Supply and Replacement Chilled Water Insulation in Lift Corridor Area

Services
Posted On: July 15, 2022
Closing On: August 15, 2022
JOB REFERENCE:
JB007-22-01936

Supply and Replacement Chilled Water Insulation in Lift Corridor Area


Location: - B1, B2, B3, 2nd floor to 44th floor lift corridor area (G/F floor ,1st floor ,21st floor &43rd floor excluded)

  • Cut and make access to the gypsum ceiling in the corridor area for CHW insulation work.
  • removing damaged old insulation.
  • Supply and replacement of foam insulation with proper insulation tape
  • Supply and apply of canvas cloth with anti-fungus foster  
  • Close to gypsum ceiling with proper channel
  • Supply and apply to stucco with proper finishing
  • Undercoat/primer is supplied and applied as needed.
  • Supply and apply Jotun Fantastic White Paint to the full celling.
  • Proper cleaning and finishing work
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
SAGA International
Horizon Tower Jointly Owned Property
Horizon Tower Jointly Owned Property
Mixed Use

Horizon Tower Dubai Marina, Dubai, United Arab Emirates

Share