Mechanical Electrical Plumbing (MEP) Break Down

Break Down
Posted On: November 22, 2022
Closing On: November 29, 2022
JOB REFERENCE:
JB007-22-02776
Supply and installation of rainwater pipe line as per existing size.
Small drain trap pit outside the pathway. 15cmx15cm.
To connect to main line / repair of rainwater line.
After completing the work, to finish affected area as per existing.
Related earth works/ masonry works
Testing / Handover of rainwater line.
 Site inspection to provide proposals with plan.
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW
SAGA International
SAGA International
The Residences North Jointly Owned Property
The Residences North Jointly Owned Property
Mixed Use

The Fairmont North Residences Palm Jumeirah, Dubai, United Arab Emirates

Share