Cleaning Of Garbage chute - AMC

AMC
Posted On: September 26, 2026
Closing On: October 11, 2026
JOB REFERENCE:
JB11974-26-00074

Garbage chute cleaning (01/01/2027-31/12/2029)

1. General

Provide an Annual Maintenance Contract (AMC) for complete garbage chute cleaning and routine maintenance, repair, and replacement of garbage trolley/bin wheels, including all labour, supervision, tools, equipment, consumables, and minor spare parts as specified.

2. Garbage Chute Cleaning (Quarterly)

  • Complete internal cleaning, washing, and sanitization of the garbage chute from top floor intake to ground floor discharge point.
  • High-pressure / mechanical cleaning of internal chute walls to remove grease, sludge, food residue, and bacterial buildup.
  • Application of approved disinfectant and deodorizing chemicals.
  • Cleaning and disinfection of hopper doors at all floors.
  • Cleaning of garbage room discharge area, floor, and surrounding walls.
  • Final sanitization and Odor control to leave the chute hygienic and odour-free.

3. Garbage Chute Trolley / Bin Maintenance

  • Routine inspection of garbage trolleys/bins located in garbage rooms.
  • Checking condition of trolley/bin wheels (casters), brackets, bearings, and fasteners.
  • Lubrication and tightening of wheel assemblies where required.
  • Alignment and functional testing of trolley movement.

4. Wheel Repair & Replacement

  • Repair of minor wheel defects including loose fittings, minor bearing issues, and wheel alignment.
  • Replacement of damaged, broken, cracked, or non-functional wheels/casters.
  • Supply and installation of standard-duty replacement wheels suitable for garbage trolleys.
  • Ensure replaced wheels are properly fixed, aligned, and tested for smooth and safe operation.

Note: Contractor to include unit rates for wheel replacement in the AMC or specify number of wheels included per year.

5. Materials & Spare Parts

  • Use durable, corrosion-resistant wheels suitable for wet and waste-handling environments.
  • All spare parts to be compatible with existing trolley/bin models.
  • Major spare parts (beyond AMC allowance), if any, to be quoted separately upon approval.

6. Safety & Hygiene

  • Use of appropriate PPE during cleaning and maintenance works.
  • Proper sealing of chute openings during cleaning activities.
  • Safe disposal of wastewater and debris in accordance with municipality regulations.
  • Maintain cleanliness of common areas during and after works.

7. Compliance

  • Works shall comply with:
    • UAE Health & Safety regulations
    • Local Municipality and building management requirements
  • Contractor responsible for hygiene, safety, and Odor control standards throughout the AMC period.

8. AMC Inclusions

  • Scheduled cleaning services as per agreed frequency (monthly / quarterly / as specified).
  • Routine trolley/bin inspections during each visit.
  • Minor repairs and adjustments.
  • Wheel replacement as per agreed AMC scope or unit rate schedule.

9. Exclusions (Unless Otherwise Specified)

  • Replacement of entire garbage trolley/bin
  • Structural repair or modification of garbage chute
  • Removal of major blockages
  • Pest control services
  • Supply of non-standard or heavy-duty specialty wheels (unless approved separately)

10. Performance Standard

  • Garbage chute to remain clean, hygienic, and free from persistent odour.
  • Garbage trolleys to remain operational, safe, and easy to manoeuvre.
  • Any defects identified during inspections to be attended promptly as per AMC response time

11. Maintenance schedule

  • Quarterly all with deep cleaning
  • 24x7 Free unlimited Call out services
  •  
Terms & Condition

Payment terms: 

 

100% with in 30 Days after work completion and sharing the invoice.

APPLY NOW
OSOOL ASSET MANAGEMENT SERVICES L.L.C
OSOOL ASSET MANAGEMENT SERVICES L.L.C
AL GHURAIR RESIDENCE 5
AL GHURAIR RESIDENCE 5
Residential

Plot No. 645-7562 @ Al ghurair Residence 5 Living Legend - Wadi Al Safa 3 - Dubai, Dubai, United Arab Emirates

Share