Supply and Installation of Split AC Unit
ProductJOB REFERENCE:
JB007-25-02853
Locations and Requirements:
- Ground Floor LV Room : 2 Ton brand Daikin/Carrier unit- 1 Nos
Scope of Work
1. Supply and Installation:
Supply and install new split-type air conditioning units.
2. Indoor and Outdoor Units:
Install indoor and outdoor units, including mounting brackets and vibration
isolators.
3. Refrigerant Piping: Route
and connect refrigerant piping between indoor and outdoor units.
4. Electrical Work: Install
electrical cabling, isolators, and MCBs.
5. Control Wiring: Install
interconnecting control wiring.
6. Drainage: Supply and
install proper drainage piping from the indoor unit to a designated safe
drainage pipeline location.
7. Coring Works: Perform
coring works through walls/slabs for refrigerant piping, drainage lines, and
cabling.
8. Sealing: Seal all core
openings after completion using fire-rated or waterproof sealants as required.
9. Pressure Testing: Conduct
pressure testing of refrigerant lines for leaks.
10. Warranty: Provide a
1-year warranty on all workmanship and installation.
11. Equipment Warranty:
Provide a 1-year comprehensive warranty on the split A/C unit, including
compressor and all major components.
12. Safety Precautions:
Follow proper PPE and safety precautions throughout the installation.
13. Site Visit: Conduct a
site visit prior to installation.
Terms & Condition

SAGA International Owner Association Management Services LLC

Dunya Tower Jointly Owned Property
Residential57VM+V68 - Downtown Dubai - Dubai, Dubai, United Arab Emirates