Supply and installation of Adult & Kids Pool Tiles and Water Proofing Works

Services
Posted On: November 25, 2025
Closing On: December 2, 2025
JOB REFERENCE:
JB007-25-04827
Supply and installation of Adult & Kids Pool Tiles and Water Proofing Works

SCOPE OF WORK:

1. Demolition & Site Preparation

• Removal of existing pool tiles and underlying screed from the designated pool

area.

• Careful dismantling to avoid damage to surrounding structures.

• Collection, removal, and legal disposal of all debris and waste materials to a

municipality-approved yard

 

 

2. Waterproofing Works

• Surface Preparation: Clean and prepare the exposed concrete substrate to

ensure proper bonding.

• Supply and Installation of Bitumen Membrane:

o Application of bitumen waterproofing membrane as per best industry

practices.

o Membrane thickness to be 4 or mm minimum should be 2 layers.

o Overlaps shall be no less than 100 mm at side laps and 150 mm at end

laps, fully torch-applied to ensure complete adhesion and seal.

• Membrane application to cover all pool surfaces including walls and floor

 

 

 

3. Tiling Works

• Supply and Installation of Pool Tiles:

o Supply and lay pool-grade waterproof tiles over the specified area of

[170 m²].

o Tiles to be suitable for constant water immersion and resistant to pool

chemicals.

• Epoxy Grouting:

o All tile joints to be filled with epoxy grout, ensuring durability, water

resistance, and chemical resistance across the entire area.

 

 

 

4. Civil Works

• All necessary civil works related to surface levelling, patching, slope

correction, screed application, and preparation for tiling are to be included in

the contractor’s scope

- Any necessary repairs to the pool structure to be carried out prior to

waterproofing.

 

 

5. Delivery & Warranty

• The contractor is to propose the shortest possible delivery and completion

period without compromising on quality and workmanship.

• Longest warranty period to be offered on both waterproofing and tile

installation, with details provided in the quote.

• Minimum 5 years warranty

• Flood test of newly waterproofed area for 72 hours.

 

 

Please ensure all materials used are approved for pool applications and comply with relevant local building codes and international standards



Community: Yacht Bay Tower
Location: Marsa Street, Dubai Marina
Site Contact: MEP Supervisor Mr. Sufyan: +971 52 956 2017
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Yacht Bay Tower Jointly Owned Property
Yacht Bay Tower Jointly Owned Property
Residential

Yatch Bay Tower Dubai Marina, Dubai, United Arab Emirates

Share