Supply & Installation of D Floor Drain Tray, Damaged Duct Repair, Pipe Support Fixing, and Cladding Work
Services
Posted On:
June 21, 2025
Closing On:
July 7, 2025
JOB REFERENCE:
JB007-25-02371
Scope of work: Supply & Installation of D Floor Drain Tray, Damaged Duct Repair,
Pipe Support Fixing, and Cladding Work
General:
The purpose of this contract is the Supply and installation of D floor Drain tray
& Damaged duct repairing and damaged pipe line support and duct support fixing and
damaged duct area cladding fixing work. And New drain tray supply and installation.
❖ Project name : Dubai Gate 1
Project location: Cluster Q, JLT :D floor
Services:
1. Damaged Duct Repair Works:
o Inspection and repair of damaged duct sections on D Floor.
o Replacement or reinforcement of damaged duct areas as required, including breaking
the wall around the damaged duct for repair and properly reinstating the wall after
completion."
2. Damaged Pipeline Support Fixing:
o Identification of damaged or missing pipe supports.
o Supply and installation of appropriate supports to restore pipeline integrity.
3. Duct Support Fixing:
o Installation or replacement of damaged/missing duct supports to ensure proper
alignment and stability.
4. Cladding Work on Damaged Duct Areas:
o Supply and fixing of insulation cladding on repaired duct sections to restore thermal
protection and appearance.
5. New Drain Tray Supply and Installation:
o Fabrication/supply of a new drain tray as per site requirements.
o Proper installation with necessary drainage connections and supports.
Note: All works will be carried out in compliance with safety standards and quality guidelines.
E. Finishing and Cleanup:
• Clean the work area upon completion.
• Remove all leftover materials and waste from the site.
• Conduct a final inspection with the client or representative to ensure satisfaction and
compliance.
4. Safety Measures:
• Follow all applicable health and safety guidelines.
• Ensure proper use of PPE and tools by the installation team.
• Obtain necessary work permits and approvals from relevant authorities for delivery
and storage.
❖ Warranty and support: The supplier must provide warranty.
Billing of Quantity (BOQ)
SL.NO Description Qty Unit Prize Total
1
Supply and installation of D
floor Drain tray & Damaged
duct repairing and
damaged pipe line support
and duct support fixing and
damaged duct area
cladding fixing work. And
New drain tray supply and
installation.
1
2
All work relevant pre-schedule documents like Work Method statement, Risk Assessment, valid supporting
documents, insurance documents etc., to be provided for necessary approval from client appointed FM
service provider/safety officer.
All certified PPE’s and safety aspects to be followed strictly
Terms & Condition
As per standards
Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW

SAGA International Owner Association Management Services LLC
Dubai Gate 1 Jointly Owned Property
ResidentialDubai Gate 1 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates