Upgradation of CCTV System (Hotel)

Break Down
Posted On: November 20, 2024
Closing On: November 26, 2024
JOB REFERENCE:
JB007-24-03241

Dear Service Providers,

 

Greetings from SAGA International!

 

We would like to request a Proposal for Upgradation of CCTV System (Hotel) for our building Laguna Tower located in JLT Cluster A Dubai.


SCOPE OF WORKS


  • CCTV SYSTEM REQUIREMENTS - REFER TO THE ATTACHED BOQ
  • CIVIL WORKS/REQUIREMENTS

  1. Patching and repainting walls or ceilings where new conduits/camera mounts were installed, if applicable
  2. Patching holes or surface areas left from previous camera or conduit installation.
  3. Painting or refinishing surfaces to restore to original condition.
  4. Modifying or creating access points in false ceilings for cable routing or camera installation
  5. Fixing and closing the ceiling opening.
  6. Sealing all conduit or cable entry points to prevent moisture or pests.
  7. Backfilling and compacting after cable placement, if applicable
  8. All exposed wiring must be concealed and protected.
  9. Safe removal of old cameras, mounts, poles, conduit, cables, and housing.
  10. Disconnection of power and data cables from control panels or junction boxes, if applicable.
  11. Proper cable management and maintenance access.
  12. Adding new power outlets or circuits to handle the increased load, if applicable
  13. Sealing all outdoor conduits, junction boxes, and mounts to protect against rain and moisture.
  14. Maintain the cleanliness of the work area.

  • NOTE: WARRANTY MUST BE MENTIONEDON THE PROPOSAL

For site visit, please contact, Mr. Mr. Mohsin at 052 516 7823 to arrange schedule.

 

Kindly address the proposal to:

 

SAGA International Owner Association Management Services LLC

 For:                         Laguna Tower Jointly Owned Property, Dubai

TRN:                       100389381300003

Contract Address:   1102-1103, Damac Executive Heights, Barsha Heights, Dubai - UAE

 

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards
APPLY NOW
SAGA International
SAGA International
Laguna Tower Jointly Owned Property
Laguna Tower Jointly Owned Property
Mixed Use

Laguna Tower Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates

Share