Consultancy Services for Delta T Improvement DG2
Services
Posted On:
July 24, 2025
Closing On:
August 20, 2025
JOB REFERENCE:
JB007-25-03333
1. Project Overview
Dubai Gate 2, located in Jumeirah lake towers - cluster A , Dubai is facing low chilled water Delta T
issues. This has led to inefficient cooling performance and a notice from EMPOWER regarding
potential penalties starting August 2025.
The tower is equipped with:
➢ Honeywell BMS system with IQX Programming tools
➢ FAHUs and FCUs serving common and residential areas
➢ Chilled water supply by Empower with submetering via Aquacool
2. Consultancy Objective
To appoint a qualified MEP or Energy Efficiency Consultant to:
• Analyze the current Delta T issue
• Diagnose technical and operational inefficiencies
• Develop detailed engineering solutions
• Prepare tender documents for implementation
• Provide support through tendering, evaluation and supervision
3. Scope of Consultant’s Services
Stage 1: Site Assessment & Technical Study
• Conduct physical inspection of ETS room, pumps, heat exchangers, valves, controls
• Review as-built drawings, historical data (DEWA, Empower, BMS)
• Study BMS configuration, logic, and Delta T trend history
• Analyze submetering (Aquacool) and identify gaps
Stage 2: Diagnosis & Feasibility Report
• Identify root causes (e.g., flow imbalance, coil fouling, faulty valves)
• Assess performance of key HVAC assets
• Submit a technical report with baseline values and ECMs
Stage 3: Design & Tender Documentation
• Develop concept design
• Prepare RFP for implementation (BOQ, specs, drawings)
• Define Delta T targets and system requirements
Stage 4: Tendering Support
• Assist in issuing RFP to vendors
• Evaluate submissions and submit comparison report
• Support contractor selection
Stage 5: Post-Award Support
• Review submittals and attend site meetings
• Provide commissioning and M&V support
4. Expected Deliverables
• Site Assessment Report
• Root Cause Analysis Report
• Design & Justification Report
• Tender Package
• Technical Evaluation Matrix
• M&V Framework
5. Target Timeline
The consultancy engagement should be completed within 6–8 weeks, excluding post-award support.
6. Prequalification Requirements
• Experience in Delta T or chilled water optimization in the UAE
• Familiarity with district cooling systems and EMPOWER
• Experience with Siemens,Honeywell BMS / integrators
• Minimum 2 references for similar projects
7. Submission Requirements
• Company Profile and Trade License
• Team CVs (Energy Engineers/HVAC specialists)
• Methodology and project approach
• Commercial proposal (separately)
• Sample M&V or Delta T report
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
As per standards
Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
APPLY NOW

Asteco (operated under License by SAGA International Owner Association Management Services LLC)

Dubai Gate 2 Jointly Owned Property
ResidentialDubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates