Swimming Pool Area Renovation and Modernization

Enhancement
Posted On: November 10, 2026
Closing On: November 25, 2026
JOB REFERENCE:
JB2190-26-00314

Project: Marina View Towers – Towers A & B  
Location: Dubai Marina, Dubai, UAE  

Please refer to the attached technical report for the exact locations requiring renovation and modernization.

The scope of work includes the following activities but not limited to:

1. Swimming Pool Deck and Wall Tiles

   - Remove existing damaged and deteriorated tiles from the swimming pool deck and surrounding walls.
   - Supply and install new Cheverton tiles, matching the existing tile type, finish, and design where already installed.
   - Ensure proper surface preparation, waterproofing where required, installation, grouting, and finishing.

2. Swimming Pool Deck Tile Color Scheme
   - Install dark beige tiles along the swimming pool border.
   - Install beige-colored tiles across the entire swimming pool deck flooring.
   - Ensure the tiles are slip-resistant, durable, and suitable for outdoor swimming pool areas.

3. Changing Room Renovation
   - Renovate and upgrade the existing changing rooms with a modern, elegant, and functional design.
   - Replace damaged wall and floor tiles, fixtures, fittings, and accessories as required.
   - Provide suitable lighting, ventilation, and high-quality moisture-resistant materials.

4. Shower Area Renovation
   - Remove and replace existing shower area wall and floor tiles with modern, anti-slip tiles.
   - Inspect and rectify waterproofing, drainage, and plumbing fittings where required.
   - Ensure proper finishing and water drainage.

5. Replacement of Floor-Recessed Lights
   - Remove existing damaged or non-functional floor-recessed decorative lights.
   - Supply and install new high-quality, waterproof LED floor lights suitable for outdoor use.
   - Ensure safe electrical connections and proper sealing.

6. Replacement of Lighting Poles
   - Remove existing deteriorated lighting poles around the swimming pool area.
   - Supply and install new, modern, weather-resistant lighting poles with energy-efficient LED fixtures.
   - Ensure proper installation, electrical safety, and adequate illumination.

7. Swimming Pool Internal Tile Repair and Regrouting
   - Identify and replace all damaged, cracked, loose, or missing tiles inside the swimming pool.
   - Carry out necessary regrouting using approved swimming pool-grade waterproof grout.
   - Ensure a smooth, durable, and uniform finish.

8. Replacement of Underwater Swimming Pool Lights
   - Remove existing damaged or inefficient underwater pool lights.
   - Supply and install high-quality, bright, energy-efficient, IP68-rated LED underwater lights suitable for swimming pool use.
   - Ensure safe electrical connections, testing, and commissioning.

9. Replacement of Decorative Pool Fittings
   - Inspect all existing decorative fittings and features inside the swimming pool.
   - Replace damaged, corroded, broken, or deteriorated decorative fittings with new, durable, swimming pool-compatible materials.
   - Maintain consistency with the overall swimming pool design.

10. Provision for Decorative Planters
    - Identify and develop suitable designated spaces for decorative planters around the swimming pool deck.
    - Provide proper finishing, drainage arrangements, and integration with the surrounding landscape.
    - Ensure planters do not obstruct pedestrian movement, emergency access, or swimming pool safety requirements.

11. Treatment and Removal of Sand, Scale, and Deposits from Swimming Pool Tiles
    - Conduct thorough inspection and cleaning of existing swimming pool tiles to remove accumulated sand, dirt, calcium scale, mineral deposits, and stubborn stains.
    - Apply suitable swimming pool tile cleaning and descaling treatments using approved chemicals and equipment.
    - Remove deposits from tile surfaces, joints, corners, and other affected areas without damaging existing tiles or grout.
    - Restore the original appearance and cleanliness of the swimming pool tiles as far as practically possible.
    - Carry out final cleaning, water quality testing, and necessary treatment before reopening the swimming pool.

General Contractor Requirements

- Conduct a detailed site inspection and verify all measurements before submitting the quotation.
- Submit material samples, tile color samples, product specifications, and proposed renovation design for approval before commencement.
- Provide a detailed itemized quotation, including quantities, material specifications, labor, and installation costs.
- Ensure all materials are high-quality, durable, weather-resistant, and suitable for swimming pool environments.
- Protect existing equipment, facilities, and surrounding areas during renovation.
- Remove and dispose of all construction debris at approved disposal locations.
- Carry out necessary testing, commissioning, and final cleaning upon completion.
- Submit warranty certificates, as-built details where applicable, and a work completion report.
- All works shall comply with applicable Dubai Municipality requirements and relevant health and safety standards.
 

Important Note:
Material quality shall not be compromised. The contractor must ensure premium-quality workmanship, modern aesthetics, long-term durability, and safety. All proposed materials, designs, colors, and finishes shall be subject to prior approval by Itihad Community Management.
The contractor shall submit a proposed renovation layout or 3D design, where applicable, to demonstrate the final appearance of the swimming pool and surrounding areas before commencement.

Vendors should only submit a fully detailed proposal after site visit to ensure the full scope of work required and access conditions are fully understood.

Terms & Condition

Payment terms are 30 days after submission of Invoice to accounts@itihad.co.ae (read receipt requested) along with signed work completion or service report and any other documents required by the bank to release funds from RERA regulated escrow account

The Supplier certifies that to the best of his knowledge and belief no economic, beneficial, or managerial relationship exists between the Supplier and any employee of Itihad Community Management (ICM) or between Supplier  and any relative of an employee of ICM or any of its agents, which would tend in any way to influence such employee in performance of his or her duties on behalf of ICM or its agents in connection with the awarding, making, amending, or making a determination concerning performance of its proposal the work or the agreement.

Exchanges or offering of any money, gift item, personal service, entertainment or unusual hospitality by the Supplier to the employees or agents is expressly prohibited. This prohibition is equally applicable to officers, employees, or immediate family members of ICM’s agents. Any violation of this provision constitutes a material breach of ICM’s terms of agreements.  

ICM may by written notice to the Supplier disqualify and reject the Supplier’s proposal and terminate the agreement without any liability whatsoever on part of ICM or any of its agents if finding (a) that vendor violated the certification contained in this declaration regarding conflict of interest; or (b) that gratuities were offered or given by the Supplier or any of its employees , agents or representatives, to any officers or employees of ICM or its agents awarding making and/or amending an RFP document or agreement or securing favorable treatment with respect to the performance of such agreement. 

Itihad Community Management is not under any obligation to accept the lowest or any proposal.

 

In the event the Management deems the work unsatisfactory or encounters delays, it reserves the right to impose penalties on the Service Provider or terminate this Work Order with a 3-day prior notice.

APPLY NOW
ITIHAD COMMUNITY MANAGEMENT
ITIHAD COMMUNITY MANAGEMENT
Marina View Towers
Marina View Towers
Residential

Marina VIew Tower, Dubai Marina, Dubai, UAE, Dubai, United Arab Emirates

Share