Search Jobs

Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Building Aircraft warning Lights are not working.Need to be replace/repair existing aircraft warning light system Suggestion ➢ Solar powered LED Aircraft warning light installing in designed area (as per approved specialist advice) Benefit of Solar powered LED ➢ light will be operating automatically, required less m...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 The GYM is equipped with two AC units installed above the ceiling.  Upon investigation, the following factors were identified as affecting the cooling efficiency:   High Ceiling: The increased height between the GYM ceiling and roof ceiling reduces the effectiveness of conditioned air circulation, causing uneven ...
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM InstallationA. Supply & installation of Butterfly valve with necessaryflanges & fittings accessories.B. Carryout installation of PRV with accessories.C. Carryout necessary PPR works. - 2 Nos
Break Down Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of workTotal ACP Panel Qty: - 05Nos.• Fabrication, supply and installation of a new aluminum internal structure/frame with adequate support and proper alignment • Supply and installation of new fire-rated ACP panel with proper alignment.• Qty: - 02 Nos (Red marked).• Refix the removed adjacent loosen...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
FCU Controller – Honeywell W7754 - 2 Nos.Power Supply : 230 Vac +10%, -15%, 50/60 HzHardware Design : Processor: Neuron 3150® running at 5 MHz, with 2 kBof RAM and 0.5 kB of EEPROM on chip.Ext. memory: EPROM, 64 kB by 8.Specified Sensing Temperature Range : 32° to 104°F (0° to 40°C)Environmental Ratings : Operating temperatur...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of balcony glass of size of the broken glass is approximately 1300 mm x 1000 mm.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & replacement of facade glass size: 134 cm x 89 cm(approximate), thickness 24 mm
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of Chemical Dosing System for Swimming Pool
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Sump Pump Set No.1Make: ABSModel No: AFP0630S22/4DCapacity :2.2 KWLocation: Basement 3Problems: Both Pumps chain damaged, Body rusted,01 float switch and 01 pump control defective, Motor need servicingSump Pump Set No.2Make: ABSModel No: AFP0630S22/4DCapacity :2.2 KWLocation: Basement 3Problems: Both Pumps chain damaged,...
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replace the signage wallpaper with existing design.
Break Down Mixed Use
Kg tower, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Garbage BinsBrand- Cosmo Plast Garbage Bins-4 nos 2.5 cbm Material: Hot-dip galvanized steelBase: Reinforced with drainage holesWheels: Heavy-duty, rust-resistant casters with locking mechanism.Lid Hinges: Stainless steel hinges for durability.Capacity: Match existing.
Break Down Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work PRV 2inch - 382mFO-SP-50-FL/FL-50/50 PN16 EPDM Installation. Supply & installation of Butterfly valve with necessary flanges & fittings accessories. Carryout installation of PRV with accessories. Carryout necessary PPR works. – 2 Nos  
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and delivery of Printer 
Break Down Mixed Use
Kg tower, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1 FACP Battery 12V ,12AH 2Nos.2 Addressable Smoke Detector with Base-GST 15Nos.3 Addressable Heat Detector with Base-GST 15Nos.4 Addressable Smoke with Sounder Base 18Nos.5 Manual Call Point 1No.6 Breeching Inlet Door Glass Rectification 1No.7 1" PRV 4Nos.8 Fire Hose Reel Nozzle 1No.9 Fire Hose Reel WM-Normal 1No.10 Fire Hose...
Break Down Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The External Signage board 2 Nos required painting and lights of the signage board BOH need to be fixed.Scope of WorkSupply and installation of front-light 3D aluminum letters, including rainprooftransformer.* LED used: SamsungWall preparation and painting work* Remove old paint* Sanding and primer application* New paint usin...
Break Down Residential
La Riviera Estate, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Main Pool Filter Pump 1 - Astral - 3HP - 1 noMain Pool Filter Pump 2- Astral - 3HP - 1 noFountain Pump full service - 1noJacuzzi Booster Pump full service   - 1 NoJacuzzi Multi Port Valve - Astral Pool - 1.5 inch - 1noJacuzzi Switch replacement - 1 no2 year warranty for Pump, 1 year workmans...
Break Down Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of WorK:Supply & Installation of Followings: Gym, Sauna & Steam Maintenance - Male Gym1 CABLE ASSY FOR GYM EQUIPMENTReplacement of Cable Assembly for Life Fitness Bicep Curl -4mm 6 Meter 2LATHE WORKLathe Work for Life Fitness Bicep Curl - Bicep Section (AdditionalPulley) 1 Nos 3&nbs...
Break Down Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Supply & Installation of Followings:Main Pool Filter Pump 1Pool UnionFilter Pump 2Filter Pump 3Filter Pump 2 & 3 Installation and Allied MEP WorksMain Pool UW LED LightKids Pool UW LED LightMain Pool Balance Tank Float Valve
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply& replacement of cracked rubber flexible joint (6”) Rectify pressure vessel line from booster pump discharge header with Saddle tee (6” x 2”) and accessoriesPressurize the line and do leak testTesting of line after commisioning.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
 Need to empty the water tanks at 31st floor Rectify the leak by replacing of 8” PVC tank connector, 8” PVC Elbow,8” PVC Socket, 8” PVC Stub flange adaptor Replace the 8” Butterfly Valve with same model  Open the water supply, leak test and commissioning.
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply & Replacement of facade glass Size as per the existing and colour 8th floor and 16th floor Façade glassAll permit included
Break Down Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Cut the Gypsum and wood ceiling for FCU access - 1 noReplace the FCU Restore the ceiling as beforethe FCU details are attached in attachment 
Break Down Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:Power socket damaged due to wear and tear. Power socket need to be replaced.Up Limit switch damaged due to electriacal failure and wear and tear. Limit switch need to be replaced.Pressure Roller damaged due to usage, wear and tear. Need to be replacedRope Guide damaged due to usage, wear and tear. Need to be rep...
Break Down Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
System Isolation and Preparation Isolate and depressurize the affected section of the pipeline system in accordance with site safety and operational procedures. Verify zero pressure before commencement of dismantling. Dismantling and Removal Remove existing 6-inch and 4-inch copper pipelines from the pump header con...
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work – Hot Water Leak Rectification Replacement of faulty gate valve and associated pipes in front of Apartment 1005. Replacement of faulty PPR pipe, gate valve, and fittings, including ceiling repair and painting, in front of Apartment 609. Replacement of PPR pipe and fittings in front of Apartment 209. Apar...
Break Down Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work Supply & installation of: Heavy Duty water immersion heater as per enquiry. Rating – 203V – 3000 watts. Sheath – stainless steel seamless 316L grade tube fitting with 1/14” BSP Threaded adapter. Thermostat sump type will be provided along with terminal protection cover. Selector switch for circular pu...
Break Down Residential
The Spirit, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work: REPLACEMENT OF ELEVATOR#1 BRAKE COIL UNIT
Break Down Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:1. Fire Protection System – FM200 (Shield System) The contractor shall carry out the following works: Supply and install safety covers for all FM200 manual release switches. Refill HFC227EA gas in the FM200 system cylinders (45 kg capacity). Replace faulty 3” impulse valve discs. Perform complete testing...