Maintenance Of Elevators - AMC
AMCJOB REFERENCE:
JB11974-26-00077
Elevator Maintenance – (Make-Schindler) Monthly - 01/01/2027-31/12/2029)
1. General Scope
The contractor (Schindler authorized or certified service provider) shall provide preventive and corrective maintenance monthly for all elevators in the building, including:
- Passenger elevators
- Service/freight elevators
- Elevator control panels and signalling systems
The AMC shall ensure safe, smooth, and reliable operation, compliance with UAE Fire & Life Safety Code, Dubai Municipality regulations, DEWA safety requirements, and EN/IEC/ASME elevator standards.
2. Preventive Maintenance (Routine Tasks)
2.1 Monthly Checks
- Visual inspection of car interior, doors, and landing entrances.
- Check for unusual noise, vibration, or jerks during operation.
- Test door operation (opening/closing) and safety edges.
- Lubrication of guide rails, bearings, and moving parts as required.
- Check car levelling and levelling accuracy at floors.
- Inspect and clean car top, pit, and hoist way.
- Test emergency alarm, communication system, and intercom.
- Verify operational condition of call buttons and floor indicators.
- Check elevator lighting and ventilation in car.
2.2 Quarterly Checks
- Inspect traction machine, gearbox, motor, and braking system.
- Test safety gear, governor, and overspeed devices.
- Check hoist ropes or belts for wear and proper tension.
- Inspect buffers in pit for condition and alignment.
- Test and calibrate door operators and sensors.
- Review operation of control panels and relays.
2.3 Semi-Annual / Annual Checks
- Thorough inspection of entire hoist way and machine room.
- Electrical system inspection including main drive, controllers, and wiring.
- Functional testing of emergency operation systems and backup systems.
- Detailed lubrication of all moving components.
- Verify compliance with safety and signalling regulations.
- Load test the elevator to ensure performance under rated capacity (if required by authorities).
3. Corrective / Breakdown Maintenance
- 24/7 response for elevator breakdowns or emergency situations.
- Fault diagnosis and rectification of mechanical, electrical, or control system failures.
- Replacement of worn-out components (ropes, brakes, door operators, relays, switches) as per AMC agreement.
- Record all corrective work and parts replaced.
4. Spare Parts & Consumables -Included in AMC (preventive maintenance):
- Lubricants, cleaning materials, minor fasteners, brushes, and routine consumables.
Excluded (charged separately if replacement required):
- Major components such as motors, gearboxes, controllers, doors, or hoist ropes unless specified in AMC.
5. Reporting & Documentation
- Maintain a logbook for each elevator, recording:
- Preventive maintenance activities performed
- Issues identified and corrective actions
- Date and time of service visits
- Monthly maintenance report summarizing checks, repairs, and recommendations.
- Annual summary report with condition assessment and replacement recommendations.
6. Safety & Compliance
- All maintenance shall follow UAE safety standards, EN 81, ASME A17.1, and Dubai Municipality guidelines.
- Contractor shall ensure proper isolation and signage during maintenance to prevent accidents.
- Personnel must use PPE at all times and follow confined space safety for pits and machine rooms.
- Emergency drills and communication systems to be checked regularly
Terms & Condition
Payment terms:
100% with in 30 Days after work completion and sharing the invoice.
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
ResidentialPlot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates