1. Project Overview
The purpose of this project is to enhance the visual and functional aspects of a lifting station facility. The project includes the fabrication and installation of metal/fiber panels, MS tube structural framing, artificial grass installation in open areas, and installation of driveway blocks for improved accessibility.
2. Objectives
- Improve the aesthetic appeal of the lifting station and plant area.
- Ensure durability, safety, and accessibility of all installations.
- Facilitate future maintenance through easily removable panel systems.
- Maintain functionality and vehicle access to and from the site.
3. Scope of Work
The contractor shall be responsible for the supply, fabrication, and installation of the following:
3.1. Structural Steel Works
- Supply and installation of MS Tube Structure:
- Powder-coated.
- Size: 3x3 inch.
- Thickness: 3mm.
- Fabrication and installation of foundation concrete blocks for structural support.
3.2. Cladding and Covering
- Supply and installation of removable covering panels:
- Material: Metal or fiber.
- Thickness: 3mm.
- Dimensions: 1x2 meters.
- Total covered area: Approx. 850 sqm including walls and roof.
- Height: 8 meters from ground level.
3.3. Artificial Grass Installation
- Surface preparation, levelling, and debris removal.
- Installation of 30mm thick artificial grass.
- Total area: Approx. 625 sqm.
3.4. Driveway Block Installation
- Excavation and levelling of entrance area.
- Laying of concrete bedding for heavy-duty support.
- Installation of driveway blocks over 200 sqm area for vehicle movement.
4. Deliverables
- Complete MS tube structure, securely fixed.
- Fully installed, removable panel system (roof and walls).
- Artificial grass laid and secured.
- Functional driveway area with compacted blocks.
- As-built drawings, material compliance certificates, and maintenance guides.
5. Materials and Equipment
Materials
- MS Tubes (3x3 inch, 3mm thick, powder-coated)
- Fiber or metal panels (3mm thick)
- Concrete (for foundations)
- Artificial grass (30mm)
- Driveway blocks
- Fixing accessories (bolts, screws, fasteners)
Equipment
- Excavator
- Concrete mixer
- Welding and cutting machines
- Lifting equipment (crane/hoist)
- Measuring tools and levels
6. Project Timeline
- Total Duration: 4 weeks (subject to weather and site access conditions)
- Milestones:
- Week 1: Site preparation and foundation works
- Week 2: Structure erection
- Week 3: Panel installation
- Week 4: Grass and driveway block installation
7. Safety and Quality Assurance
- PPE compliance for all workers.
- Safety barriers, signs, and fire extinguishers to be maintained onsite.
- All fabrication and installation work to be inspected and approved by QA/QC prior to proceeding to next phase.
- All materials shall be inspected and tested as per relevant standards before use.
8. Assumptions & Constraints
- Site will be available for uninterrupted work during project duration.
- Utilities and access roads are assumed to be available and in functional condition.
- Any changes in design or material specifications will require approval from the client and may affect cost/timeline.
9. Maintenance Considerations
- All panels will be installed with removable fasteners to allow easy maintenance access.
- Maintenance manuals will be provided for artificial grass and driveway systems.
Terms & Condition
30 DAYS FROM INVOICE

Aspire Lux Jointly Owned Property Management Services LLC

Seven Hotel & Apartments - The Palm
Mixed UsePlot 220, The Trunk, Palm Jumeirah, Dubai, United Arab Emirates, Dubai, United Arab Emirates