Replacement of Cloth Shades in Car Parking & Kids Play Area
Services
Posted On:
October 5, 2025
Closing On:
October 20, 2025
JOB REFERENCE:
JB007-25-04175
Replacement of Cloth Shades in Car Parking & Kids Play Area
Site Survey &
Assessment
- Carry out site
inspection to verify existing structural supports, connections, and
dimensions.
- Confirm that
the existing frames and foundations are structurally sound and suitable
for reinstallation of new shade cloths.
Removal of
Existing Shade Cloths
- Carefully
remove the old and dirty shade cloths without damaging the steel/aluminium
support structures.
- Collect and
dispose of the old material as per Dubai Municipality waste management
regulations.
Supply of New
Shade Cloths
- Provide high-quality
fabric (HDPE or PVC-coated polyester) with the following minimum
specifications:
- UV protection: ≥ 95% to
protect vehicles and children from harmful sun rays.
- Fire retardant: Certified
and approved by Dubai Civil Defence (DCD).
- Heat and
weather resistance: Withstand extreme Dubai
climate.
- Dust resistant
and easy to clean.
- Warranty: Minimum 5–10
years for the fabric.
- Fabric to be
certified by Dubai Central Laboratory (DCL) or equivalent.
Installation of New Shade Cloths
- Stitch and
reinforce the cloth edges with double/triple seam for extra strength.
- Install shade
cloths using stainless steel eyelets, tensioning wires, and fixing
accessories for durability.
- Ensure cloths
are stretched properly with no sagging or loose edges.
- Provide
child-safe finishing in the play area (no sharp edges or exposed
fittings).
Quality, Safety & Compliance
- All works to
comply with:
- Dubai
Municipality regulations for structural safety.
- Dubai Civil
Defence (DCD) requirements for fire-retardant materials.
- Health &
Safety guidelines for child play areas.
- Use of personal
protective equipment (PPE) and safe working practices during
installation.
- Conduct site
safety checks before and after work completion.
Final Cleaning
& Handover
- Clean the site
after completion of installation.
- Submit product
data sheets, compliance certificates, and warranty documents.
- Perform joint
inspection with client before handover.
Building Location:
SITE: ROYAL OCEANIC
SITE ENGINEER: SIMIN - +971 58 189 5025
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW

SAGA International Owners Association Management Services LLC

Royal Oceanic Jointly Owned Property
ResidentialRoyal Oceanic, Dubai Marina, Dubai, United Arab Emirates