Supply and Replacement of Smart LED lights 18W Radar Sensor for Corridors, Lift Lobbies and garbage rooms

Services
Posted On: June 24, 2022
Closing On: July 1, 2022
JOB REFERENCE:
JB007-22-01516
Scope of work: Supply and Replacement of Smart LED lights 18W Radar Sensor for Corridors, Lift Lobbies and garbage rooms.
  • Supply of LED Down Lights radar sensor as per below BOQ and attached sample pictures.
  • Removal of Existing lights and Fittings.
  • Installation of LED Down Lights with required fittings
  • Testing of replaced New LED Down Lights radar sensor.
Corridor – Lift Lobbies8” inch LED Down light (Radar Sensor) STL-T1S8-20W Input Voltage: AC 110-240V 50-60Hz Power: 20W Power Factor: 0.5 CCT: 3000K |Warm White CRI: >80Ra Initial Lumens: 1800LM Sensor Type: Radar Sensor | 3-4 meter Dimension: ø220*55 Cut-out Dia: ø200mm Beam Angle: 110° Material: Die-cast Aluminium + PC Diffuser LED Lifespan: 50,000 Hours - 1500 nos

Garbage rooms- 6” inch LED Down light (Radar Sensor) STL-T1S6-20W Input Voltage: AC 110-240V 50-60Hz Power: 20W Power Factor: 0.5 CCT: 3000K |Warm White CRI: >80Ra Initial Lumens: 1800LM Sensor Type: Radar Sensor | 3-4 meter Dimension: ø190*55 Cut-out Dia: ø160mm Beam Angle: 110° Material: Die-cast
Aluminium + PC Diffuser LED Lifespan: 50,000 Hours - 80 nos.

  • Installation, Service, Removing Existing Lights and Fixing the new ones from Gypsum Ceilings
Refer BOQ.
Sample should be submitted on site subject to approval.
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 

3 years.
APPLY NOW
SAGA International
SAGA International
Sulafa Tower Jointly Owned Property
Sulafa Tower Jointly Owned Property
Mixed Use

Sulafa Tower Dubai Marina, Dubai, United Arab Emirates

Share