ELV Systems Maintenance
AMC
Posted On:
September 22, 2026
Closing On:
October 7, 2026
JOB REFERENCE:
JB11974-26-00066
ELV Systems (01/01/2027 to 31/12/2029)
1. General Scope
The contractor shall provide preventive and corrective maintenance for all ELV systems in the building, ensuring safety, security, and operational reliability. The AMC shall cover:
- CCTV surveillance systems for common areas, parking, entrances, and perimeter.
- Gate barriers at residential entry/exit points.
- Access control systems for building entrances, amenities, and service areas.
- ANPR (Automatic Number Plate Recognition) for vehicle access management (if installed).
The contractor shall ensure all systems are functioning 24/7 and restore any faults promptly.
2. CCTV System Maintenance
- Routine inspection of cameras and housings in apartments’ common areas, lobbies, staircases, corridors, parking areas, and perimeter.
- Cleaning of camera lenses and housings to maintain clear image quality.
- Checking camera alignment, focus, PTZ functionality, and day/night performance.
- Testing recording systems (NVR/DVR) and verifying storage availability.
- Verifying network connectivity for IP cameras.
- Corrective maintenance for cameras, cables, recorders, or network issues.
- Periodic software/firmware updates for cameras and Video Management System (VMS).
3. Gate Barrier System Maintenance
- Inspect and lubricate mechanical moving parts for smooth operation.
- Test barrier arms, motors, safety loops, and sensors.
- Verify integration with access control or ANPR systems.
- Check electrical panels and control logic for proper functioning.
- Immediate troubleshooting and repair of barriers to avoid entry/exit delays.
4. Access Control System Maintenance
- Routine testing of card readers, biometric readers, keypads, and associated door locks.
- Verification of user credentials and access rights.
- Inspection and testing of electric strikes, magnetic locks, and door controllers.
- Corrective maintenance for hardware, wiring, or software issues.
- Backup and restore of access control database periodically.
- Software updates for access control system.
5. ANPR System Maintenance
- Clean and inspect ANPR cameras at vehicle entry/exit points.
- Test camera alignment, recognition accuracy, and image capture.
- Check integration with access control and gate barriers.
- Maintain vehicle registration database (residents and guests).
- Corrective maintenance for cameras, sensors, or software malfunctions.
6. General Maintenance Requirements
- Conduct preventive maintenance as per agreed schedule (monthly, quarterly, semi-annual).
- Replace minor consumables (cables, connectors, fuses, batteries, small sensors).
- Maintain logs of inspections, repairs, and software updates.
- Provide emergency call-out service for system failures affecting security or access.
- Ensure compliance with UAE regulations, Dubai Municipality, DEWA, and Fire & Life Safety Codes.
- Provide guidance and basic training to the building security staff.
7. Reporting & Documentation
- Monthly report: Work performed, observations, minor issues, and corrective actions.
- Quarterly report: Summary of recurring issues, major faults, and recommendations.
- Annual AMC report: Detailed assessment of ELV systems, suggestions for upgrades or replacements.
- Maintain detailed logbooks for all inspections, maintenance, and corrective work
Terms & Condition
Payment terms:
100% with in 30 Days after work completion and sharing the invoice.
APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
ResidentialPlot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates