Elevators: 4 Units
Dismantling & Removal of Elevators
- Remove existing wall panels, ceiling, flooring, handrails, and other outdated fixtures.
- Carefully dismantle light fittings, fan covers, and mirrors.
- Remove skirting, control panel fascia, and false ceiling.
Cabin Interior Works
Wall Panels:
- Supply and install new decorative panels (stainless steel, laminated finish, or as per approved design).
- Provide protective skirting at floor level.
Ceiling:
- Install new ceiling with integrated LED lighting and ventilation fan provision.
- Use stainless steel/aluminum/laminate finish as per design.
Flooring:
- Supply and fix heavy-duty, anti-slip vinyl/granite/marble / other approved finish.
- Ensure proper leveling and alignment.
Mirror & Handrails:
- Supply and install safety mirror on one side of the cabin (as per design).
- Install new stainless-steel handrail(s).
Electrical & Lighting Works
- Install new energy-efficient LED lights with proper wiring connections.
- Refurbish / replace cabin fan for ventilation.
- Ensure all electrical work comply with safety standards.
Testing & Commissioning
- Conduct inspection of refurbished cabin finishes and fixtures.
- Test lighting, fan, control panel, and communication system (intercom/alarm).
- Verify safety compliance and proper functioning before handover.
For further technical queries and site visit, please contact Shuaib at 0524410881.
Terms & Condition
As per Dubai Land Department - Real Estate Regulatory Agency (RERA)
We are not authorized to pay advance under any circumstances. The payment will be 100% upon Completion.
APPLY NOW
SABA PROPERTY MANAGEMENT FZCO
SABA 3
Mixed UseCluster Q , Jumeirah Lakes Towers , Dubai, United Arab Emirates