Block B - Drain Line Modification in Basement Floor

Break Down
Posted On: November 18, 2022
Closing On: November 27, 2022
JOB REFERENCE:
JB007-22-02751
Block B - Drain Line Modification in Basement Floor
Supply and installation of drainage pipeline at
Basement: Qty:01
Removal of existing 4" drainage pipeline.
Supply and installation of new UPVC Drainage
pipeline approx..140mtr
Pipe size 6" x 02, lines. with hanging material.
Supply and installation of Reducer T connection all
required locations. On of existing branch.
Supply and installation of clean out socket
Making of coring on drainage tank and connection for
both side"02nos.
Leak testing and handover etc.

Warranty: 1 Year
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
SAGA International
Balqis Residence Jointly Owned Property
Balqis Residence Jointly Owned Property
Mixed Use

Balqis Residence Palm Jumeirah West Crescent, Dubai, United Arab Emirates

Share