FLS - Third party inspection and certification

AMC
Posted On: September 26, 2026
Closing On: October 11, 2026
JOB REFERENCE:
JB11974-26-00078

Third Party Inspection – FIRE FIGHTING SYSTEMS

1. General

The Third-Party Inspection Consultant (TPIC) shall carry out independent inspection, testing, witnessing, and certification of the Fire Fighting System to ensure full compliance with: (Annual)

  • UAE Fire & Life Safety Code of Practice
  • Relevant Civil Défense requirements (DCD)
  • NFPA standards (NFPA 13, 14, 20, 25 – as applicable)
  • Approved drawings and specifications

2. Scope of Services

2.1 Document Review

  • Civil Défense–approved Fire Fighting drawings
  • Hydraulic calculations
  • Fire pump datasheets and curves
  • Material submittals and certificates
  • Method statements and ITPs

2.2 Site Inspection

  • Fire water storage tanks (capacity, access, condition)
  • Fire pump room layout and ventilation
  • Electric fire pump installation
  • Diesel fire pump installation
  • Jockey pump installation
  • Pump controllers and power supply arrangement
  • Fuel tank, batteries, exhaust, and cooling for diesel pump
  • Valves, pipe supports, labelling, and identification

2.3 Network & Equipment Inspection

  • Wet riser / Dry riser systems
  • Breeching inlets
  • Landing valves and cabinets
  • Fire hose reels
  • Sprinkler piping and heads (if applicable)
  • Pressure gauges, flow switches, and test valves

2.4 Testing & Commissioning Witness

  • Hydrostatic pressure testing of piping
  • Fire pump performance test
  • Automatic pump start/stop sequence
  • Pump changeover and failure simulation
  • Flow and pressure test at farthest landing valve
  • Hose reel operation test
  • Diesel pump battery and fuel system test

2.5 Compliance Verification

  • Verification against UAE Fire & Life Safety Code
  • NFPA compliance confirmation
  • Civil Défense inspection readiness
  • Identification and reporting of non-conformances

2.6 Reports & Certification

  • Detailed Third-Party Inspection Report
  • NCR (Non-Conformance Report)
  • NCR closure verification
  • Final compliance letter / inspection certificate
  • DCD Attested certificate

3. Duration

  • Total inspection and certification duration:
    3 working days, subject to site readiness and testing schedule.

4. Contractor Responsibilities

  • Provide access, manpower, and test equipment
  • Arrange all testing activities
  • Rectify deficiencies identified during inspection
Terms & Condition

Payment terms: 

 

100% with in 30 Days after work completion and sharing the invoice.

APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
AL GHURAIR RESIDENCE 5
Residential

Plot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates

Share