RFP FOR LIFTS REFURBISHMENT

Enhancement
Posted On: September 9, 2025
Closing On: April 24, 2026
JOB REFERENCE:
JB6873-25-00137

Elevators: 4 Units

Dismantling & Removal of Elevators

  • Remove existing wall panels, ceiling, flooring, handrails, and other outdated fixtures.
  • Carefully dismantle light fittings, fan covers, and mirrors.
  • Remove skirting, control panel fascia, and false ceiling.

Cabin Interior Works

Wall Panels:

  • Supply and install new decorative panels (stainless steel, laminated finish, or as per approved design).
  • Provide protective skirting at floor level.

Ceiling:

  • Install new ceiling with integrated LED lighting and ventilation fan provision.
  • Use stainless steel/aluminum/laminate finish as per design.

Flooring:

  • Supply and fix heavy-duty, anti-slip vinyl/granite/marble / other approved finish.
  • Ensure proper leveling and alignment.

Mirror & Handrails:

  • Supply and install safety mirror on one side of the cabin (as per design).
  • Install new stainless-steel handrail(s).

Electrical & Lighting Works

  • Install new energy-efficient LED lights with proper wiring connections.
  • Refurbish / replace cabin fan for ventilation.
  • Ensure all electrical work comply with safety standards.

Testing & Commissioning

  • Conduct inspection of refurbished cabin finishes and fixtures.
  • Test lighting, fan, control panel, and communication system (intercom/alarm).
  • Verify safety compliance and proper functioning before handover.
For further technical queries and site visit, please contact Shuaib at 0524410881.

Terms & Condition

As per Dubai Land Department - Real Estate Regulatory Agency (RERA)
We are not authorized to pay advance under any circumstances. The payment will be 100% upon Completion.

APPLY NOW
SABA PROPERTY MANAGEMENT FZCO
SABA PROPERTY MANAGEMENT FZCO
SABA 3
SABA 3
Mixed Use

Cluster Q , Jumeirah Lakes Towers , Dubai, United Arab Emirates

Share