Proposal for High Pressure PVC Pipeline Leak Rectification works in Riser- IT PLAZA
Break Down
Posted On:
January 14, 2025
Closing On:
July 4, 2025
JOB REFERENCE:
JB004-25-00256
Scope of Work
Wall Demolition at the Eighth Floor:
- Carefully demolish the specified wall on the eighth floor, ensuring minimal disruption to the surrounding structure and facilities.
- Remove all debris from the demolition site and dispose of it in compliance with local regulations.
Cutting and Repairing the High-Pressure PVC Pipe:
- Cut and repair the 4.0-inch diameter high-pressure PVC pipe in the riser at the eighth floor.
- Perform the repair using approved materials and methods to ensure the integrity of the pipe and its high-pressure capabilities.
- Test the pipe post-repair to confirm functionality and check for any leaks.
Block Wall Construction:
- Construct a new block wall in the same location as the demolished wall, using high-quality materials matching the existing structure specifications.
- Ensure proper alignment, leveling, and structural stability of the new wall.
Plastering of the New Wall:
- Apply a smooth plaster finish to the newly constructed wall.
- Use materials and techniques that ensure a durable and uniform surface.
Painting of the New Wall:
- Prepare the plastered wall surface for painting, including cleaning, priming, and filling imperfections.
- Apply paint in the color and finish specified by the client, ensuring an even and professional appearance.
Final Cleaning and Handover:
- Clean the work area thoroughly after completing all tasks.
- Conduct a final inspection with the client to ensure satisfaction and address any concerns.
APPLY NOW

HOAM- Highrise Owners Association Management

IT Plaza
Mixed UseIT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates