Repair of B2 & B3 Structural Cracks and Leaking Joints
Break DownJOB REFERENCE:
JB2190-25-00081
1. Crack and Joint Repair — Resin Injection
a. Active/Seeping Cracks (Waterproofing Purpose)
-
Perform resin injection using Polyurethane for all active or water-seeping cracks.
-
Ensure proper surface preparation and injection to achieve effective waterproofing.
b. Dry Cracks (Structural Bonding Purpose)
-
Perform resin injection using Epoxy for all dry and dormant cracks.
-
Ensure adequate penetration for structural bonding and crack sealing.
2. Concrete Repair Works
a. Delaminated/Damaged Concrete Removal
-
Carefully remove all deteriorated and loose concrete from the affected areas.
-
Ensure no damage to adjacent sound concrete during removal.
b. Reinforcement Treatment
-
Clean exposed corroded reinforcement thoroughly to remove rust and contaminants.
-
Supplement reinforcement where necessary to restore structural capacity.
c. Concrete Reinstatement
-
Reinstate removed concrete using Micro-concrete or C50 Ready Mix Concrete depending on site conditions.
-
Ensure proper curing and finishing as per technical standards.
3. Waterproofing Repairs
a. Injection Sealing
-
Perform injection sealing of the following critical points:
-
Construction joints
-
Kicker joints
-
Pipe penetrations
-
-
Use suitable resin materials to prevent further water ingress.
b. Protective Waterproof Coatings
-
Apply high-performance waterproof coatings to repaired surfaces as a protective barrier.
-
Ensure uniform coverage and adherence to manufacturer recommendations.
Additional Notes
-
All works to be performed as per relevant technical standards and project specifications.
-
Ensure adequate health, safety, and environmental (HSE) practices during execution.
-
Testing and quality assurance procedures to be implemented throughout the works.
Terms & Condition
The Supplier certifies that to the best of his knowledge and belief no economic, beneficial, or managerial relationship exists between the Supplier and any employee of Itihad Community Management (ICM) or between Supplier and any relative of an employee of ICM or any of its agents, which would tend in any way to influence such employee in performance of his or her duties on behalf of ICM or its agents in connection with the awarding, making, amending, or making a determination concerning performance of its proposal the work or the agreement.
Exchanges or offering of any money, gift item, personal service, entertainment or unusual hospitality by the Supplier to the employees or agents is expressly prohibited. This prohibition is equally applicable to officers, employees, or immediate family members of ICM’s agents. Any violation of this provision constitutes a material breach of ICM’s terms of agreements.
ICM may by written notice to the Supplier disqualify and reject the Supplier’s proposal and terminate the agreement without any liability whatsoever on part of ICM or any of its agents if finding (a) that vendor violated the certification contained in this declaration regarding conflict of interest; or (b) that gratuities were offered or given by the Supplier or any of its employees , agents or representatives, to any officers or employees of ICM or its agents awarding making and/or amending an RFP document or agreement or securing favorable treatment with respect to the performance of such agreement.
Itihad Community Management is not under any obligation to accept the lowest or any proposal.
In the event the Management deems the work unsatisfactory or encounters delays, it reserves the right to impose penalties on the Service Provider or terminate this Work Order with a 3-day prior notice.

ITIHAD COMMUNITY MANAGEMENT

Marina View Towers
ResidentialMarina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates