Search Jobs
Break Down
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Cause & Effect Matrix Updating and Delay Programming for Fire Alarm System – Shield Triga 12 Loop PanelReview the existing Cause & Effect Matrix configuration of the Fire Alarm System.
Update and reprogram the Cause & Effect Matrix for floor-wise operation.
Configure required delay settings for fire alarm activa...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Proposal for Supply and Installation of Clean Agent Fire Suppression System at Rooftop and 10th Floor Lift Machine Rooms
Background
As per the DMCC snag report, the rooftop and 10th floor lift machine rooms currently have no fire suppression system installed. Both rooms house lift control panels and electrical distribution b...
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
SNItem DescriptionUOMQty.1Universal Mount Emergency Exit Luminaire, LED, 5.2W, IP64, TUV Approved, Model: X10UH - ShieldPCS2602Corridor Illumination Recessed Mount Emergency Luminaire, LED, 4.6W, IP20, TUV Approved, Model: M20CRH - ShieldPCS2203Universal Mount Exit Luminaire, LED, 3.2W, IP54, TUV Approved, Model: X70UL - Shie...
Proposal for supply and replacement of Fire alarm equipment (JB004-26-01473)
Break Down
Residential
Plazzo Residence, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A routine inspection of the Fire Alarm and Fire Fighting System at Plazzo Residence identified several faulty devices and components requiring repair or replacement. The deficiencies observed affect both detection and firefighting systems, impacting overall safety and operational reliability.
Key findings include:
Faulty he...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Emergency / Exit LightsRectification of:Central Battery Panel with TFT Controller & RIF 5 Module – Qty: 1 NosBattery Charger 7.0A – Qty: 1 NosCircuit Change-over Device 4x2A (Addressable) – Qty: 9 NosBlind Plates for CPS 20 + 64 Panels – Qty: 7 NosNeozed Fuse Terminals with Fuse for CPUS Substations – Qty: 1 NosLSA-8.1, S...
Services
Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
All Active and Passive Fire & Life Safety Systems Across the Building.Objective;To conduct a detailed and independent audit of all fire and life safety systems at Maria Tower to evaluate operational condition, verify compliance with Dubai Civil Defense and UAE Fire & Life Safety Code requirements, identify deficiencie...
Proposal for the fire protection system- KG Tower (JB004-26-00538)
Break Down
Mixed Use
Kg tower, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1 FACP Battery 12V ,12AH 2Nos.2 Addressable Smoke Detector with Base-GST 15Nos.3 Addressable Heat Detector with Base-GST 15Nos.4 Addressable Smoke with Sounder Base 18Nos.5 Manual Call Point 1No.6 Breeching Inlet Door Glass Rectification 1No.7 1" PRV 4Nos.8 Fire Hose Reel Nozzle 1No.9 Fire Hose Reel WM-Normal 1No.10 Fire Hose...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
System Isolation and Preparation
Isolate and depressurize the affected section of the pipeline system in accordance with site safety and operational procedures.
Verify zero pressure before commencement of dismantling.
Dismantling and Removal
Remove existing 6-inch and 4-inch copper pipelines from the pump header con...
Fire Protection Systems Rectification (JB004-25-04237)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:1. Fire Protection System – FM200 (Shield System)
The contractor shall carry out the following works:
Supply and install safety covers for all FM200 manual release switches.
Refill HFC227EA gas in the FM200 system cylinders (45 kg capacity).
Replace faulty 3” impulse valve discs.
Perform complete testing...