Search Jobs
Sewage Main Line Blockage & Pipe Support Damage – Basement 02 (JB004-26-02202)
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The following problems have been identified:
The sewage main line is blocked, and sewage water is not flowing to the grease trap.
Sewage water is overflowing onto the floor.
Floor water is draining into the manhole, which was opened to control the overflow.
Inside the sewage room, all pipeline supports are in damaged co...
AMC For Sewage Tank Cleaning, 2027-2029 (JB6873-26-00104)
Contract
Mixed Use
Cluster E , Jumeirah Lakes Towers , Dubai, United Arab Emirates
Posted By: SABA PROPERTY MANAGEMENT FZCO
AMC For Sewage Tank Cleaning,
2027-2029
SABA 1 Tower: Commercial Building 36 floors of 177 offices and 10 retail
shops
Location: Cluster
E, JLT
Scope
of Work: Sewage Tank (10,000 USG)
PPM
Frequency: 3x a year
Contract
Period: 1 January 2027 – 31 December 2029
Submission Requirements
Includ...
Proposal for B2 – WTP Room Frequent Sewage Pump Blockage (JB004-26-00948)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SummaryThe sewage transfer system (Tank capacity: 4 × 4 × 8 = 128 m³) is facing frequent blockages due to disposable tissues, garments, fabric waste, and inadequate filtration. These materials obstruct the delivery line, causing sewage overflow, health and environmental risks, increased maintenance costs, and potential motor ...