Rectification of Swimming Pool

Services
Posted On: November 24, 2022
Closing On: December 8, 2022
JOB REFERENCE:
JB007-22-02787
Description: Rectification of Swimming Pool

Scope of Works:
- Grouting and acid washing inside the swimming pool
- Media Replacement 900 mm filter - 2 Nos
- Automatic Dosing system replacement – 1 Nos
- Under water pool light replacement – 4 Nos (Brand : Astral)
- Drain cover replacement – 2 Nos
- Vaccum nozzle/plug – 3 Nos (Brand : Astral)
- Replacement of swimming pool Gratings 50 mtr
- Stickering works as per DM requirements.
- Life bouy supply – 2 nos
- Multi-port Valve- 1 Nos
- Chemical supply:
  • Calcium Hypochlorite 45 kg drum
  • Pool Acid 25 kg bag
  • Algeacide 20 Ltr
  • Flocculent 20 Ltr
- Balancing water tank cleaning.
- Wall painting around swimming pool.

Attached the Technical Report for your reference. 

Kindly contact our FM Site Engineer, Mr. Orlino (056 990 3966) if you need any clarification and assistance. 

Thank you. 




Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards

30 days after service completion and submission of successful invoice procedure along with work completion/service reports/delivery note/warranty certificates. 

APPLY NOW
SAGA International
SAGA International
Prime Tower Jointly Owned Property
Prime Tower Jointly Owned Property
Commercial

Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates

Share