includes the following activities but not
limited to;
Replacement
of CHW Pipelines at the Following Locations:
Ground Floor – Installation of MS pipes:
10 meter (4inches)
12 Meters (3 inches)
12 meters (1 inch)
7th Floor – Installation of MS pipes:
16 meters (3 inches)
10 meters (2 inche...