Supply and Installation of New Sewage Pump
Services
Posted On:
May 13, 2025
Closing On:
May 28, 2025
JOB REFERENCE:
JB007-25-01465
As per attached document.
Supply:
o Provision of one (1) new sewage pump with specifications with below suitable for the building’s requirements.
o KSB SAS
o F-59320
o Make: KSB
o P2 17KW/ 400/590V/50HZ/40*C
o Type : KRT. K 80 315 / 172 UG-9
o Model No :30/5574
o OUT LET/ INLET – 3 Inch
o Q-534.01/ US GPM / H-20M
o NO: 9971402918/ 18/ 700/ 5828
o RPM-2940 1/M / 31.5 / 18.3A/ Cos@ / HZ-50.
o IP68 / SI / IA / IN 8:30 / 187 KG/ Class F.
o DKN 150.2-11 3
o Ideal no: 01, 093 893 ZN 3826 M22
o Delivery of the pump to the site.
1. • Installation:
o Dismantling and removal of the existing pump.
o Installation of the new sewage pump, including alignment, anchoring, and necessary mechanical fittings.
o Electrical connections and integration with the control panel.
o Testing and commissioning of the newly installed pump to verify proper operation.
2. • Additional Work:
o Minor modifications to piping or electrical as required for compatibility.
o Cleaning and restoration of the work area upon completion.
o Handover of warranty documents and user manual.
3. Timeline: Work to be completed within [Insert Timeframe] from the date of approval.
4. Safety and Compliance: All works shall be performed in accordance with applicable local safety standards and municipal regulations.
5. Deliverables:
• Fully installed and operational sewage pump.
• Completion report including installation details and test results.
• Manufacturer’s warranty and maintenance instructions.
6. Warranty & Support:
• Provide [Insert number]-year warranty on materials and workmanship.
• Offer post-installation support for any adjustments or issues.
• Any damage caused to building components or accessories during the work shall be repaired at the contractor’s expense.
• Obtain necessary work permits and approvals from relevant authorities for delivery and storage.
❖ Warranty and support: The supplier must provide warranty.
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
As per standards
APPLY NOW

SAGA International
Dubai Gate 1 Jointly Owned Property
ResidentialDubai Gate 1 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates