West Wharf - Rectification of water leakage from Calorifier pipe at inside the riser
Services
Posted On:
January 16, 2025
Closing On:
January 21, 2025
JOB REFERENCE:
JB007-25-00151
Scope of Work:
• Protect work area with proper barricading.
• Shutdown the existing line before starting the rectification.
• Supply and installation of temporary working platform with necessary support for access
provision to the leak affected area.
• Service provider should carryout Pull test with third party certificate for load bearing for
the temporary platform before starting the rectification work.
• Removal of existing insulation.
• Carryout the water leakage rectification with proper method.
• Testing and commissioning.
• Supply and installation of insulation as per the requirements and standard.
• Quotation amount should be in breakdown wise.
Any clarifications/inquiries, kindly contact Mr. Balu at +971561649806
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
West Wharf Jointly Owned Property
ResidentialWest Wharf Tower Business Bay, Dubai, United Arab Emirates