GLASS DOOR ( REPLACEMENT IN SP, ALIGNMENT and RECTIFICATION IN RECEPTION AND B1,B2,B3,B4)

Product
Posted On: October 12, 2021
Closing On: October 26, 2021
JOB REFERENCE:
JB007-21-03111
1. Reception Glass Door
Supply of floor machine (1pc) - DORMA MAKE
Alignment of the door
Replacement (Applying ) of the support and cladding
2. B1, B2, B3, B4 Glass Door
Alignment of 4 heavy glass door  
3. Swimming Pool Glass door replacement
Removal of existing glass door
Supply and installation of combination door unit
Consist of 3 fix double glassed glass with 1 aluminum powder coated hinge door

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
SAGA International
Saba Tower 2 Jointly Owned Property
Saba Tower 2 Jointly Owned Property
Mixed Use

Saba Tower 2 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates

Share