Maintenance Of Elevators - AMC

AMC
Posted On: September 26, 2026
Closing On: October 11, 2026
JOB REFERENCE:
JB11974-26-00077

Elevator Maintenance – (Make-Schindler) Monthly - 01/01/2027-31/12/2029)

1. General Scope

The contractor (Schindler authorized or certified service provider) shall provide preventive and corrective maintenance monthly for all elevators in the building, including:

  • Passenger elevators
  • Service/freight elevators
  • Elevator control panels and signalling systems

The AMC shall ensure safe, smooth, and reliable operation, compliance with UAE Fire & Life Safety Code, Dubai Municipality regulations, DEWA safety requirements, and EN/IEC/ASME elevator standards.

2. Preventive Maintenance (Routine Tasks)

2.1 Monthly Checks

  • Visual inspection of car interior, doors, and landing entrances.
  • Check for unusual noise, vibration, or jerks during operation.
  • Test door operation (opening/closing) and safety edges.
  • Lubrication of guide rails, bearings, and moving parts as required.
  • Check car levelling and levelling accuracy at floors.
  • Inspect and clean car top, pit, and hoist way.
  • Test emergency alarm, communication system, and intercom.
  • Verify operational condition of call buttons and floor indicators.
  • Check elevator lighting and ventilation in car.

2.2 Quarterly Checks

  • Inspect traction machine, gearbox, motor, and braking system.
  • Test safety gear, governor, and overspeed devices.
  • Check hoist ropes or belts for wear and proper tension.
  • Inspect buffers in pit for condition and alignment.
  • Test and calibrate door operators and sensors.
  • Review operation of control panels and relays.

2.3 Semi-Annual / Annual Checks

  • Thorough inspection of entire hoist way and machine room.
  • Electrical system inspection including main drive, controllers, and wiring.
  • Functional testing of emergency operation systems and backup systems.
  • Detailed lubrication of all moving components.
  • Verify compliance with safety and signalling regulations.
  • Load test the elevator to ensure performance under rated capacity (if required by authorities).

3. Corrective / Breakdown Maintenance

  • 24/7 response for elevator breakdowns or emergency situations.
  • Fault diagnosis and rectification of mechanical, electrical, or control system failures.
  • Replacement of worn-out components (ropes, brakes, door operators, relays, switches) as per AMC agreement.
  • Record all corrective work and parts replaced.

4. Spare Parts & Consumables -Included in AMC (preventive maintenance):

  • Lubricants, cleaning materials, minor fasteners, brushes, and routine consumables.

Excluded (charged separately if replacement required):

  • Major components such as motors, gearboxes, controllers, doors, or hoist ropes unless specified in AMC.

5. Reporting & Documentation

  • Maintain a logbook for each elevator, recording:
    • Preventive maintenance activities performed
    • Issues identified and corrective actions
    • Date and time of service visits
  • Monthly maintenance report summarizing checks, repairs, and recommendations.
  • Annual summary report with condition assessment and replacement recommendations.

6. Safety & Compliance

  • All maintenance shall follow UAE safety standards, EN 81, ASME A17.1, and Dubai Municipality guidelines.
  • Contractor shall ensure proper isolation and signage during maintenance to prevent accidents.
  • Personnel must use PPE at all times and follow confined space safety for pits and machine rooms.
  • Emergency drills and communication systems to be checked regularly
Terms & Condition

Payment terms: 

 

100% with in 30 Days after work completion and sharing the invoice.

APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
AL GHURAIR RESIDENCE 5
Residential

Plot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates

Share