(12 Months) Fire Alarm & Fighting System Contract

Contract
Posted On: July 29, 2026
Closing On: August 14, 2026
JOB REFERENCE:
JB11484-26-00113

Note

Dear Service Provider, Site visit is strictly prohibited without prior appointment, Any direct visit will disqualify you. You may send a site visit request as response to this RFP or by sending an email to jopm@skyline-livings.com

Building Name - Tasmeer Residence (BF+GF+4F+RF), JVC, Dubai

Build Area (sqft.) - 87,000

Type - Residential + Retail

Number of Units – 103

Contract Period - 01-Jan-2027 to 31-Dec-2027 (12-months)

B6.04 - Fire Fighting System

1. Scope of Work

The Contractor shall provide comprehensive preventive maintenance, inspection, testing, servicing, and emergency breakdown support for the building's fire protection systems to ensure compliance with UAE Civil Defence requirements.

A. Fire Alarm System

Maintenance and testing of:

  • Fire Alarm Control Panels
  • Fire Alarm Devices
  • Smoke Detectors
  • Heat Detectors
  • Manual Call Points
  • Sounders and Alarm Bells
  • Flashers / Beacons
  • Fire Telephone System
  • Public Address (PA) System
  • Voice Evacuation System
  • Fire Repeat Panels
  • All associated wiring, loops, interfaces, and accessories.

B. Fire Fighting System

Inspection and maintenance of:

  • Fire Pumps
  • Jockey Pumps
  • Diesel Engine Fire Pump
  • Landing Valves and Hose Reels
  • Breeching Inlets
  • Sprinkler System
  • Wet Riser System
  • Dry Riser System
  • Hydrant System
  • Deluge Valves (where applicable)
  • Fire Water Storage Tank connections and associated valves.

C. Emergency & Exit Lighting

Maintenance and testing of:

  • Emergency Lighting
  • Exit Signs
  • Central Battery System (if installed).

D. Fire Extinguishers

  • Inspection of portable fire extinguishers.
  • Functional checks and service recommendations where required.

 

2. Preventive Maintenance Frequency

The Contractor shall carry out preventive maintenance as follows:

System

Frequency

Fire Alarm System

Quarterly (4 visits/year)

Fire Fighting System

Quarterly (4 visits/year)

Emergency & Exit Lights

Quarterly (4 visits/year)

Fire Extinguishers

Annual inspection/service

Fire Pumps

Monthly operational checks (as specified in the maintenance schedule)

 

3. Contractor Responsibilities

The Contractor shall:

  • Perform routine inspection, testing, and preventive maintenance.
  • Rectify faults arising from normal wear and operation.
  • Maintain all systems in accordance with UAE Civil Defence requirements.
  • Provide emergency breakdown support during the contract period.
  • Supply qualified technicians, tools, testing equipment, and standard consumables required for maintenance.
  • Maintain service records and submit maintenance reports after each visit.
  • Notify the Skyline Livings Representative of defects requiring replacement parts or additional works.

---------------------------------------------------------------------------------------------------------------------------

 

 

APPLY NOW
SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
SKYLINE LIVINGS OWNER ASSOCIATION MANAGEMENT SERVICES L.L.C
Tasmeer Residence
Tasmeer Residence
Residential

JVC District 10, Jumeirah Village Circle, Dubai., Dubai, United Arab Emirates

Share