Replacement of GRP Water Tanks
Services
Posted On:
April 15, 2025
Closing On:
April 29, 2025
JOB REFERENCE:
JB007-25-01143
As per attached document.
❖ Safety & Site Preparation
• Secure the proposed work area with proper barricading to ensure safety and prevent unauthorized access.
• Implement necessary precautions to safeguard existing assets in the vicinity of the work area.
• Isolate all existing water supply and service connections as per client scope to facilitate safe and efficient execution.
❖ Removal & Disposal
• Remove and dispose of all existing damaged GRP tanks and associated waste at a municipality-approved disposal site.
❖ Supply & Installation of GRP Sectional Water Tanks
• Service Floor Tanks:
• Supply and install 2 Nos GRP sectional water tanks (hot-pressed, insulated).
• Tank Size: 7.5m (L) x 5m (W) x 2.5m (H).
• Supply and install 2 Nos GRP sectional water tanks (hot-pressed, insulated).
• Tank Size: 8m (L) x 3.5m (W) x 2.5m (H).
• Supply and install 1 No GRP sectional water tanks (hot-pressed, insulated).
• Tank Size: 2.5m (L) x 2m (W) x 2.5m (H).
• Rooftop Tanks:
• Supply and install 3 Nos GRP sectional water tanks (hot-pressed, insulated).
• Tank Size: 7m (L) x 6m (W) x 2m (H).
❖ Accessories & Fittings
• Ladders: Provide and install inside and outside ladders as per tank size for safe and convenient maintenance access.
• Flanges, Fittings, and Valves: Install sectional and discharge components as per design specifications.
• Level Indicator: Install tube-type level indicator with a level-marked aluminum frame for monitoring water levels.
• Float Valves: Supply, install, and test float valves for automated water level regulation.
• Overflow Connections: Install overflow connections to manage excess water efficiently.
• Air Vent Systems: Provide air vents to ensure proper airflow and pressure regulation within the tanks.
• Manholes: Include secure and durable manhole covers for inspection and maintenance access.
❖ Piping & Testing
• Remove and reinstall all incoming and outgoing pipes, fittings, and connections to align with the new tanks as required.
• Ensure proper sealing and alignment of all pipe connections to prevent leaks.
• Conduct water pressure tests and functional checks to confirm the integrity and performance of the installed tanks.
• Address any identified issues to ensure compliance with operational standards.
❖ Warranty & Documentation
• Provide a 10-year warranty on all installed GRP water tanks, covering material defects, workmanship, and performance.
• Submit a completion report detailing the work performed, including installation records, test results, and compliance verification.
• Submit the tank data sheet for client review and approval before installation.
• Notes
❖ Contractor to do detailed site survey during the mandatory site visit.
❖ Proposal shall consist of all the material requirements and measurements. Any variation requests after issuing LPO or thereafter will not be accepted by client.
❖ Any services, item of work or small detail not specifically mentioned but inferred and necessary for the satisfactory operation of the system or installation shall be provided by the Contractor without any additional cost to the Client.
❖ Contractor will arrange their own materials/equipment when needed for carrying out the work.
❖ Contractor is responsible to use their own tools (third-party certified) and access equipment whenever needed for satisfactory completion of job.
❖ It is the responsibility of the contractor to follow all applicable Dubai Municipality and UAE regulations.
For any site assistance, contact Marshad at 050 625 8292.
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
As per standards