Reception Area Renovation
Services
Posted On:
March 16, 2023
Closing On:
April 3, 2023
JOB REFERENCE:
JB007-23-00756
Reception Area Renovation
• Replace the furniture and counter table
• Replace the Fan Coil Unit 2.5Ton
• Paint the wall by stucco paint.
• Repaint the ceiling.
• Install the welcoming music system.
• Replace the new LED lights.
• Marble crystallization.
• Replace the plants and pots.
Site Visit is required.
Please submit design.
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
As per standards
APPLY NOW

SAGA International

Marina Wharf 1 Jointly Owned Property
Mixed UseMarina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates