Elevator Third Party Inspection and Certificate

AMC
Posted On: September 22, 2026
Closing On: October 7, 2026
JOB REFERENCE:
JB11974-26-00067

Third Party Inspection – ELEVATOR / LIFT SYSTEMS

1. General

The Third-Party Inspection Consultant (TPIC) shall inspect, test, and certify elevator systems to ensure compliance with: (In Each 6 Months)

  • EN 81 / ASME A17.1 standards
  • UAE local authority requirements
  • Manufacturer’s recommendations
  • Approved shop drawings and specifications

2. Scope of Services

2.1 Document Review

  • Approved shop drawings and layouts
  • Manufacturer’s technical data sheets
  • Load capacity and speed calculations
  • Installation method statements
  • Factory test certificates

2.2 Installation Inspection

  • Lift shaft dimensions, pit depth, and headroom
  • Guide rails alignment and fixing
  • Machine room or MRL installation
  • Hoisting machine, motor, and brake system
  • Suspension ropes/belts and terminations
  • Counterweight assembly
  • Lift car structure, flooring, mirrors, handrails
  • Landing doors, sills, and clearances

2.3 Electrical & Safety Inspection

  • Control panel wiring and labelling
  • Earthing and bonding
  • Limit switches and safety devices
  • Door interlocks and safety edges
  • Emergency alarm and intercom
  • Automatic Rescue Device (ARD)
  • Emergency lighting and ventilation

2.4 Testing & Commissioning Witness

  • No-load and full-load testing
  • Speed and levelling accuracy test
  • Door operation and obstruction test
  • Emergency stop and alarm test
  • Power failure and rescue operation test
  • Fireman’s lift operation (if applicable)

2.5 Compliance Verification

  • Compliance with EN 81 / ASME A17.1
  • Local authority and safety code compliance
  • Identification of non-conformances

2.6 Reports & Certification

  • Third-Party Inspection Report
  • NCR issuance and closure verification
  • Final inspection certificate

3. Duration

  • Total inspection and certification duration (up to 5 lifts):
    ⏱ 2 working days
Terms & Condition

Payment terms: 

 

100% with in 30 Days after work completion and sharing the invoice.

APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
AL GHURAIR RESIDENCE 5
Residential

Plot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates

Share