17th Floor Damaged Chilled Water Line Insulation Rectification
EnhancementJOB REFERENCE:
JB007-25-03393
Dear Service Providers,
Greetings from ASTECO!
We are seeking for proposals for the below detailed scope of work at Dorra Bay Tower located in Marina, Dubai.
Chilled Water Line Riser Insulation Work at 17th floor.
1. Removing existing insulation.
2. De-rusting & Re-painting rusted area
including pipe support valve, bolts & and bare pipe metal parts after
cleaning make sure that no leakage.
3. Re-installation of new XLPE insulation with
proper glue & Aluminium tape
4. Works shall be carried out with well-trained
works
5. Removal of waste & cleaning of work area.
6. Cutting the existing gypsum ceiling wherever we
required for insulation work
7. Re-fixing the ceiling works and all equipment
after insulation
8. Re-paint all areas matching to existing paint
9. Work Area cleaning.
10. Warranty must be 10 years
11. All the arrangement must be cover by service
provider
NOTE: Warranty must be mentioned in the proposal.
For clarification and site visit, please contact of site FM Supervisor Mr. Nayyer at 055 132 0667.
Terms & Condition

Asteco (operated under License by SAGA International Owner Association Management Services LLC)

Dorra Bay Tower Jointly Owned Property
ResidentialDorra Bay Tower Dubai Marina, Dubai, United Arab Emirates