FLS - Third party inspection and certification
AMC
Posted On:
September 26, 2026
Closing On:
October 11, 2026
JOB REFERENCE:
JB11974-26-00078
Third Party Inspection – FIRE FIGHTING SYSTEMS
1. General
The Third-Party Inspection Consultant (TPIC) shall carry out independent inspection, testing, witnessing, and certification of the Fire Fighting System to ensure full compliance with: (Annual)
- UAE Fire & Life Safety Code of Practice
- Relevant Civil Défense requirements (DCD)
- NFPA standards (NFPA 13, 14, 20, 25 – as applicable)
- Approved drawings and specifications
2. Scope of Services
2.1 Document Review
- Civil Défense–approved Fire Fighting drawings
- Hydraulic calculations
- Fire pump datasheets and curves
- Material submittals and certificates
- Method statements and ITPs
2.2 Site Inspection
- Fire water storage tanks (capacity, access, condition)
- Fire pump room layout and ventilation
- Electric fire pump installation
- Diesel fire pump installation
- Jockey pump installation
- Pump controllers and power supply arrangement
- Fuel tank, batteries, exhaust, and cooling for diesel pump
- Valves, pipe supports, labelling, and identification
2.3 Network & Equipment Inspection
- Wet riser / Dry riser systems
- Breeching inlets
- Landing valves and cabinets
- Fire hose reels
- Sprinkler piping and heads (if applicable)
- Pressure gauges, flow switches, and test valves
2.4 Testing & Commissioning Witness
- Hydrostatic pressure testing of piping
- Fire pump performance test
- Automatic pump start/stop sequence
- Pump changeover and failure simulation
- Flow and pressure test at farthest landing valve
- Hose reel operation test
- Diesel pump battery and fuel system test
2.5 Compliance Verification
- Verification against UAE Fire & Life Safety Code
- NFPA compliance confirmation
- Civil Défense inspection readiness
- Identification and reporting of non-conformances
2.6 Reports & Certification
- Detailed Third-Party Inspection Report
- NCR (Non-Conformance Report)
- NCR closure verification
- Final compliance letter / inspection certificate
- DCD Attested certificate
3. Duration
- Total inspection and certification duration:
3 working days, subject to site readiness and testing schedule.
4. Contractor Responsibilities
- Provide access, manpower, and test equipment
- Arrange all testing activities
- Rectify deficiencies identified during inspection
Terms & Condition
Payment terms:
100% with in 30 Days after work completion and sharing the invoice.
APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
ResidentialPlot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates