Search Jobs
Break Down
Mixed Use
Al Furjan , Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Parking Way Concrete Floor Crack Repair and Exposed Reinforcement Rectification Works
Scope of Work:
Inspect the parking way concrete floor to identify all cracked, deteriorated, loose, and damaged areas.
Remove the damaged and loose concrete from the affected areas, including the section where the reinforcement...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Pergola Painting and External Wooden Fence Refurbishment Works
Scope of Work:
Inspect the building pergola and external wooden fences to assess the damaged and deteriorated areas.
Remove all loose, faded, and damaged paint from the pergola.
Clean and prepare the pergola surface for repainting.
Repair minor c...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Installation of Emergency Exit Door at Rear Side Near Swimming Pool
Scope of Work:
Provide an alternative access and emergency exit door at the rear side of the building near the swimming pool, as there is currently no access or door at this location.
Supply and install the door with a width of 1.2 meters.
Car...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of Damaged Wall and Planter Top Tiles, Wall Cracks, and Gypsum Ceiling – Reception Entrance Area
Scope of Work:
Remove the damaged limestone/marble tiles from both sides of the reception entrance area walls and planter top.
Rectify the source of water ingress from the adjacent planter irriga...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of Roof Exhaust Fan, FAHU-01 & 02 Duct Cladding, Shaft Openings, and Cement Sheet Wall Opening
Scope of Work:
Thoroughly inspect the damaged roof exhaust fan and FAHU-01 & 02 duct cladding to identify the extent of damage.
Repair or replace any damaged, loose, or deteriorated duct cladding ...
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
At La Vista Residence 1 (Dubai Silicon Oasis, Dubai, UAE), an inspection revealed a safety non-compliance regarding the swimming pool area. Specifically, there is no physical barrier separating the adult and children's pools, which violates the New Dubai Municipality Public Swimming Pool Safety Guidelines. This omission p...
Break Down
Residential
Plazzo Residence, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Water leakage has been observed from the planter boxes located near the reception entrance of Plazzo Residence. The existing planter boxes have sustained damage and require replacement to address the leakage issue and restore the appearance and functionality of the reception entrance area.
A total of 6 damaged planter boxes ...
Rectification of Pantry Cabinetry – Apricot Tower (JB004-26-04536)
Break Down
Mixed Use
Apricot Tower Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Pantry Cabinetry Rectification Works – Apricot Tower
The contractor/vendor shall carry out the following works from the Ground Floor to the 12th Floor:
Carry out a floor-by-floor inspection of all pantry cabinets.
Identify damaged cabinet units, boards, doors, base sections, joints, gaps, hinges, handles, sup...
Rectification Of Ground Floor Column & Wall plaster - LV3 (JB004-26-04368)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the inspection at La Vista Residence 3, Dubai Silicon Oasis, Dubai, UAE, damage was observed to the external plaster finish of the ground floor columns and walls.
The affected areas exhibited water seepage, plaster deterioration, and paint peeling at multiple locations up to an approximate height ...
Rectification of Facade Glass Silicone Sealant (JB004-26-04303)
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During façade cleaning activities, the façade cleaning team identified localized deterioration and separation of the silicone sealant at the overhang area 31st Floor. The condition was immediately reported and visually inspected.
The affected sealant joint is located in an area that is not directly access...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Basement 2 Parking Area Wall Seepage Treatment, Mold Removal, Repair & Repainting Works
Scope of Work:
Carry out seepage treatment, mold removal, wall repair, and repainting works to the affected wall surfaces around the Basement 2 parking area.
Conduct a detailed inspection of the affected wall areas to iden...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Internal & External Building Boundary Wall Repair and Repainting Works
Scope of Work:
Carry out repair and repainting works for the damaged and deteriorated internal and external wall surfaces around the building boundary.
Conduct a detailed inspection of all internal and external wall surfaces around the bui...
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Anti-Slip Strips with Anti-Slip Epoxy Coating – Staircase 1 & Staircase 2
Scope of Work:
Remove the existing damaged and detached anti-slip strips from Staircase 1 and Staircase 2.
Carry out proper surface preparation before application of the new anti-slip coating.
Apply Anti-Slip Epox...
Removal & Replacement Of Signage Board- Hilliana Tower (JB004-26-03821)
Break Down
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The purpose of this project is to remove and replace the existing ABYAAR signage board located at the top level (29th Floor) of the building with a new HILLIANA Tower signage board incorporating LED illumination.Based on the preliminary assessment, the proposed signage system shall be designed and installed to provide a durab...
Rectification of RCC Watertank Waterproofing-LSR (JB004-26-02980)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the scheduled cleaning of the Basement-3 and Rooftop water tanks, an internal visual inspection was carried out to assess the condition of the tank interiors. The inspection revealed that the existing waterproofing coating on the internal reinforced cement concrete (RCC) surfaces had significantly deteriorated due to a...
Replacement of Damage Tile Divider Aluminium Plate-LSR (JB004-26-02979)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
A site inspection was conducted at the external ground floor building entrance following the identification of a damaged 75 mm aluminum tile divider plate strip. The inspection confirmed that the existing strip had deteriorated due to prolonged wear and exposure to external environmental conditions. As a result, the strip was...
Cleaning & Removal Of Oil Stain Parking Area Road-LSR (JB004-26-02977)
Break Down
Mixed Use
Lakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, an oil stain was observed on the parking area road adjacent to the tower. Based on site observations, the contamination appears to have resulted from oil leakage from a garbage collection vehicle operating within the community. The presence of oil on the road surface creates an unsightly appearance...
Rectification Of Wall Plaster-LV1 (JB004-26-02975)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
AT LAVISTA RESIDENCE 1 Dubai Silicon Oasis,
During the site inspection at La Vista Residence-1, Dubai Silicon Oasis, it was observed that the plaster on the ground floor boundary wall and columns has deteriorated, with visible cracks and damaged sections. These defects have adversely affected the overall app...
Installation of Bird Net At Parking - LV1 (JB004-26-02974)
Break Down
Residential
La Vista Residence 1, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection at La Vista Residence-1, Dubai Silicon Oasis, it was observed that birds are frequently perching on exposed plumbing lines, firefighting pipelines, and cable trays within the parking area. As a result, bird droppings are accumulating on parked vehicles and surrounding floor surfaces, creating unhygi...
Replacement of Dust Bins - Riviera Dreams (JB004-26-02973)
Break Down
Mixed Use
Riviera Dreams, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, it was observed that the existing dust bins in the designated smoking areas are old, plastic, and unsuitable for their intended use. The current bins do not meet the required standards for durability, fire safety, or building aesthetics, resulting in a poor visual appearance and reduced functionali...
Rectification Of Damaged External (ACP) Cladding -Bermuda Views (JB004-26-02963)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, multiple areas of damage were identified in the building's external Aluminium Composite Panel (ACP) cladding, particularly at the rooftop and ground floor levels. Several ACP panels were found to be damaged, with some appearing loose or inadequately secured, presenting a potential safety risk t...
Rectification of Epoxy Floor Coating Parking Area-Bermuda Views (JB004-26-02962)
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
An inspection of the parking areas extending from the Ground Floor to Basement 2 identified significant deterioration of the existing epoxy floor coating, painted traffic markings, and associated parking accessories due to continuous vehicular traffic, environmental exposure, and normal operational wear. The epoxy coating has...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection of the garbage room, several maintenance deficiencies were identified that require immediate rectification. The wall tiles were found to be loose, popped up, and damaged at multiple locations, posing potential safety and maintenance concerns. Additionally, the ceiling paint has deteriorated and requ...
Break Down
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
During the site inspection, multiple deficiencies were identified in the rooftop Fresh Air Handling Units (FAHU-1 to FAHU-6), affecting both the mechanical and electrical systems. The observed defects include extensive corrosion and deterioration of FAHU casings, damaged heat recovery components, defective pressure and temper...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification of Loose Concrete on Upper Exterior Façade and Concrete Spalling Repair
Scope of Work
Inspect the upper exterior façade, including the area above location 404 (4th Floor), to identify all loose and damaged concrete.
Remove all loose and deteriorated concrete from the affected fa&c...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Leakage Rectification of Waste Pipe Inside Enclosed Plumbing Riser and Ceiling Reinstatement at Podium Lift Lobby
Scope of Work
Provide access to the enclosed plumbing riser through the master room bathrooms of series apartments.
Demolish the riser wall at 3 to 4 locations to identify the exact leakage poi...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Repair of Loose and Cracked Concrete at Exterior Wall Above Apartment 404 (4th Floor)
Scope of Work
Carry out inspection of the loose concrete section at the exterior wall above Apartment 404 (4th Floor).
Remove all loose and damaged concrete from the affected area.
Repair the existing cracks in the concrete sur...
Break Down
Residential
The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Cutting of Gypsum & Decorative Ceiling and Installation of Access Panel for Gym Room & Gym Lobby AC Unit
Scope of Work
Cutting of the existing gypsum ceiling to create access for the Gym Room & Gym Lobby AC unit.
Cutting and modification of the existing round decorative sheet ceiling at the Gym Lobby ...
replacement of damage floor tiles-LV3 (JB004-26-02260)
Break Down
Residential
La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location: La Vista Residence 3, Dubai Silicon Oasis, Dubai, United Arab Emirates
A detailed inspection of the lift lobby areas from the Ground Floor (GF) to the Health Club (HC) Floor identified extensive damage to both floor and wall tiles. The observed defects include cracked, broken, hollow, loose, chipped, and uneven til...
Break Down
Mixed Use
Meydan, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Conduct a detailed leakage investigation to identify the exact source of water ingress affecting Parking #48.
Perform non-destructive testing and utilize specialized leak detection equipment where required.
Inspect the poolside area, waterproofing system, slab structure, and associated building elem...
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Basement Ceiling Leakage Rectification, PU Injection Grouting & Ground Floor Flooring Restoration• Inspect and mark all leakage points, cracks and damp area on basement ceiling. • Remove loose plaster, paint and weak concrete form affected areas. • Drill cracks and install PU injection packers for grouting. ...
Showing 51 to 81 of 81 results